Scheduling problems can be classified into offline and online ones. This paper considers an online scheduling problem to minimize makespan on the identical parallel machines. For dynamically arrived jobs with their ready times, we show that the sequencing order according to the ERD (Earliest Ready Date) rule is optimal to minimize makespan. This paper suggests an algorithm by using the MIP(Mixed Integer Programming) formulation periodically to find a good periodic schedule and evaluates the required computational time and resulted makespan of the algorithm. The comparition with an offline scheduling shows our algorithm makes the schedule very fast and the makespan can be reduced as the period time reduction, so we can conclude that our algorithm is useful for scheduling the jobs under online environment even though the number of jobs and machines is large. We expect that the algorithm is invaluable one to find good schedules for the smart factory and online scheduler using the blockchain mechanism.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.418-421
/
2006
오늘날의 건설사업 환경은 차별화 ${\cdot}$ 정보화 ${\cdot}$ 특성화 ${\cdot}$ R&D등 지식과 기술 및 창의성을 바탕으로 한 창조적 결과물 생산으로의 요구를 확대하고 있다. 이러한 환경은 건설 사업을 수행하는 기술자 집단에게 사업수행의 미래 가치적 최적화를 위해 기획과 계획에서부터 시공과 유지관리 및 장기 지속가능성까지 보장하는 생애주기차원의 사업수행을 요구하는 것이기 때문에 사업의 타당성 분석에서부터 실시간 정보처리와 가치창조를 위한 사업수행 계획이 절대적이라 할 수 있다. 본 연구에서는 그동안 국내 사업일정계획에서 적용하고 있거나 적용할 필요성이 있는 사업단계와 단계별 업무영역을 구분하고, 정보화 운영관리 방안을 분석함으로서 국내 건설 환경에 적합하고 신뢰성을 보장 할 수 있는 일정계획을 수립할 수 있는 방향을 제시하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.4
no.1
s.13
/
pp.106-113
/
2003
In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.498-503
/
2002
Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.
Proceedings of the Korea Society for Simulation Conference
/
1994.10a
/
pp.9-9
/
1994
FMS를 비롯한 대부분의 제조시스템의 운용을 위해서는 크게 전략적 의사결저오가 전술적 읫사결저이 필요하며, 이 중 전술적 의사결증은 부품 선택, 생산율 결정, 부하할당, 부품 투입, 일정계획 문제등과 관련되어 있다. 본 연구에서는 부품투입시점과 부품투입순서에 의해 결정된 부품투입 정책이 시스템 성능에 미치는 영향을 알아보기 위해서, 서울대학교부설 자동화시스템공동연구소(ASRI)내의 FMS/CIM Center를 대상으로 시뮬레이션을 수행하였다. ASRI-FMS /CIM Center 는 기계가공과 조립이 동시에 이루어지는 FMAS(Flexible Mauufacturing & Assembly System) 형태의 모형공장이며, 현재 세 종류의 모터 등을 생산할 수 있다. 본 연구에서는 고려한 부품투입시점 전략으로는 고정 WIP(Work-in-process)유지전략 , 병목기계 전략, 일정비율 투입전략 등이며, 부품 투입순서 전략으로는 크게 주기적 투입전략과 비주기적 투입전략을 고려하였다. 또한 이러한 부품 투입정책들이 시스템 내에서 적용할 수 있는 여러 가지 우선순위규칙 등과 함께 사용될 때, 나타나는 상호관계를 파악하기 위한 연구가 수행되었다. 아울러 병목기계 추가도입, 물류운반시간의 감소 등과 같이 가능한 범위에서 현재의 시스템 조건이 바뀐 상황에 대해서도 시뮬레이션을 수행함으로써, 추후 변경된 시스템에서도 본 연구의 결과가 적응될 수 있도록 하였다.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2001.11a
/
pp.381-386
/
2001
RBI(Risk-Based Inspection)는 각각의 설비별로 위험등급 또는 위험도를 산정하고 이에 따라 검사의 우선 순위, 방법, 주기 및 일정계획 등을 수립하여 기술적인 근거에 의해 종합적이고 체계적인 검사를 수행하는 것이다. 이와 같이 RBI는 위험도를 정성적/정량적으로 평가하여 위험의 대부분을 내포하고 있는 30% 내외의 소수의 설비를 찾아내어 이에 대해 최적의 방법으로 인적, 물적 자원을 집중적으로 투입함으로써 안전성 확보와 함께 경제성을 추구하는 효율적인 기법이라 할 수 있다.(중략)
Journal of the Korea Institute of Information and Communication Engineering
/
v.4
no.5
/
pp.919-930
/
2000
This paper treats a development of visual interactive modeling(VIM) system for ship scheduling problem in integer formulation. The ship scheduling problem can be described as "A problem which assigns ships and cargos to achieve maximum revenue from transportation" in brief. Since late 1970s there has been rapid growth in development and use of VIM as MS10R technology due to the development of computer technology and now VIM has become a important discipline in MS/OR and MIS society. Visual Interactive Modeling is a process that decision maker takes part in modeling life cycle -data collection, formulation, derivation of optimal solution and representation of solution - and interacts with a modeling system to achieve a user-solution appropriate for his/her ultimate goal. This paper suggests the methodology how to collect data, build and modify model, and represent solution using computer graphics as a major driving tool and demonstrates effective performance of a prototype system.pe system.
Proceedings of the Korea Information Processing Society Conference
/
2015.04a
/
pp.603-606
/
2015
소프트웨어 개발 프로젝트에서 최종적인 개발일정과 비용이 당초 계획과 많은 차이가 생기는 경우가 많다. 그러므로 프로젝트가 계획대로 잘 수행되고 있는가를 주기적으로 검토하고 프로젝트 목표를 달성하는데 필요하면 시정조치를 취하는 등의 프로젝트 통제를 위한 관리방법이 중요하다. 본 연구에서는 소프트웨어 개발 프로젝트에서 획득가치관리(EVM : Earned Value Management)를 활용하여 프로젝트 이해 관계자들간의 원활한 의사소통 및 보고체계를 통해 보다 효율적인 프로젝트 성과 관리를 가능하도록 하는 현실적인 방안을 제시하고자 한다. 또한 프로젝트 관리에 EVM 기법을 적용할 경우의 문제점과 그에 대한 보완책을 제안한다.
La Hyo-Shin;Kim Tae-Hee;Han Choong-Hee;Kim Sun-kuk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.495-500
/
2001
After the completion of an apartment housing project, deterioration of building materials will commence over time. Building maintenance consists of short-time and long-term repair projects. A long-term repair plan for organized maintenance management should be developed and implemented to maintain the longevity of the building. When forming such a plan, one should carefully predict when each part of the building will need repairs and how often subsequent repairs of each part will occur. The plan should be based on these predictions. Many apartment buildings in Korea have poor long-term maintenance management plans. This is because many of these plans are developed as mere legal formalities rather than as serious attempts to maintain the longevity of buildings. In this study, the materials used in the construction of each part of an apartment building we selected are taken into account to predict when the repairs will be required and how frequently subsequent repairs will be required. Furthermore, We suggest a long-term maintenance management plan for elongation so that apartment house managers can use to periodically check, diagnose, and replace old or malfunctioning parts using a web-based maintenance calender.
Journal of the Korean Society for Precision Engineering
/
v.11
no.2
/
pp.17-22
/
1994
짧아진 제품의 주기, 고객의 다양한 제품선호 경향등에 대응하기 위해서, 제조업체들은 다품종 소량체제에 맞게 유연한 생산시스템을 갖추어야한다. 생산성과 유연성을 동시에 추구하고자하는 유연생산 시스템(Foexible Manufacturing System: FMA)의 도입에는 막대한 투자가 따르기 때문에 시스템의 가동률을 극대화하고 유휴시간( Nonproductive Time)을 최소화해야 단 기간내에 투자비를 상환할 수 있으므로, 생산시스템을 경제적 및 효율적으로 운용하는 것이 매우 중요하다. 한편 이산계 시뮬레이션(Discrete Event Simulation)기법은 시스템의 정적 및 동적인 거동 특성을 모델링하여 모의적 실험을 통해 시스템의 성능이나 특성을 예측할 수 있도록 개발된 유용한 해석 도구로서, 생산 시스템 설계 및 평가등의 분야에 이 기법을 적용한 연구가 매우 활발하게 이루어져 왔으며, 최근 FMS운용을 위한 생산계획, 일정계획등의 문제 해결에도 매우 중요한 해석도구로 인식되고 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.