• Title/Summary/Keyword: 전력공사

Search Result 987, Processing Time 0.029 seconds

Development of Portable Boiler Tube Health Evaluation System (휴대용 보일러튜브 건전성 평가시스템 개발)

  • Chang Min Lee;Han Sang Lee;Bum Shin Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.101-108
    • /
    • 2023
  • Although the proportion of coal-fired power generation is decreasing, efficient operating technology is needed to continuously invest in facilities and reduce maintenance costs until it is abolished. Boilers, one of the main facilities of power plants, operate for a long time in harsh environments of high temperature and high pressure. In addition, damage due to deterioration is likely to occur depending on the fuel and tube material used. It is very important to judge soundness because damage caused by deterioration adversely affects facility operation. Previously, replication method was used to analyze the progress of deterioration. In the replication method, pre-treatment such as chemical treatment is performed on the boiler tube in the field, the area is reproduced by attaching a film, and the replicated film is determined by an expert in the laboratory with an expensive microscope. However, this method involves substantial costs and time requirements, as well as the possibility of human errors. To address these issues, we developed a mobile health assessment system in this research. Since it is detachable and takes images in real time, this system enables swift evaluations across a broad range and facilitates the assessment of preprocessing quality. In addition, it was intended to reduce existing human mistakes by developing a degradation classification algorithm using the merger cluster method.

대만의 원자력산업 근황

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.8 no.1 s.59
    • /
    • pp.14-20
    • /
    • 1988
  • 1978년 12월부터 1985년 5월까지 6년반동안 대만전력공사는 3개소의 원자력발전소(로형별로는 BWP 4기, PWR 2기)를 운전개시했으며, 1986년에 이 발전소들은 대만 전체 전력량의 $43\%$ 이상을 공급하였다. 그동안 대만전력공사는 종업원에 대한 훈련과 발전소의 성능 및 운영면의 개선을 위해 주력해왔으며, 1983년부터 대만정부는 원자력프로그램의 2단계사업 착수승인을 보유해왔다. 이 2단계사업에는 6기의 1,000MWe원자력발전소의 신규건설이 포함되어 있으며, 이 중 4기는 2000년 이전에 운전개시하도록 계획되어 있어 원자력발전은 대만정부의 탈유정책의 근간를 이루고 있다.

  • PDF

Analysis of Cracks on Flange Bolts at 154kV Transmission Line Hollow Supporter (154kV 송전선로 관형지지물 플랜지 볼트 균열 분석기술 현장적용)

  • Lee, Jaehong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.59-62
    • /
    • 2021
  • 관형지지물은 단일 강관 기둥 형태의 송전탑으로 강관은 상하 여러 개의 프레임으로 분할되어 플랜지부에서 볼트로 체결된다. 신설 송전선로 관형지지물 플랜지 연결부에서 가압전 조립 볼트 절손이 발견됨에 따라 강관도괴방지 대책 수립을 위한 손상원인분석 기술지원을 수행하였다. 본 건에 대해 파손면·균열 분석 기술을 통해 제작과정 상의 문제가 있었음을 확인하였다.

Analysis of Turbine Blade Damage at Ravic Power Plant, Saudi Arabia (사우디 라빅발전소 터빈 블레이드 파손 분석기술 현장 적용)

  • Park, Jun Su
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.53-58
    • /
    • 2021
  • 한전에서 운영중인 사우디라빅발전소에서 저압터빈 블레이드가 파손되었다. 블레이드의 경우 터빈의 핵심부품으로서 증기를 활용하여 발전기를 회전시켜 전기를 생산하는데 필수 부품이다. 반복적인 사고발생을 예방하기 위해 조직분석, 운전신호 분석등을 활용하여 원인을 규명하였고, 대책을 제시하였다.

Development of "Safety Footing for Passage for Moving Pylon Arms" to Prevent Falling of Pylon Boarders (철탑승탑자 추락예방을 위한 "철탑 암(Arm) 이동을 위한 통로용 안전발판" 개발)

  • Kwon, Soonho
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.233-236
    • /
    • 2021
  • 종래의 사용중인 송전철탑 암(Arm) 이동 또는 작업을 위해서는 암주재를 발로 딛고 이동 하거나 작업하는데 발디딤 공간이 부족하여(7~15cm)안전사고 발생요인이 되고 있다. 이러한 문제점을 개선하고자 철탑 암 이동 또는 작업 시 작업자의 심리적 안정감과 물리적 안전조건을 강화시키기 위해 발디딤 공간을 30cm 로 확대시킨 "철탑 암 이동을 위한 통로용 안전발판"(이하, 철탑 암 안전발판)을 개발하였다.

Building Underground Facility Management System of Power Transmission and Power Distribution using GIS (지리정보체계를 이용한 송배전 지하시설물관리시스템 구축)

  • Jang, Yong-Gu;Kang, In-Joon;Kim, Sang-Seok;Yang, Seung-Tae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.2
    • /
    • pp.69-77
    • /
    • 2004
  • Now, there are some problems to manage underground facilities in domestic. Specially, in the case of KEPCO(Korea Electric Power Corporation), it is so difficult to manage electronic line more stably and detailedly because the geographic information and attribute information being built is not easy to be updated in the field. KEPCO officials who are accompanying management and supervision in earthwork do not have sufficient knowledge and information about GIS but they grasp the information of geography and property which coincide with the field. Therefore they have to refer their business analysis contents sufficiently for more efficient lines management in the KEPCO, but it is problem that the existing information of electronic lines management system is not. In this study, we constructed power transmission and power distribution underground facility management system for the user to manage and maintain underground facilities more easily and safely using the information of geography and property about power transmission and power distribution underground facility which have been built by KEPCO.

  • PDF

전기로 인한 화재폭발 방지대책

  • 김기욱
    • Electric Engineers Magazine
    • /
    • v.209 no.1
    • /
    • pp.38-42
    • /
    • 2000
  • 전기관계법령에 의거 전력시설물의 설계, 공사, 감리, 유지 및 관리를 담당해야 하는 전력기술인들이 각종 업역에서 전기로 인한 재해를 줄이기를 바라는 마음에서 관련법령에 근거, 전력시설을 방폭설비를 하는 이유와 폭발재해와 그 대책에 대하여 서술하오니 전력기술업무에 참고하길 바랍니다.

  • PDF

업계동정

  • Korea Electrical Manufacturers Association
    • NEWSLETTER 전기공업
    • /
    • no.99-16 s.233
    • /
    • pp.25-33
    • /
    • 1999
  • PDF

Mid-long term analysis and prospect on jeju island's power generation sector (중장기적 제주지역 발전사업 진단 및 전망)

  • Kim, Woo-Gon;Choi, Byung-Ki;Kim, Wook
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.380-381
    • /
    • 2006
  • 정부는 제3차 전력수급기본계획 수립에 대비하고, 고가로 공급되는 LPG 수요를 대체하기 위한 제주도청의 LNG 공급요청과 제주지역에서 LNG사업을 희망하는 한국가스공사의 의향 그리고 한국전력공사의 전력연계선 추가건설 추진 등을 종합적으로 감안하여 이에 관한 세부 연구를 한국전기연구원에 위탁한 바 있다. 분석을 위한 전제 자료는 유관 사업자와 중립적 입장에 있는 한국전력거래소의 세밀한 검토와 합의를 거쳐 정해졌으며, 전력과 가스부문은 물론 이와 관련된 사회적 비용(Social Cost)이 모두 고려되었다. 아직까지 최종 결론은 확정되지 않았지만 연계선을 추가로 건설하는 방안이 가장 우세한 것으로 전해지고 있다. 따라서 본 논문은 추가 전력연계선 건설과 제3차 전력수급기본계획시 발전사업자가 제출한 제주지역에서의 발전소 건설 의향 등을 반영하여 2010년 이후 제주지역에서의 발전사업을 분석하고 전망하였으며, 예상되는 문제점을 중심으로 발전사업자 입장에서 개선방안을 제시하고자 하였다.

  • PDF