Evaluation of Deformation Characteristics for Bridge/Earthwork Transition Reinforcement Methods Considering Moving Load |
Lee, Il-Wha
(한국철도기술연구원 철도구조연구실)
Lee, Sung-Jin (한국철도기술연구원 철도구조연구실) Lee, Su-Hyung (한국철도기술연구원 철도구조연구실) Kang, Tae-Ho (다산컨설턴트 지반부) |
1 | I.-W. Lee, S.-J. Lee, M.-H. Shin, S.-K. Hwang, C.-J. Lee (2009) Determination on the reinforced roadbed thickness of concrete track at embankment section, Journal of the Korean Society for Railway, 12(6), pp. 835-843. 과학기술학회마을 |
2 | Korea Rail Network Authorit y(2008) Design Guideline for Honam High-speed Line. |
3 | Alexander Smekal (1997) Transition Structure of Railway Bridges, WCRR. |
4 | M. Banimahd and P.K. Woodward (2009) 3-Dimensional finite element modelling of railway transitions, Proceedings 9th International Conference on Railway Engineering, London. |
5 | Korea Railway Research Institute (2008) Study of increasing Natural Ground Stabilization on Railway Earthwork Section, Research Report. |
6 | I.-W. Lee (2006) Earthwork-bridge approach design and maintenance considering the interface, Geotechnical Engineering, 22(11), pp. 46-55. |
7 | B. Dupont, D.L. Allen (2002) Movements and settlements of highway bridge approaches, Kentucky Transportation Center, Research report, KTC-02-18/SPR-220-00-1F. |
8 | N. Hani, N. Vittilo, T.A. Amra (2003) Analysis and design of bridge approach and transition slabs in new jersey, Transportation Research Board, National Research Council, Washington, D.C. |
9 | H.-J., Kim, S.-J. Lee, J.-H. Kim, D.-K. Park (2006) Evaluation of the Track/Roadbed Interface to apply the Concrete Track, Korea Society for Railway Spring Conference, pp. 423-431. |
10 | Korea Rail Network Authority (2003) Special Specifications for High-speed Line. |