• Title/Summary/Keyword: 지식기반일정계획

Search Result 14, Processing Time 0.026 seconds

Platform development of adaptive production planning to improve efficiency in manufacturing system (생산 시스템 효율성 향상을 위한 적응형 일정계획 플랫폼 개발)

  • Lee, Seung-Jung;Choi, Hoe-Ryeon;Lee, Hong-Chul
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.2
    • /
    • pp.73-83
    • /
    • 2011
  • In the manufacturing system, production-planning is very important in effective management for expensive production facilities and machineries. To enhance efficiency of Manufacturing Execution System(MES), a manufacturing system that reduces the difference between planning and execution, certain production-planning needs a dispatching rule that is properly designed for characteristic of work information and there should be a appropriate selection for the rule as well. Therefore, in this paper dispatching rule will be selected by several simulations based on characteristics of work information derived from process planning data. By constructing information that are from simulation into ontology, one of the knowledge-based-reasoning, production planning platform based on the selection of dispatching rule will be demonstrated. The platform has strength in its wider usage that is not limited to where it is applied. To demonstrate the platform, RacerPro and Prot$\acute{e}$g$\acute{e}$ are used in parts of ontology reasoning, and JAVA and FlexChart were applied for production-planning simulation.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

A Blackboard-Based Scheduling Expert System (흑판모델을 이용한 일정계획 전문가 시스템)

  • Park, Ji-Hyeong;Gang, Mu-Jin;Lee, Gyo-Il
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.1
    • /
    • pp.14-23
    • /
    • 1996
  • Scheduling jobs effectively under consideration of actual loads on machines is one of the most complicated tasks in production control. The complexity of the finite capacity scheduling often makes the conventional methods of industrial engineering fail. As an alternative, Knowledge-based approaches to job-shop scheduling have been evolved recently. This paper presents a blackboard- based scheduling expert system which combines knowledge-based scheduling with interactive scheduling. It is shown to be possible to generate the feasible schedule within a reasonable time. Flexible reaction management is also possible while keeping the changes in the generated schedule to the minimal and adjusting the schedule to tardy operations or working environmental changes. The system is equipped with a rule base with heuristics for handling conflicted event. A case study applying the implemented system is described.

Development of Knowledge-base system for Scheduling considering Work Assignment (작업할당을 고려한 일정계획의 지식기반 시스템 개발에 관한 연구)

  • 이재일;신용백
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.185-195
    • /
    • 1997
  • In this paper, research and applications of a knowledge-base system in scheduling are review. The method is based on the problem-solving techniques developed in artificial intelligent. The object of this paper is to enable the re-time rescheduling under dynamic environments. Developed to KBS(Knowledge-Based Scheduling) system in this paper, will based on expert system, and applicate to requirement of users effectively.

  • PDF

A Method of Extending a Multiagent Framework with a Plan Generation Module (계획생성 모듈을 갖는 멀티에이전트 기반구조의 확장방법)

  • Lee, Gowang-Lo;Park, Sang-Kyu;Jang, Myong-Wuk;Min, Byung-Eui;Choi, Joong-Min
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.9
    • /
    • pp.2280-2288
    • /
    • 1997
  • An agent is a software element that, by making use of knowledge and inference, performs tasks on behalf of the user. In general, an agent has the properties of autonomy, social ability, reactivity, and durability. Many researches on agents are more and more aiming at the multiagent systems since it is not sufficient to let a single agent do the whole things, especially in a real world where tasks require many diverse activities. However, the multiagent frameworks still have some limitations in the processing of user queries that are often ambiguous and goal-oriented. Also, a series of procedures or plans could not be generated from a single query directly. In order to give more intelligence to the multiagent framework, we propose a method of extending the framework with a plan generation module. The open agent architecture (OAA), which is a multiagent framework that we developed, is integrated with UCPOP, which is a AI planner. A travel schedule management agent (TSMA) system is implemented to explore the effects of the method. The extended system enables the user to only specify goal-oriented queries, and the plans and procedures to satisfy these goals are generated automatically. Also, this system provides a cooperative and knowledge-sharing environment that integrates several knowledge-based systems and planning systems that are distributed and used independently.

  • PDF

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

Hierarchical User Intention-Response Model using Behavior Network (행동 네트워크를 이용한 계층적 사용자 의도대응 모델)

  • Yoon, Jong-Won;Cho, Sung-Bae
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2011.06c
    • /
    • pp.315-318
    • /
    • 2011
  • 최근 인간-컴퓨터 상호작용 분야에 있어서 사용자와의 원활한 협력을 위해 각종 센서 정보로부터 사용자 의도를 인식하고 행동을 예측하여 대응하는 의도대응 인터페이스에 대한 연구가 주목 받고 있다. 이는 사람들 사이에서는 자연스러운 일이며, 인간의 의도대응 과정을 모방하여 공학적으로 구현하는 연구가 활발히 진행 중이다. 본 논문에서는 보다 효과적으로 사용자의 의도에 대응하기 위해서 거울 뉴런과 마음의 이론을 기반으로 하는 사람의 의도대응 과정을 분석하고 이를 바탕으로 인터페이스에 적용 가능한 의도대응 방법을 제안한다. 본 논문에서는 센서로부터 즉각적으로 인식하여 대응 가능한 기본의도와 추가적인 지식을 통해 추론 가능하며 기본의도의 조합으로 이루어진 복합의도에 대해 계층적으로 대응하는 방법을 제안한다. 제안하는 방법은 행동네트워크를 이용하여 기본의도에 대해 즉각적으로 대응을 생성하며, 복합의도에 대하여 계획 기반 방법을 통해 대응 시퀀스를 생성하고 대응을 수행한다. 제안하는 방법은 일정 관리와 집안 관리 서비스를 제공하는 인공비서 시스템에 적용되었으며, 다양한 의도와 상황에 대한 생성 대응을 분석함으로써 사용자의 의도와 관측된 행동을 반영하여 적합한 대응을 생성함을 확인하였다.

인하대학교 "광기술교육센터"를 찾아서...

  • Park, Ji-Yeon
    • The Optical Journal
    • /
    • s.111
    • /
    • pp.22-25
    • /
    • 2007
  • 지식기반형 첨단기술의 특성을 갖고 있는 광학산업은 신기술 경쟁이 치열하고 라이프 사이클도 짧아 끊임없는 기술창출이 이뤄져야 한다. 더욱이 중소기업 위주의 국내 광학산업의 수준은 선진국에 비해 낮은데다 선진국으로부터의 첨단기술 이전은 거의 불가능하다. 이러한 국내 여건 속에 핵심기반기술인 정밀광학렌즈 및 광학박막기술의 확보를 위해서 5년간 인력양성교육을 실시한 인하대학교 광기술교육센터가 총 3372여명의 교육생을 배출한데 이어, 올해부터 다시 5년간의 일정으로 정밀광학기술 전문인력양성교육에 들어갔다. 광학기술 인력 확보가 결국 우리 산업경쟁력의 척도라는 대전제 하에 국내 광학기술 보급 및 전문인력 양성의 메카로 성장한 인하대학교 광기술교육센터를 찾아, 황보창권 센터장으로부터 운영현황 및 계획에 대해 들어보았다.

  • PDF

Automatic Project Planning Technique and Tool Based on Software Industry Requirements (소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구)

  • Park, Jihun;Shin, Donghwan;Hong, Gwangui;Seo, Dongwon;Hwa, Jimin;Bae, Gigon;Seo, Yeong-Seok;Bae, Doo-Hwan
    • Journal of Software Engineering Society
    • /
    • v.26 no.4
    • /
    • pp.77-92
    • /
    • 2013
  • To plan a software project, the manager (1)make a work breakdown structure (WBS), (2) estimate efforts for each task, (3) assign employee to each task, and (4) estimate overall schedule. When software project becomes complicated, the possible combination of WBS, effort, and employee assignments dramatically becomes larger. Software planning tool can help software project managers to deal with this complexity. In this research, we discuss with a group of experts who work in software industry, to elicit practical requirements that should be considered in the software planning technique. Considering these requirements, we develop a software project planning tool APP (Automatic Project Planner) which provide effort estimation based on historical knowledge data and automatic human resource allocation. Our technique can be the basis of reasonable and practical software project planing.

  • PDF