• Title/Summary/Keyword: 주행궤도

Search Result 218, Processing Time 0.026 seconds

A Behavior Analysis of HSR Concrete Slab Track under Variety of Rail Pad Static Stiffness on Fatigue Effect (피로효과를 고려한 레일패드의 정적스프링계수 변화에 따른 콘크리트 슬래브 제도의 거동분석)

  • Park, Yong-Gul;Kang, Kee-Dong;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.499-505
    • /
    • 2007
  • The major effective of this study is to investigate the fatigue effects of rail pad on High Speed Railway with concrete slab track system. It analyzed the mechanical behaviors of HSR concrete slab track with applying rail pad stiffness based on fatigue effect (hardening and increasing stiffness) on the 3-dimensional FE analysis and laboratory test for static & dynamic characteristics. As a result, the hardening of rail pad due to fatigue loading condition are negative effect for the static & dynamic response of concrete stab track which is before act on fatigue effect. The analytical and experimental study are carried out to investigate rail pad on fatigue effected increase vertical acceleration and stress and decrease suitable deflection on slab track. And rail pad based on fatigue effect induced dynamic maximum stresses, the increase of damage of slab track is predicted by adopting fatigue effected rail pad. after due consideration. The servicing HSR concrete slab track with resilient track system has need of the reasonable determination after due consideration fatigue effect of rail pad stiffness which could be reducing the effect of static and dynamic behavior that degradation phenomenon of structure by an unusual response characteristic and a drop durability.

Evaluation on Damage Weak Part of Rail Fastening System for Concrete Tracks (콘크리트 궤도용 탄성레일체결장치 손상취약부 분석)

  • Choi, Jung-Youl;Kim, Sang-Jin;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.265-270
    • /
    • 2022
  • The purpose of this study is to derive the damage weak part of the elastic rail fastening system for concrete tracks (System 300-1). In the concrete tracks, the elastic rail fastening system sticks the rail and the sleeper and reacts all the time when the train is running. Among the components of the rail fastening system, the resilience pad and tension clamp were fatigue members and were constantly deformed in response to compressive and uplift forces. In this study, the residual deformation characteristics of the tension clamp according to the period of use were analyzed using by specimens taken on site in the same section for 6, 11, and 16 years on the serviced urban transit. In addition, the damage mechanisms for each component were derived based on finite element analysis. As a result of the numerical analysis, the stress (strain) of each part of the tension clamp according to the external force from the applied clamping force was analyzed to derive the damaged weak part of the tension clamp.

Deformation Monitoring of Subway Track using by Automatic Measurement (자동화계측을 통한 지하철 궤도 변형 모니터링연구)

  • Jung-Youl Choi;Jae-Min Han
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.579-584
    • /
    • 2024
  • Currently, large-scale, deep construction is being carried out adjacent to subway tracks in korea. when excavating adjacent to each other, it is very important to ensure the safety of earth retaining structures and underground structures. therefore, we are managing the safety of the subway by introducing an automated measurement system. deformation of the subway track during adjacent excavation may affect train running stability. this is a factor that can be linked to train derailments. however, current subway track safety evaluation using automated measurement systems relies only on the maximum value of measured data. therefore, a method to improve the usability of automated measurement system results is needed. in this study, we utilized a technique that can quantitatively evaluate the measurement results of a large amount of subway track deformation. a safety evaluation was conducted on subway track deformation due to adjacent excavation using a vast amount of data using probabilistic statistical analysis techniques.

Analysis of the acceleration measured on Korea and France high speed railways using UIC518 code (UIC518 방법에 의한 국내 및 프랑스 고속철도 차량 진동가속도 분석)

  • Choi, Il-Yoon;Kim, Nam Po;Lee, Jun S;Lim, Jihoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8516-8524
    • /
    • 2015
  • Track irregularities can be evaluated not only directly by track inspection but also indirectly by measurement of carbody accelerations and many researches are being conducted. Carbody accelerations were measured on the Kyeongbu high speed railway and France high speed line to investigate the situation of the track maintenance at Korea high speed line by using indirect method. Digital signal processing for the measured acceleration data were conducted according to UIC518 code. Since the vehicle speed affects the car body acceleration, the lateral and vertical acceleration of the car body were classified according to the vehicle speed and the distribution characteristics of these acceleration were investigated and evaluated by UIC518 criteria. Finally, the running behavior of KTX on Korea high speed railway were compared with that on France. Distribution characteristics of these acceleration were evaluated and discussed in terms of the track maintenance in Korea high speed line.

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

Characteristics of Track Irregularities on Kyoungbu High-speed Line (경부고속선 궤도틀림 분포특성)

  • Choi, Il-Yoon;Lee, Jun S.;Um, Ju-Hwan;Kang, Tae-Ku;Choi, Min-Ji
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.63-70
    • /
    • 2015
  • Track irregularities have a strong influence on the safety and the ride comfort of trains as well as track maintenance work. A statistical analysis was conducted for track irregularities data measured in Kyoungbu high speed line using a track recording car(EM120). First, the characteristics of EM120, which adopted versine measurement system, were investigated and the transfer function of EM120 was examined. The distributions of the surface and the alignment which have short wavelength were considerably high and the distribution decreased as wavelength increases. A distribution analysis of the wavelength was carried out according to EN standards and most of the track irregularities were in a D1 wavelength range. The distributions of the amplitude of track irregularities were also investigated and the results show that the distributions of track irregularities decrease rapidly as amplitude increases. These results may be helpful in making track maintenance plans and revising track irregularities criteria.

Optimization of Characteristics of Longitudinal Creepage for Running Stability on Sharp Curved Track (급곡선 주행 안정화를 위한 주행방향 크리피지 특성 최적화 연구)

  • Sim, Kyung-Seok;Park, Tae-Won;Lee, Jin-Hee;Kim, Nam-Po
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.1
    • /
    • pp.19-27
    • /
    • 2014
  • Urban railway vehicles operate in downtown areas. Due to increases in the number of passengers and changes in the service plans, railway vehicles are expected to operate on sharp curved tracks. However, on these tracks, the running stability of the railway vehicles is significantly decreased and the creepage is increased. Creepage causes the wheel/rail to wear and vibration. Therefore, reducing the creepage helps ensure the running stability and can be beneficial for the environment and cost. In this paper, the longitudinal creepage is analyzed using a railway vehicle model on a sharp curved track. Furthermore, in order to minimize the problems when a railway vehicle runs on a sharp curved track, the characteristics of a bogie are optimized using response optimization.

Simulation and Experimental Study on the Impact of Light Railway Train Bridge Due to Concrete Rail Prominence (주행면 단차에 의한 경량전철 교량의 충격 시뮬레이션 및 실험)

  • Jeon, Jun-Tai;Song, Jae-Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1A
    • /
    • pp.45-52
    • /
    • 2010
  • This study pointed on the dynamic impact of AGT (Automated Guide-way Transit) bridge, due to concrete rail prominence. An experiment was done with 30 m P.S.C. bridge in AGT test line in Kyungsan. An artificial prominence with 10 mm hight, was installed at the mid span of concrete rail. And computer simulation was executed for the artificial prominence. As an experiment result, in the case of with prominence, bridge acceleration responses are increased 50% at the speed range of 20 km/h-60 km/h, and bridge displacement responses increased slightly. With these results, the prominence of concrete rail can be induce excess impact and vibration. And the computer program simulated much the same as experiments. So this program can be used for AGT bridge design and formulate the standard of concrete rail management.

A Dynamic Behavior Evaluation of the Curved Rail according to Lateral Spring Stiffness of Track System (궤도시스템의 횡탄성에 따른 곡선부 레일의 동적거동평가)

  • Kim, Bag-Jin;Choi, Jung-Youl;Chun, Dae-Sung;Eom, Mac;Kang, Yun-Suk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.517-528
    • /
    • 2007
  • Domestic or international existing researches regarding rail damage factors are focused on laying, vehicle conditions, driving speed and driving habits and overlook characteristics of track structure (elasticity, maintenance etc). Also in ballast track, as there is no special lateral spring stiffness of track also called as ballast lateral resistance in concrete track, generally, existing study shows concrete track has 2 time shorter life cycle for rail replacement than ballast track due to abrasion. As a result of domestic concrete track design and operation performance review, concrete track elasticity is lower than track elasticity of ballast track resulting higher damage on rail and tracks. Generally, concrete track has advantage in track elasticity adjustment than ballast track and in case of Europe, in concrete track design, it is recommended to have same or higher performance range of vertical elastic stiffness of ballast track but domestically or internationally review on lateral spring stiffness of track is very minimal. Therefore, through analysis of service line track on site measurement and analysis on performance of maintenance, in this research, dynamic characteristic behaviors of commonly used ballast and concrete track are studied to infer elasticity of service line track and experimentally prove effects of track lateral spring stiffness that influence curved rail damage as well as correlation between track elasticity by track system and rail damage to propose importance of appropriate elastic stiffness level for concrete and ballast track.

  • PDF

Evaluation of Deformation Characteristics for Bridge/Earthwork Transition Reinforcement Methods Considering Moving Load (이동하중을 고려한 교량/토공 접속부 보강방안별 변형특성 평가)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Kang, Tae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.298-303
    • /
    • 2010
  • The transition zone of the railway is the section which roadbed stiffness is suddenly varied like as tunnel-earthwork, bridge-earthwork and concrete track-ballasted track. There are about 450 tunnel-bridge transition sections on Kyungbu high-speed railway line. It is very important to pay careful attention to construction of these transition zones, in order to secure the train running safety. So, we developed a finite element model of the moving wheel loading to simulate the behavior of bridge-earthwork transitions in this paper. The most distinctive characteristics of the model proposed is to simulate the real wheel behavior on rail. And the main analysis object is to evaluate and compare the deformation characteristics of the transition zone according to the reinforcement methods and length of transition zone which is adopted to high-speed railway. Based on the analysis results, we assessed the effect of the reinforcements on the transition zone of high-speed railway.