• Title/Summary/Keyword: 주입 시공

Search Result 167, Processing Time 0.023 seconds

Development of Design Technology of Korean Style Air-Inflated Double-Layer Plastic Greenhouse (한국형 공기주입 이중피복 플라스틱온실의 설계기술 개발)

  • Lee, Hyun-Woo;Sim, Sang-Youn;Nam, Hyo-Seok;Nam, Sang-Woon;Kim, Young-Shik
    • Journal of Bio-Environment Control
    • /
    • v.18 no.3
    • /
    • pp.185-191
    • /
    • 2009
  • The construction of experimental greenhouses, operating test, and analysis on variation of different environment factors were conducted to provide fundamental data for design of Korean style air-inflated double-layer plastic greenhouse. The development of technology of attaching plastic to the structure and fasteners to be able to keep airtight was required in order to maintain proper static pressure in air space of double layer coverings. The insulation effect of air inflated greenhouse was better than conventional type. The temperature of arch type roof was greater about $2^{\circ}C$ than peach type roof in air inflated greenhouse. It was recommended that the plastic should be attached at the edges without clearance length in order to ease installation and raise airtightness of double layer coverings. The transmittance of arch type roof was greater than peach type in air inflated one span greenhouse. The transmittance of air inflated greenhouse was greater than conventional type due to frame ratio and distance between double layers in three span greenhouse. The condensation occurred on conventional type greenhouse was more than air inflated type. It was required to examine for a long time in order to analyze it quantitatively.

A Study on the Reinforcement of Bridge Foundation in the Limestone Cavity (석회암 공동지역의 교량기초 보강에 관한 연구)

  • Lee, Sang-Chul;Ryu, Chang-Yeol;Cho, Kook-Hwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.1
    • /
    • pp.51-57
    • /
    • 2011
  • Irregular distributions of limestone cavity in Gang-Won province area may cause unexpected accidents from reduced serviceability or failure of structure. It is requested that an appropriate ground reinforcement method should be used to improve bearing capacity of structure, and the method should also be satisfied with environmental requirements. Among several methods used for foundation constructions in cavity area, Rod Jet Pile(RJP) method has been widely used. While the RJP method was used to improve bearing capacity for the railway bridge foundations, water pollutions of drinking water as well as fishery located adjacent to this project area were occurred. The main reason of the water pollution was cement runoff used in cement mortar during injecting material in RJP method. Laboratory tests were performed to prevent water pollution. The compaction mortar method using low movable material was selected for this project. The quality of water at a fishery adjacent to the site and the compressive strength of cores taken from the construction site were measured. Test results show that the water pollutions was minimized, and the average compressive strength of foundation material was over 5 MPa. As a result of this study, compaction mortar method can be used to ensure the bearing capacity of foundation and to prevent environment pollutions.

Optimal Method for Injection of Neutralizer into Embankment Structure Composed of Pyrite Rocks (황철석으로 조성된 성토구조체의 중화제 주입을 위한 최적 방안 제안)

  • Young-Suk Song;Jung-Mann Yun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.4
    • /
    • pp.73-82
    • /
    • 2023
  • In this study, the optimal method for injection of neutralizer to restraint the leakage of acid drainage in embankment structure composed of pyrite rocks is proposed. Finite Element Analysis was performed to examine the seepage effect caused by injection of neutralizer into the embankment structure. The diameter of the neutralizer injection hole was selected as 50cm, the interval space of injection ranged from 1m to 4m and the injecting pressure ranged from 100kPa to 220 kPa were applied for the numerical analysis. According to the analysis results, the saturation time of the whole embankment structure was shown to be fast at a relatively low injecting pressure in the case of injecting interval space of 1.0m and injecting pressure of 130kPa and in the case of injecting interval space of 2.0m and injecting pressure of 160kPa. When the interval space of injection for saturation of whole embankment structure is selected as 3m, various injection pressures can be applied from 130kPa to 190kPa, and the saturation time of whole embankment is similar regardless of the injection pressure. Therefore, the optimal method for injection of neutralizer considering economic efficiency was selected as injecting interval space of 3.0m and injection pressure of 130kPa.

A Study on the Grouting Characteristics of Top-down Multi-step Pressure Grouting Method (하향식 다단 압력 그라우팅 방법의 주입특성에 대한 연구)

  • Lee, Hongsung;Lee, Seungho
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.201-209
    • /
    • 2019
  • Bottom-up multi-stage pressure grouting is widely applied to domestic slopes and tunnels. It involves injecting earth from the ground to the surface after drilling. Various reports of construction performance have demonstrated its wide applicability. However, little research has studied top-down multi-step pressure grouting in Korea, which involves injection from the surface. This paper compares the grouting effect of both the established bottom-up method and the top-down method in soil box and field tests. The soil box test showed that the bulb volume of the top-down method is ~24% less than that of the bottom-up method. The field test confirmed that the top-down method has a wider grouting range and a higher injection density per area than the bottom-up method.

A Fundamental Study on The Expression of Initial Strength of Injection Materials for Steel Pipe Multi-Stage Method using Circulating Resources (순환자원을 활용한 강관다단공법용 주입재의 초기강도 발현에 대한 기초연구)

  • Sang-Huwon Song
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.5
    • /
    • pp.557-562
    • /
    • 2023
  • This study reviewed the use of soil injection materials using circulating resources as injection materials for the steel pipe multi-stage construction method. The tests performed were homogel time and homogel compressive strength. The steel pipe multi-stage construction method is an auxiliary construction method for tunnels, and the expression of initial strength after construction is an important factor. The better the strength development in the initial stage, the more it can be used as an injection material suitable for the multi-stage steel pipe construction method. As a result of laboratory test, it was found that the homogel time of the injection material using circulating resources required more time than the mixing ratio using cement as the injection material. In addition, it was found that the initial strength curing time satisfying 2MPa was required for more than 24 hours. Therefore, it was confirmed that the injection material using recycled resources required a longer initial curing time than cement of the same mixing ratio.

A Study on Characteristics of Urethane Polymer as Injection Material for Ground Improvement

  • Chun, Byung-Sik;Park, Heung-Kyu;Ryu, Dong-Sung
    • Geotechnical Engineering
    • /
    • v.12 no.3
    • /
    • pp.99-108
    • /
    • 1996
  • The physical and chemical properties of polyurethane-yieding twofomponent liquid injection mixture and those of the resulting polyurethane solid foam for chemical grouting are investigated. The chemical experiments on the factors influencing the properties of polyurethane show that the behaviors of polyurethane-yielding liquid material and those of the produced polyurethane solid foam are greatly affected by the ground conditions such as temperature, water content and density of soil. The ground reinforcing and water -blocking effects of polyurethane grouting are examined through field case history of tunnel ericavati on of the subway under construction.

  • PDF

Thermal Interference Modeling in the Aquifer Thermal Energy Storage Systems (대수층 축열 시스템의 열 간섭 모델링)

  • Kim, Jong-chan;Lee, Young-min;Yoon, Woon-Sang;Koo, Min-Ho;Keehm, Young-seuk
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.596-599
    • /
    • 2009
  • 대수층 축열 시스템(ATES)의 효율은 지중에 저장된 열 사이의 간섭에 의해 결정이 되며, 열 간섭에 영향을 미치는 요인들은 시추공 간 이격거리, 대수층의 수리 전도도, 주입/양수량 등이 있다. 따라서 이 연구에서는 지하수-지열 거동 모델링을 통하여 열 간섭이 일어나는 현상과 열 간섭이 시스템 효율에 미치는 영향을 분석하였다. 모델링 결과로부터 이격거리는 작을수록 그리고 대수층의 수리전도도와 주입/양수량은 클수록 열 간섭이 잘 일어나는 것을 확인하였고, 열 간섭 계수가 1일 때는 시스템 효율이 상대적으로 크게 낮아지고, 열 간섭 계수가 1 미만일 때는 변화가 미미한 것을 확인하였다. ATES 를 이용한 냉난방 시스템을 시공 하고 있는 안성 연구지역에 대한 장기 예측 모델링을 수행 하였다. 모델링 결과 이격거리가 80 m 이고, 주입/양수량이 100 $m^3/day$ 일 때, 시스템 가동 7년경과 뒤 여름철과 겨울철에 계산된 시스템 효율은 각각 36 RT 와 31 RT 로 나타났다. 따라서 주입/양수량을 100 $m^3/day$로 했을 때, 냉난방 대상건물의 필요 부하인 20 RT 를 충분히 충족할 수 있을 것으로 판단된다.

  • PDF

Analysis of the Physical Properties of Ground before and after Low Flowing Grouting (저유동성 그라우팅 시공전후 지반의 물성변화 분석)

  • Seo, Seok-Hyun;Lee, Jung-Sang;Kang, Won-Dong;Jung, Euiyoup
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.115-127
    • /
    • 2019
  • The low-flow grouting injection technique, the target construction method for this study, is a method of pouring mortar into the ground by non-emission replacement principle, which can be expected to increase the density of the ground, and, in some cases, be used as a base file using the strength of the high injection solids, along with low noise, low pollution, and high durability. To verify that the dynamic characteristics of the ground are improved by the low-flow injection technique, the test work was conducted on the site and physical tests were performed, and the quality of the improvement formed in the ground was verified through the indoor test on the core and core recovery rate was analyzed. The density logs test layer calculated the volume density of the ground layer by using the Compton scattering of gamma-rays, and the sonic logs was tested on the ground around the drill hole using a detector consisting of sonar and receiver devices inside the drill hole. As a result of the measurement of the change in physical properties (density and sonic logs) before and after grouting, both properties were basically increased after infusion of grout agent. However, the variation in density increase was greater than the increase in speed after grouting, and the ground density measurement method was thought to be effective in measuring the fill effect of the filler. Strength and core recovery rates were measured from specimens taken after the age of 28 days, and the results of the test results of the diffusion and strength test of the improved products were verified to satisfy the design criteria, thereby satisfying the seismic performance reinforcement.

A Study on the Increase of Bearing Capacity of Soft Ground in Shallow Foundation Using High Density Rapid Expansion Material (고밀도 급속 팽창재를 이용한 얕은기초 연약지반의 지내력 증대에 관한 연구)

  • Ro, Euichul;Kim, Daehyeon
    • The Journal of Engineering Geology
    • /
    • v.30 no.2
    • /
    • pp.185-198
    • /
    • 2020
  • High-density rapid expansion material is a method that increases the solid volume of injection materials due to hydration and foam reactions at the same time as spraying. It is an effective method for securing ground stability, restoring subsidence, and loading during construction of structures. In this regard, through the mechanical experiments of injection materials, the stability of the foundation ground of the structure and the effect of increasing the endurance using site construction were analyzed. The results of the experiment showed that the unit weight of soil decreased by 10.5% after injection of the filling material, and the allowable support for the structure was deemed safe, and the subsidence by each section after ground improvement was determined to be safe at 2.28, 1.55 and 0.46 cm, respectively, with an acceptable subsidence of less than 5 cm. After the field test, five inclinometers were installed on the top floor of the target building to measure the displacement of the X and Y axes. As a result of the measurement, no displacement related to the phenomenon of inequality or subsidence cracks of the structure was measured for about 16 months (509 days) after construction. This can be judged to be a sufficient increase in the stability of the ground after the injection of rapid expansion.

A Study on the Field Application of Epoxy Impregnation Method Using Elastic Storage Tube (탄성저장관을 활용한 에폭시 주입공법의 현장 적용성에 관한 연구)

  • Kim, Chun-Ho;Lee, Ho-Jin;Kim, Kyoung-Min
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.6
    • /
    • pp.72-80
    • /
    • 2018
  • In this research, we tried to investigate the influence of concrete on cracks after applying to the actual construction site using the TPS construction method which can be easily charged by the mechanical injection method. To summarize the results, the following It is as follows. First, in the case of ultrasonic velocity, it can be seen that the ultrasonic wave passes rapidly at an average of about 36 mm / sec as compared with the syringe method when using the TPS method, and in the case of the injection depth, the syringe method In the case of TPS construction method, it showed an excellent tendency that 100% of the water retentive material was charged with all the formulations under a strong injection pressure. In the case of compressive strength, it was shown that the average was increased by 16.8% at the time of using the TPS construction method, and it was found to be structurally superior. Taken together, it is possible to confirm the behavior of the crack repairing agent by improving the quality by improving the strength and confirming the window installation by filling the injection material into the closed space at the crack site when using the TPS method compared with the syringe method. In addition, it is expected that construction time will be improved by shortening the construction period of about 5 days for the TPS construction method construction section 532 m, and usability will be expanded by the crack repair method of concrete structure.