• Title/Summary/Keyword: 정비 소요시간

Search Result 35, Processing Time 0.032 seconds

A Study on an Operational Availability Computation Model for Weapon Systems (무기체계 운용가용도 산정 모델에 관한 연구)

  • Kim, Hye-Lyeong;Baek, Soon-Heum;Choi, Sang-Yeong
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.3
    • /
    • pp.17-30
    • /
    • 2009
  • In this study, we propose the operational availability computation model that can be used on the weapon system's requirement planning phase. The proposed model consists of the time parameters of Ao(Operational Availability) for a system and each time parameter's estimation method. The time parameters for Ao computation are TT(Total Time) and TDT(Total Down Time). The time parameters are defined by considering OMS/MP(Operational Mode Summary/Mission Profile) elements. TT is a calendar time as a specific mission time at wartime or one year at peacetime. TDT consists of TPM(Total Preventive Maintenance time), TCM (Total Corrective maintenance time), TALDT(Total Administrative and Logistics Down Time). Then the estimation method for these time parameters are presented by the weapon systems types.

Construction of Distribution Information System for Recovery and Management of used Parts of an Automobile (자동차 중고부품 회수 및 관리를 위한 물류정보시스템 구축)

  • Jung, Nam-Cheol
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.3
    • /
    • pp.203-212
    • /
    • 2007
  • Until now, used parts of automobiles necessary for the remake of automobiles have been recovered from auto repair shops. But it takes much time and cost to collect those parts because the recovery system has not been set up. Furthermore. used parts from auto junk yards have rarely been used for the remaking. This current situation will improve by adopting DISRMPA(Distribution Information System for Recovery and Management of used Parts of Automobiles) designed by the author. Auto repair shops or junk yards input the information of used parts to make a database in the system. Remaking companies use the database to find and recover used parts. The DISRMPA can help prepare stabilized ways to supply used parts.

  • PDF

Development of Stream Bed-slope Estimation Equation for Preparing Data in a Grid-based Storm Runoff Model (분포형 강우-유출 모형 자료구축을 위한 하상경사 산정공식 개발)

  • Jung, In-Kyun;Joh, Hyung-Kyung;Park, Jong-Yoon;Park, Min-Ji;Kim, Seong-Joon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.160-163
    • /
    • 2010
  • 분포형 강우-유출모형의 모의결과는 지형, 토지피복 및 토양 특성에 영향을 받는다. 그 중에서 지형과 관련하여 하도에 위치한 셀의 경사는 첨두 유출량의 도달시간과 매우 밀접한 관계가 있다. 분포형 강우-유출모형에서 하도의 지형적 특성은 모든 하도 셀마다 입력되어야 하는데 셀이 위치한 지점별로 실제 하천측량을 통해 입력하는 것이 가장 정확한 방법일 수 있으나 시간과 많은 비용이 소요되므로 DEM(Digital Elevation Model)으로부터 산정된 경사 값을 주로 적용한다. 본 연구에서는 충주댐유역의 2006~2008년 수립된 13개 하천의 하천정비기본계획을 참고하여 1,100개 횡단측점에 대한 하상경사를 구축하고 유역의 흐름경로길이와의 관계를 분석함으로서 분포형 강우-유출모형의 하상경사를 적용할 수 있는 산정공식을 개발하였다. 4개 강우사상에 대하여 적용하여 DEM으로부터 산정된 경사를 적용한 경우와 비교한 결과 첨두유량이 증가하고 첨두유출 발생시간이 단축되는 결과를 나타내었다.

  • PDF

RAUT: An End-to-End Tool for Automated Parsing and Uploading River Cross-sectional Survey in AutoCAD format to River Information System for Supporting HEC-RAS Operation (하천정비기본계획 CAD 형식 단면측량자료 자동 추출 및 하천공간 데이터베이스 업로딩과 HEC-RAS 지원을 위한 RAUT 툴 개발)

  • Kim, Kyungdong;you, Hojun;Kim, Dongsu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.75-75
    • /
    • 2020
  • 하천법에 의거하여 국내 하천들에는 상당한 국가예산으로 하천정비기본계획이 5-10년 주기로 수립되고 있으며, 홍수위 계산을 위한 HEC-RAS 모의에 필요한 하천단면 등 다양한 하천측량이 실시되고 있다. 그러나, 하천측량자료들은 하천관리지리정보시스템(RIMGIS)에 pdf 보고서 형태로만 제공되고, 원자료는 CAD 형식으로 하천정비계획을 수행한 설계사 등이 분산 소유하고 있어 관리부재로 망실의 우려도 있어, 다른 용도로의 활용성이 상당히 저하되어 있는 실정이다. 그리고, 측량된 CAD 형식의 단면자료 등을 HEC-RAS에 활용할 때, 'Dream'과 같은 툴을 활용하나 거의 수작업에 가까운 시간과 비용이 소요되는 현실에 있다. 본 연구에서는 이러한 문제들을 해결할 수 있는 툴인 RAUT(River information Auto Upload Tool)를 개발하였다., RAUT 툴은 첫째, 실무에서 하천기본계획 수립 시 활용되는 HEC-RAS 1차원 모형의 입력자료를 CAD 측량자료를 직접수기로 입력 및 모의를 실시하는 복잡한 단계를 자동화시키고자 하였다. 둘째, 하천공간정보인 CAD측량 자료를 직접 읽어 표준 데이터 모델 (Arc River)기반 하천공간정보 DB에 자동 업도드하여 전국단위의 하천정비계획의 하천측량자료 관리가 가능하게 할 수 있다. 즉, 만약 RIMGIS가 RAUT와 같은 툴을 사용하면 하천단면과 같은 전국단위 하천측량 자료를 체계적으로 관리할 수 있게 된다는 의미이다. 개발한 RAUT는 제주도 한천유역을 대상으로 하천정비기본계획의 하천공간정보 CAD자료를 읽어들여 mySQL기반 공간 DB로 구축하고, 구축된 DB로부터 HEC-RAS 1차원 모의 실시하기 위한 지형자료를 자동으로 생성시키는 과정을 시범적으로 구현하였다.

  • PDF

A GMDH-type performance modeling for FMS with unreliable RAM and LCC (GMDH 방법을 이용한 FMS의 성능 예측 방안의 연구)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.111-120
    • /
    • 1995
  • 통합생산시스템에서의 고장, 정비 및 가용 도는 매우 중요한 역할을 한다. 시스템 설계시의 RAM 파라메터의 결정은 시스템의 성능과 소요비용 및 구성(System Configuration)등에 크게 영향을 미친다. 이러한 시스템관련 요소의 숫자가 많거나 불확실할 경우는 시스템의 성능예측이 매우 복잡하게 된다. 이러한 시스템의 성능(performance) 평가를 위하여 발견적 방법인 GMDH(Group Method Data Handlinng) Type Modeling 방법을 이용하여 FMS의 성능 평가를 시도하였다. RAM 및 기계작업시간의 Data로부터 시스템성능의 척도로서 단위 사이클 기간동안의 생산률, 시스템내의 총 흐름시간, 각 작업장이 기계의 RAM 및 LCC등을 고려하였다. GMDH 알고리즘의 계산을 위한 프로그램을 개발하고, 이를 L형 Bracket제조시스템의 성능 예측에 시험 적용하였다. 본 Modeling에 의한 시스템의 성능예측 방법은 입출력 자료의 처리과정을 개선할 경우 FMS계획및 운영 단계에서 성능평가에 매우 유용하게 활용될수 있을 것으로 본다.

  • PDF

A Study on the Life Cycle Cost Calculation of the Railroad Vehicle Based on the Maintenance Information (철도차량 유지보수정보를 이용한 수명주기비용 계산 연구)

  • Kim, Jae-Hoon;Jun, Hyun-Kyu;Park, Jun-Seo;Jeong, Hyun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.88-94
    • /
    • 2009
  • Life cycle costing is one of the most effective approaches for the cost analysis of long-life products such as the railroad vehicle. Life cycle costing includes the cost of concept design, development, manufacture, operation, maintenance and disposal. Especially, life cycle costing in the railroad industry has been focused on the maintenance cost. In this paper, the standard, guide and maintenance information of railroad vehicle were investigated, and the unique corrective and preventive maintenance templates of railroad vehicle were proposed. Maintenance cost of an auxiliary power supply system of EMU was predicted by using the proposed templates. The results show that the preventive maintenance, PM, cost is much higher compare to corrective maintenance, CM, cost because of daily and monthly maintenance tasks which require lots of labor work. It is expected that these templates can help railroad operators make maintenance strategies with consideration of the cost parameter.

Introduction of River Space Survey and Output Data using Drone (드론을 활용한 하천공간조사 및 산출물 소개)

  • Kim, Tae-Jeong;Kim, Chang-Sung;Kim, Sung-Hoon;Lee, Sung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.229-229
    • /
    • 2020
  • 최근 광학이미지 및 레이저를 활용한 계측 기술이 발전됨에 따라서 수공학 분야의 지리정보시스템(Geographic Information System, GIS) 및 원격탐사(Remote Sensing, RS) 기술의 활용 분야가 증가하고 있다. 광범위한 하천공간의 조사결과를 가시화하고 품질 및 활용성 제고를 위하여 GIS 및 RS 기술과 같은 고도화된 조사기술 및 장비의 도입하고 많이 활용하고 있다. 우리나라의 하천은 지형학적 특성으로 하천연장이 길고 접근성이 매우 불리하다. 하천정비 사업을 통하여 하천에 근접하게 접근할 수 있는 조건이 있다 하더라도 교목이나 지형지물에 의하여 시야 확보가 어려운 조사구간이 많다. 하천공간조사를 위한 드론 활용의 장점은 차량 및 도보로 접근이 어려운 조사대상에 접근하여 다양한 각도로 촬영하여 조사 목적에 부합하는 성과물 획득이 가능하다. 한국수자원조사기술원은 하도특성(평면, 사행 및 종횡단 조사)을 사전에 하천기본계획 보고서에서 곡률반경과 만곡도, 유심편향축, 최심하상경사 및 평균하상경사 등을 수집하고 현장에서 드론을 활용하여 접근조사가 어려운 항목에 대하여 드론을 적극적으로 활용하여 조사하고 있다. 드론을 활용할 경우 인력 및 소요시간이 대폭 절감되며 조사목적에 부합하는 다양한 조사 성과물을 얻을 수 있은 장점이 있다. 최종적으로 촬영된 영상자료는 넓은 범위의 하천공간을 고해상도 수치 지도화가 가능해 하천특성을 정량적으로 평가할 수 있을 것으로 판단된다.

  • PDF

Older Drivers' Characteristics and Optimal Number of Guide Names on Road Signs (도로표지에 대한 고령운전자의 인간공학적 특성과 적정 안내지명 개수에 대한 연구)

  • Noh, Kwan-sub;Lee, Jong-hak;Kim, Jong-min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.235-242
    • /
    • 2008
  • Due to the lack of judgement in an information processing on road sign, older drivers usually are having a hard time driving than young group. Furthermore, according to increasing in aging population, older drivers in Korea have been growing much faster. That means research for older drivers' characteristics and the number of guide name for road sign should be needed. In accordance with suggestions, this study was carried out the number of guide names for road sign with a variety of ages from the twenties to the seventies. For the sake of this study, statistical verification was conducted to confirm a change of speed, a reading time and a misreading rate with Driving Simulator and Electrooculogram tool. As the results of study, change of speed in the age range has shown that the higher the proportion of age, the lower the rate of velocity. Also reading time in the age range with regression analysis found that the higher the proportion of age, the higher the rate of reading time by 0.106sec. Finally, a binary logistic model was used to find the main factors. As the results, 4 number of guide names for road sign have been the best of them for older driver. The result of this study verified the importance of ideal guide numbers on road sign for older driver and proved itself to be an effective method to determine the road safety for the road signs.

Review on the Working Hours of Radiation Work Plan for ECT through In-service Inspection (원전 가동중 ECT 검사 방사선 작업시간 고찰)

  • Chae, Gyung-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.

A Survey on the Break-down and Repair of the Power Tillers in Korea (동력경운기(動力耕耘機) 이용실태(利用實態) 조사분석(調査分析)(II) -고장(故障) 및 수리(修理)에 관(關)하여-)

  • Hong, Jong Ho;Lee, Chai Shik
    • Journal of Biosystems Engineering
    • /
    • v.6 no.1
    • /
    • pp.28-38
    • /
    • 1981
  • A survey has been conducted to investigate the presents of breaks down and repair of power tiller for efficient use. Eight provinces were covered for this study. The results are summarized as follows. A. Frequency of breaks down. 1) Power tiller was breaken down 9.05 times a year and it represents a break down every 39.1 hours of use. High frequency of breaks down was found from the fuel and ignition system. For only these system, the number of breaks down were 2.02 and it represents 23.3% among total breaks down. It was followed by attachments, cylinder system, and traction device. 2) For the power tiller which was more than six years old, breaks down accured 37.7 hours of use and every 38.6 hours for the power tiller which was purchased in less than 2 years. 3) For the kerosene engine power tiller, breaks down occured every 36.8 hours of use, which is a higher value compared with diesel engine power tiller which break down every 42.8 hours of use. The 8HP kerosene engine power tiller showed higher frequency of break down compared with any other horse power tiller. 4) In October, the lowest frequency of break down was found with the value of once for every 51.5 hours of use, and it was followed by the frequency of break down in June. The more hours of use, the less breaks down was found. E. Repair place 1) 45.3% among total breaks down of power tiller was repaired by the owner, and 54.7% was repaired at repair shop. More power tiller were repaired at repair shop than by owner of power tiller. 2) The older the power tiller is, the higher percentage of repairing at the repair shop was found compared with the repairing by the owner. 3) Higher percentage of repairing by the owner was found for the diesel engine power tiller compared with the kerosene engine power tiller. It was 10 HP power tiller for the kerosene power tiller and 8 HP for the diesel engine power tiller. 4) 66.7% among total breaks down of steering device was repaired by the owner. It was the highest value compared with the percentage of repairing of any other parts of power tiller. The lowest percentage of repairing by owner was found for the attachments to the power tiller with the value of 26.5%. C. Cause of break down 1) Among the total breaks down of power tiller, 57.2% is caused by the old parts of power tiller with the value of 5.18 times break down a year and 34.7% was caused by the poor maintenance and over loading. 2) For the power tiller which was purchased in less than two years, more breaks down were caused by poor maintenance in comparison to the old parts of power tiller. 3) For the both 8-10 HP kerosene and diesel engine power tiller, the aspects of breaks down was almost the same. But for the 5 HP power tiller, more breaks down was caused by over loading in comparison to the old parts of power tiller. 4) For the cylinder system and traction device, most of the breaks down was caused by the old parts and for the fuel and ignition system, breaks down was caused mainly by the poor maintenance. D. Repair Cost 1) For each power tiller, repair cost was 34,509 won a year and it was 97 won for one hoar operation. 2) Repair cost of kerosene engine power tiller was 40,697 won a year, and it use 28,320 won for a diesel engine power tiller. 3) Average repair cost for one hour operation of kerosene engine power tiller was 103 won, and 86 won for a diesel engine power tiller. No differences were found between the horse power of engines. 4) Annual repair cost of cylinder system was 13,036 won which is the highest one compared with the repair cost of any other parts 362 won a year was required to repair the steering device, and it was the least among repair cost of parts. 5) Average cost for repairing the power tiller one time was 3,183 won. It was 10,598 won for a cylinder system and 1,006 won for a steering device of power tiller. E. Time requirement for repairing by owner. 1) Average time requirements for repairing the break down of a power tiller by owner himself was 8.36 hours, power tiller could not be used for operation for 93.58 hours a year due to the break down. 2) 21.3 hours were required for repairing by owner himself the break down of a power tiller which was more than 6 years old. This value is the highest one compared with the repairing time of power tiller which were purchased in different years. Due to the break down of the power tiller, it could not be used for operation annually 127.13 hours. 3) 10.66 hours were required for repairing by the owner himself a break down of a diesel engine power tiller and 6.48 hours for kerosene engine power tiller could not be used annually 99.14 hours for operation due to the break down and it was 88.67 hour for the diesel engine power tiller. 4) For both diesel and kerosene engine power tiller 8 HP power tiller required the least time for repairing by owner himself a break down compared with any other horse power tiller. It was 2.78 hours for kerosene engine power tiller and 8.25 hours fur diesel engine power tiller. 5) For the cylinder system of power tiller 32.02 hours were required for repairing a break down by the owner himself. Power tiller could not be used 39.30 hours a year due to the break down of the cylinder system.

  • PDF