A Study on the Estimation Method of Rock Load Applied to Concrete Lining Using Back Analysis (역해석을 이용한 콘크리트라이닝 지반 이완하중 산정방법 연구)

  • Park, Ki Hwan;Shin, Young Wan;Kim, Jung Joo;Yoo, Han Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1957-1968
    • /
    • 2013
  • Design criteria for rock load on tunnel concrete lining has not been established yet. Generally rock load on tunnel concrete lining is empirically estimated, which leads to a conservative design. Ordinary estimation method of rock load includes various problems. Estimating by numerical analysis is very complicated and has not been verified with field measurements. Therefore, it is necessary to conduct a study on practical method of estimating rock load which is more accurate to the real rock load on tunnel concrete lining. This study, presents estimation method of rock load on tunnel concrete lining. Crown settlement of the tunnel construction site has been measured and it was been back analyzed to estimate the rock load. The rock load was estimated to be smaller compare to the ordinary estimation method.

Evaluation of rock load based on critical shear strain concept on tunnels (한계전단변형률 개념을 이용한 터널의 지반이완하중 평가)

  • Kim, Jung-Joo;Lee, Jae-Kook;Kim, Jong-Uk;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.637-652
    • /
    • 2013
  • After studying the characteristics of three different evaluation methods of rock load; namely theoretical method, empirical method and numerical method, there were too many limitations for them to be applied on tunnels. Therefore, in this research paper, the method based on numerical analysis is selected to use as this method is the most reasonable one since it considers all parameters that are necessary for rock load estimations, and it also considers the interaction between ground and tunnel support. The critical shear strain concept formulated by Sakurai (1981) was used in order to measure exact rock load values based on numerical analysis. Evaluation on a Level 1 rock load height, which is depicted by the stable region in the graph shows that rock load is not affecting between ground grade 1~3, and it was evaluated that the fourth and fifth grades show less values of rock load height which led to the conclusion of a more economical design of concrete lining.

Evaluation of rock load based on stress transfer effect due to tunnel excavation (굴착으로 인한 응력전이효과를 고려한 터널의 지반이완하중 평가)

  • Lee, Jae-Kook;Kim, Jung-Joo;Rehman, Hafeezur;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.999-1012
    • /
    • 2017
  • Theoretical, empirical and numerical methods are used to evaluate the rock load due to tunnelling. Theoretical and empirical methods do not consider ground conditions, tunnel shape, and construction conditions. However, through numerical analysis, it is possible to analyze the displacement and stresses around tunnel due to its excavation, and evaluate the rock load considering ground and construction conditions. The stress transfer ratio(e) which is defined as a ratio of the difference between the major and minor principal stresses to major principal stress is used in order to understand the stress transfer effect around the tunnel excavation using numerical analysis results. The loosend area around tunnel periphery was found based on this approach. The difference of rock load from stress transfer effect was found according to the ground grade. From comparison, rock load obtained from stress transfer effect (e = 10%) were somewhat larger than the results obtained from the critical strain method, but smaller than those obtained from theoretical and empirical methods. The stress transfer effect approach considers the ground condition, tunnel shape; therefore, it can be applied to evaluate the rock load in concrete lining design.

A Study on Earth Pressure Calculating Method about Shield TBM Tunnel Segments in the Rock (암반층에서 쉴드 TBM 터널 세그먼트의 작용하중 산정방법에 관한 연구)

  • Chun, Byungsik;Ki, Jungsu;Kang, Taehee;Kwag, Yunehyeong;Byun, Yoseph
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.5
    • /
    • pp.13-21
    • /
    • 2014
  • This study analyzed the differences in the analysis techniques through a comparative analysis of the various segment's modeling techniques of Shield TBM method and proposed reasonable modeling techniques. Also, this study suggested reasonable estimating methods of load to be applicable in the field through the load analysis and three-dimensional finite element analysis by estimating model of rock mass relaxation load. Estimating method of relaxation area by rock mass rating makes no odds of output in subgrade with high rock mass rating, but so the difference of output is large, that is judged to set conservative design off. In estimating result of rock mass relaxation area by three-dimensional analysis relaxation area of subgrade with low-grade soil was predicted to be positioned at medium-range of many methods, in case of designing segment in subgrade with low-grade soil it needs to actively review estimation of relaxation area through three-dimensional analysis reflecting mechanical tunnel excavation.

Behavior of 2 Arch Tunnel in Sand (사질토지반에서 2 Arch 터널의 거동)

  • Lee, Sang-Duk;Cheon, Eun-Sook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.171-182
    • /
    • 2004
  • This study is focused on finding out the mechanical behavior of pillars and the ground adjacent to the tunnel depending on the central tunnel size and the invert during the construction of 2 arch tunnels in the sandy ground. Model tests were performed in the trap door system, which was composed of 3 separately movable plates. Central pillar was installed on the central movable plate to measure the pillar loads during the excavation of pilot tunnel and the main tunnel. The load-transfer and the loosening load were measured at the bottom plates adjacent to the 2 arch tunnels. The ground settlement and displacement of the tunnel lining were also measured. As results, not only pillar load but also the load transfer mechanism was influenced by the construction sequences, central tunnel size, and the invert.

  • PDF

Numerical Analysis of Tunnel Lining under Loosening Load (수치해석을 통한 이완하중에 따른 터널 라이닝의 거동 분석)

  • Park, Jung-Jin;Kim, Yong-Min;Hwang, Taik-Jean;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.7
    • /
    • pp.35-45
    • /
    • 2011
  • Cost effective design and construction are necessary to establish the design concept of tunnel lining. Loosening load acting on the concrete lining is compared with Terzaghi tunnel theory and numerical analysis. It is analyzed under the condition of weathered rock and soil with varying in-situ stress ratio ($K_0$). Based on the result, loosening load calculated by Tcrzaghi tunnel theory is much greater than numerical analysis results. And the load calculated in weathered soil is lager than weathered rock condition. As in-situ stress ratio increases, the stress acting on the tunnel lining decreases in Terzaghi theory rapidly, whereas there is little effect in numerical analysis.

Analytical study of circle tunnel Load considering Dilatancy Effect (Dilatancy 효과를 고려한 원형 터널 이완하중에 대한 해석적 연구)

  • Park, Shin-Young;Han, Heui-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.626-633
    • /
    • 2020
  • This study examined the behavior of the ground by comparing the methods using the results of the Terzaghi formula and the ground investigation data and method considering the dilatancy effect for a circular tunnel using the finite element method. In the case of the Terzaghi formula, the tunnel load can be overestimated and cause overdesign. The method using the results of the ground investigation data cannot be applied when a reasonable coefficient of earth pressure is not determined. This is because it behaves completely differently from the actual behavior, and unexpected problems can occur. In the case of the method considering the dilatancy effect, however, both the strength enhancement effect can be considered through the dilatancy angle and relative density. Therefore, the tunnel load was calculated most reasonably using the method considering dilatancy. Finite element analysis using the geotechnical survey results showed that the tensile stress acts at the top of the tunnel when the upper soil of the tunnel is shallow. On the other hand, additional verification is necessary, such as a comparison with the field measurement results. Through additional research, if normalized, the tunnel load can be calculated reasonably at the time of tunnel design, and safe and economical design is possible.

A Case Study on Excavation of Tunnel in a Shallow Layer & Uneven Slope (저토피.편경사 지형에서 터널굴착사례)

  • Lee, Chun-Suk;Yoo, Ki-Cheong;Jung, Chan-Gyu;Song, Pyung-Hyun;Choi, Choong-Lak;Kwon, Min-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.570-580
    • /
    • 2005
  • NATM 터널에 작용하는 토압(이완하중)의 크기는 지형조건, 지질조건등에 따라 다르므로 정량적으로 산정하기에는 다소 어려움이 있으며, 실무적으로 Terzaghi(1946)가 제안한 암반의 이완하중을 적용하고 있다. Terzaghi 암반이완하중은 지형상 저토피, 편경사등을 고려하기에는 다소 무리가 있고 특히, 설계시 시공중 공용후 터널에 편토압이 작용한다고 예측하는 것은 더욱 어렵다고 할 수 있다. 본 연구에서는 저토피 편경사지형에서 터널의 문제점 보강대책방안에 대하여 종합 검토하였으며, 실제 지형상 저토피, 편경사를 이루나 암질이 양호하다고 판단되어 아칭 효과를 기대할 수 있을 것으로 예상되는 터널이 굴착과정중 설계시 추정된 지반조건과 상이하여 터널지보재(숏크리트)의 균열 및 이상 변위가 발생된 터널에서 보강대책방안으로 인버트폐합을 실시하여 안정된 터널굴착을 할 수 있었던 사례를 소개하고 저토피 편경사 지형에서 NATM 터널의 설계 시공시 유의사항에 대하여 검토하였다.

  • PDF

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

A study on behavioral characteristics of concrete lining based on the equations of relaxed rock loads (이완하중 산정식에 따른 콘크리트라이닝 거동특성에 관한 연구)

  • Kim, Sang-Hwan;Park, Inn-Joon;Moon, Hoon-Ki;Shin, Yong-Suk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.443-450
    • /
    • 2010
  • A concrete lining of NATM tunnel had been considered as interior materials. But recently we consider it as structural materials. Therefore we must consider various loads. Relaxed rock load is a main load which decides thickness and reinforcement presence of concrete lining. In practice conservatively, Terzaghi's rock load theory has been accepted to estimate relaxed rock loads in urban subway tunnel design. This study investigates the equations of relaxed rock loads used in the design of NATM concrete lining. Structural analysis are executed based on various equations of relaxed rock loads, and concrete lining forces are compared.