• Title/Summary/Keyword: 종방향 이격거리

Search Result 6, Processing Time 0.022 seconds

A study on the longitudinal optimum separated distance of tunnel face in 2-arch tunnel (2-Arch 터널의 막장면 종방향 적정 이격거리에 관한 연구)

  • Lee, Min-Kyu;Jeong, Ji-Su;Lee, Sung-Ki;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.323-330
    • /
    • 2007
  • Recently, due to the effective land utilization and environmental protection, the construction of 2-arch tunnel has been gradually increased. In spite of this tendency, the mechanical information for the 2-arch tunnel, especially such as its behavior characteristics and mechanism are not enough. Therefore in this study, the theoretical and numerical studies on the behavior characteristics of 2-arch tunnel are carried out and longitudinal optimum separated distance of tunnel face is proposed by considering the analysis results from the behavior of advanced excavation of tunnel and stress of central pillar. As a result, longitudinal optimum separated distance of tunnel face is in 0.5D for the better safety of 2-arch tunnel by rapidly decreasing the stress concentration of central pillar.

  • PDF

3-D Numerical Experiment for Estimation of Equivalent Resistance Coefficient due to Multi-piers : Effect of Transverse Intervals (상당저항계수식 산정을 위한 3차원 수치실험 : 횡방향 이격거리의 영향)

  • Kim, Hyeong-Seok;Choi, Jun-Woo;Ko, Kwang-Oh;Yoon, Sung-Bum
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.3
    • /
    • pp.216-223
    • /
    • 2009
  • A transverse drag interaction coefficient of the equivalent resistance coefficient formula for square multi-piers higher than water depth and arranged with equal intervals was studied. From the assumption that the energy loss due to drag interaction according to transverse intervals of resistance bodies is essentially identical to the energy loss due to thick orifice according to porosities, the transverse drag interaction coefficient was derived by employing the orifice's energy loss coefficient. The equivalent resistance coefficient formula including the drag interaction coefficient was compared with the numerical experiments using FLOW-3D, the performance of which was verified by Kim et al.(2008) in the experimental condition with the multi-piers. The comparisons showed good agreement and thus, the equivalent resistance coefficient formula, which does not only consider frictional resistance but also consider the multi-piers' drag resistance varied according to the intervals in longitudinal or transverse direction, was verified.

Experimental study on the relaxation zone depending on the width and distance of the weak zone existing ahead of tunnel face (터널 굴진면 전방에 위치한 연약대 폭과 이격거리에 따른 이완영역에 대한 실험적 연구)

  • Ham, Hyeon Su;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.855-867
    • /
    • 2018
  • When a weak zone exists ahead of tunnel face, the stress in the adjacent area would increase due to the longitudinal arching effect and the stability of the tunnel is affected. Therefore, it is critical to prepare a countermeasure through the investigation of the frontal weakness zone of the excavated face. Although there are several researches to predict the existence of weak zone ahead of tunnel face, such as geophysical exploration, numerical analysis and tunnel support, lack of studies on the relaxation zone depending on the width or distance from the vulnerable area. In this study, the impact of the weak zone on the formation of the relaxation zone was investigated. For this purpose, a series of laboratory test were carried out varying the width of the weak zone and the separation distance between tunnel face and weak zone. In the model test, sand with a water content of 3.8% was used to form a model ground. The model weak zone was constructed with dry sand curtains. The tunnel face was adjusted to allow a sequential excavation of upper and lower half part. load cells were installed on the bottom of the foundation and the tunnel face and measuring instruments for displacement were installed on the surface of the model ground to measure the vertical stress and surface displacements due to tunnel excavation respectively. The test results show that the width of weak zone did not affect the ground settlement while the ground subsidence drastically increased within 0.25D. The vertical stress and horizontal stress increased from 0.5D or less. In addition, the longitudinal arching effect is likely within the 1.0D zone ahead of the tunnel face, which may reduce the vertical stress in the ground following tunneling direction.

An Experimental Study on the Two Dimensional Behaviors due to Excavation of Crossed Tunnel below existing tunnel (기존터널 하부에 교차하여 굴착되는 터널의 2차원 거동 특성에 대한 실험적 연구)

  • Hong, Suk-Bong;Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.119-131
    • /
    • 2005
  • The two dimensional behaviors of the existing upper tunnel and the ground at crossed area due to the excavation of a lower tunnel were studied experimentally, The model tests were conducted by changing the relative location of the existing upper tunnel and the lower tunnel. The results of the study show that a vertical earth pressure outside the loosened area was increased due to longitudinal arching effect same as a single tunnel. In case vertical distance between the upper and lower tunnel is 0.7 H and 1.0 H respectively (H is a height of the lower tunnel), vertical earth pressure increased in the loosened area behind the tunnel face. But when a vertical distance is 1, 3 H, ground behaviors appeared similarly to a single tunnel.

  • PDF

The Fast Correlative Vector Direction Finder Conversion (직접 변환을 이용한 고속 상관형 벡터 방향탐지기)

  • Park, Cheol-Sun;Kim, Dae-Young
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.43 no.12 s.354
    • /
    • pp.16-23
    • /
    • 2006
  • This paper presents the development of the fast Direction Finder using direct conversion method, which can intercept for short pulse signal of less' than 1 msec. in RF Down Converter, and CVDF(Correlative Vector Direction Finding) algorithm, which estimates DoA (Direction of Arrival). The configuration and characteristics of direction finder using 5-channel equi-spaced circular array antenna are presented and the direct conversion techniques for removing tuning time using I/Q demodulator are described. The CRLB of our model is derived, the principles of 2 kind of CVDF algorithm are explained and their characteristics are compared with CRLB w.r.t the number of samples and spacing ratio. The RF Down Converter prototype using direct conversion method is manufactured, the 2 kind of CVDF algorithm are applied and their performance are analyzed. Finally it is confirmed the LSE based CVDF algorithm is better than correlation-coefficient based except for ambiguity protection capabilities.

A Study on the Area of Reinforcement in the Cross Tunnel by Laboratory Model Test (실내모형실험을 통한 교차터널의 보강영역에 관한 연구)

  • Jung, Hyuk Sang;Hong, Jong Ouk;Baeg, Seung In;Chun, Byung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4C
    • /
    • pp.129-137
    • /
    • 2012
  • With the increase in infrastructure needs and tunnel construction, more complicated geometries have come to light, especially in cross tunnel design and construction. The major factors to influence existing tunnels are spacing between tunnels, relative position, size of the new tunnel, construction techniques, topographic and geologic conditions, structure, and alternative construction. In this study, settlement from an excavation for a new tunnel near an existing tunnel, settlement from a change in position of the new tunnel relative to an existing tunnel, and the distribution of deformations of the existing tunnel as a result of excavating the cross-location are analyzed through laboratory model tests. As the results, in condition of the new tunnels go through below the existing tunnel, not only analysed through the standard of the diameter of the tunnel, so it would need to set up to strengthen the field within each side of the 1D, but also determined the part of the cross in the existing and the new tunnel, should implement the reinforcement from the part of new tunnel to the existing tunneling influence of excavation.