• Title/Summary/Keyword: 중국 건설근로자

Search Result 3, Processing Time 0.019 seconds

Comparative Analysis on the Impact of Construction Site Working Conditions on Worker Satisfaction - Regarding the Korean and Korean-Chinese Workers - (건설현장 근로조건이 근로자의 직무만족에 미치는 영향에 관한 비교 분석 - 한국인과 조선족 근로자를 대상으로 -)

  • Lee, Hoon-Sook;Yun, Sue-Yeon;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.527-536
    • /
    • 2015
  • This research focuses on comparing the impact that working conditions have on the job satisfaction of Korean and Chinese-Korean construction workers. The data shows that factors such as the quality of wages, food catering, and leisure facilities showed a positive correlation on the workers' satisfaction. Further comparative analysis showed differences between the effect these factors have on the satisfaction of Korean workers and Chinese-Korean workers, who occupy the highest portion of the foreign workforce in Korea. The analysis concluded that to the Chinese-Korean workers, wage had the strongest impact on their satisfaction over other factors, whereas this difference was not present in the Korean workers. The results of this study highlighting these differences between the worker groups can contribute to developing the efficiency of the management of construction sites in Korea.

협회소식

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.5 s.190
    • /
    • pp.16-42
    • /
    • 2006
  • 중국섬서성 설비안장공정공사 대표단, 대한설비건설협회 항문/일용근로자 노무제도 관련 각시·도회 사무처장 간담회 개최/4개 단체 공조체제 구축을 위한 회 의 개최/산학협력 간단회 개최/산학협력 협약서 체결/전국 시·도회 정기총회 개최/2006년도 정기총회 개최/제17회 정기총회 개최/2006년 정기총회 개최/제 22 회 정기총회 개최/2006년 정기총회 개최/2006년 정기총회 개최/제17회 정기총회 개최/제17회 정기총회 개최/제18회 정기총회 개최/2006년 정기총회 개최/제18 차 정기총회 개최

  • PDF

A Study of Establishing the Plan of Lodging for the Workers of Gaesung Industrial Complex (개성공단 근로자 기숙사 건립 계획 연구)

  • Choi, Sang-Hee;Kim, Doo-Hwan;Kim, Sang-Yeon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.67-77
    • /
    • 2015
  • Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.