Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility (건설공사 공기연장 책임구분을 위한 지연사유 관리 모델)

  • Kim, Jong-Han;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.31-41
    • /
    • 2011
  • Since the cases of time extension have continuously transpired in the public construction project, the potential of economical loss and claims is increasing because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for time extension. One of the main reasons is that the present planning and scheduling do not support the method to apportion the proper responsibility to the right party. This problem has repeatedly led to time extension and made it difficult for the concerned parties to perform the responsibility for time extension. In order to overcome this problem, a framework of delay administration is required as the method to apportion the proper responsibility to the right party. To solve this problem, this paper aimed to develop the conceptual model and prototype system as the practical method to administrate delay causation. Furthermore, the verification result for the reliability and applicability throughout the case studies on real construction projects shows that the conceptual model and prototype system developed would help efficiently to administrate the delay causation.

A Legal Study on liability for damages cause of the air carrier : With an emphasis upon liability of passenger (항공운송인의 손해배상책임 원인에 관한 법적 고찰 - 여객 손해배상책임을 중심으로 -)

  • So, Jae-Seon;Lee, Chang-Kyu
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.28 no.2
    • /
    • pp.3-35
    • /
    • 2013
  • Air transport today is a means of transport that is optimized for exchanges between nations. Around the world, has experienced an increase in operating and the number of airline route expansion that has entered into the international aviation agreements in order to take advantage of the air transport efficient, but the possibility of the occurrence of air transport accidents increased. When compared to the accident of other means of transport, development of air transport accidents, not high, but it leads to catastrophe aviation accident occurs. Air Transport accident many international transportation accident than domestic transportation accident, in the event of an accident, the analysis of the legal responsibility of the shipper or the like is necessary or passenger air carrier. Judgment of the legal order of discipline of air transport accident is a classification of the type of air transport agreement. Depending on the object, air transport agreements are classified into the contract of carriage of aviation of the air passenger transportation contract. For casualties occurs, air passenger transportation accident is a need more discussion of legal discipline for this particular. Korean Commercial Code, it is possible to reflect in accordance with the actual situation of South Korea the contents of the treaty, which is utilized worldwide in international air transport, even on the system, to control land, sea, air transport and welcoming to international standards. However, Korean Commercial Code, the problem of the Montreal Convention has occurred as it is primarily reflecting the Montreal Convention. As a cause of liability for damages, under the Commercial Code of Korea and the contents of the treaty precedent is reflected, the concept of accident is necessary definition of the exact concept for damages of passengers in particular. Cause of personal injury or death of passengers, in the event of an accident to the "working for the elevation" or "aircraft" on, the Montreal Convention is the mother method of Korea Commercial Code, liability for damages of air carrier defines. The Montreal Convention such, continue to be a matter of debate so far in connection with the scope of "working for the lifting of" the concepts defined in the same way from Warsaw Convention "accident". In addition, it is discussed and put to see if you can be included mental damage passenger suffered in air transport in the "personal injury" in the damage of the passenger is in the range of damages. If the operation of aircraft, injury accident, in certain circumstances, compensation for mental damage is possible, in the same way as serious injury, mental damage caused by aviation accidents not be able to live a normal life for the victim it is damage to make. So it is necessary to interpret and what is included in the injury to the body in Korea Commercial Code and related conventions, non-economic damage of passengers, clearly demonstrated from the point of view of prevention of abuse of litigation and reasonable protection of air carrier it must compensate only psychological damage that can be. Since the compensation of delay damages, Warsaw Convention, the Montreal Convention, Korea Commercial Code, there are provisions of the liability of the air carrier due to the delayed arrival of passenger and baggage, but you do not have a reference to delayed arrival, the concept of delay arrangement is necessary. The strict interpretation of the concept of delayed arrival, because it may interfere with safe operation of the air carrier, within the time agreed to the airport of arrival that is described in the aviation contract of carriage of passenger baggage, or, these agreements I think the absence is to be defined as when it is possible to consider this situation, requests the carrier in good faith is not Indian or arrive within a reasonable time is correct. The loss of passenger, according to the international passenger Conditions of Carriage of Korean Air, in addition to the cases prescribed by law and other treaties, loss of airline contracts, resulting in passengers from a service that Korean Air and air transport in question do damage was is, that the fact that Korean Air does not bear the responsibility as a general rule, that was caused by the negligence or intentional negligence of Korean Air is proof, negligence of passengers of the damage has not been interposed bear responsibility only when it is found. It is a clause in the case of damage that is not mandated by law or treaty, and responsible only if the negligence of the airline side has been demonstrated, but of the term negligence "for" intentional or negligent "Korean Air's Terms" I considered judgment of compatibility is required, and that gross negligence is appropriate. The "Korean Air international passenger Conditions of Carriage", airlines about the damage such as electronic equipment that is included in the checked baggage of passengers does not bear the responsibility, but the loss of baggage, international to arrive or depart the U.S. it is not the case of transportation. Therefore, it is intended to discriminate unfairly passengers of international flights arriving or departure to another country passengers of international flights arriving or departure, the United States, airlines will bear the responsibility for the goods in the same way as the contents of the treaty it should be revised in the direction.

  • PDF

A Study on the Claim for Damages for Detention resulted from the Breach of Safe Port Warranty under Voyage Charter (항해용선계약상 안전항담보의무위반에 의한 초과정박손해배상금의 청구에 관한 연구)

  • Han, Nak-Hyun
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.149-176
    • /
    • 2009
  • In Count case, the owners claimed from the charterers the amount of their loss resulting from the delay to the Count caused by the blockage of the channel due to stranding of the Pongola on the ground that this loss resulted from breach by the charterers of the safe port provisions. The Claim was referred to arbitration and dealt with on written submission. In a reasoned award, the arbitrators upheld the owners' claim. The charterers seek an order reversing the award or remitting it to the arbitrators for further consideration : (1) That the tribunal was wrong to find that the port of Beira was unsafe and that in consequence the charterers were liable to the owners in damages for detention. (2) That the tribunal was wrong to find that the port was unsafe in the abstract by reference to the fact that two other vessels had grounded there. (3) Having held that the Count was delayed for a little over four days by the fact that, after the charterers had nominated the port, the Pongola had grounded in the access channel, the tribunal should have held that the port was not prospectively unsafe. On the that the grounding the Pongola was caused by the characteristics which made the port an unsafe port to nominate for the Count. The court was held that it was not an independent event which broke the chain of causation between the breach of contract and the owner's loss. For those reasons, the court was upheld the arbitrator's award.

  • PDF

Energy-aware Selective Compression Scheme for Solar-powered Wireless Sensor Networks (태양 에너지 기반 무선 센서 네트워크를 위한 에너지 적응형 선택적 압축 기법)

  • Kang, Min Jae;Jeong, Semi;Noh, Dong Kun
    • Journal of KIISE
    • /
    • v.42 no.12
    • /
    • pp.1495-1502
    • /
    • 2015
  • Data compression involves a trade-off between delay time and data size. Greater delay times require smaller data sizes and vice versa. There have been many studies performed in the field of wireless sensor networks on increasing network life cycle durations by reducing data size to minimize energy consumption; however, reductions in data size result in increases of delay time due to the added processing time required for data compression. Meanwhile, as energy generation occurs periodically in solar energy-based wireless sensor networks, redundant energy is often generated in amounts sufficient to run a node. In this study, this excess energy is used to reduce the delay time between nodes in a sensor network consisting of solar energy-based nodes. The energy threshold value is determined by a formula based on the residual energy and charging speed. Nodes with residual energy below the threshold transfer data compressed to reduce energy consumption, and nodes with residual energy above the threshold transfer data without compression to reduce the delay time between nodes. Simulation based performance verifications show that the technique proposed in this study exhibits optimal performance in terms of both energy and delay time compared with traditional methods.

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

Article 61bis of the Aviation Business Act and the Legal Principles for the Aviation Consumers Protection - Comparison with the U.S. "Tarmac Delay Rule" - (항공사업법 제61조의2 신설과 항공소비자 보호 법리 -미국의 "Tarmac delay rule"과 비교를 중심으로-)

  • Baek, Kyeong-Won;Hwang, Ho-Won
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.35 no.2
    • /
    • pp.169-195
    • /
    • 2020
  • With the increase in air transportation, air delays are inevitable, and the damage of air consumers is also increasing. In Korea, the Ministry of Land, Infrastructure and Transport announced 「the Criteria for Protection of Users of Air Transportation」, but the Criteria does not include aviation delays except Tarmac delay, but this criteria is a only public notice, not an Act. Lately, a clause about Tarmac delay was newly established as Article 61bis of the Aviation Business Act, and was enacted from May 27, 2020. The Air carriers' Tarmac delay are subject to mandatory regulations. This research showed how lawsuits were implemented for the protection of aviation consumers related to aviation delays prior to the imposition of this article. In addition, the study examined at the public law level, whether the protection rights of aviation consumers is the fundamental right under the Constitution and whether the government should be the main subjects of consumer protection. And then we studied the effect of enforcement about the Tarmac Delay Rule of the United States. This rule acts as a federal regulation. Subsequently, the Biscone case presented that it was not easy for the US court to accept a lawsuit against the passengers for tarmac delay. There are limitations in remedying the damages of airline consumers due to delays either in Korea trial or the U.S. trial. Finally it needs strengthening the penalty to secure the effectiveness of the Tarmac delay clause regulations. In order to protect airline consumers, it was proposed that the protection of aviation consumer law should be established through the revision as the Enforcement Rules of the Airline Business Act.

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF