• Title/Summary/Keyword: 전단면 기계굴착

Search Result 7, Processing Time 0.019 seconds

Improvement of Tunnelling Speed in Full-Face Mechanical Excavation (기계굴착에서 굴착속도의 발전경향분석)

  • Park, Chul-Whan;Park, Chan;Cheon, Dae-Sung;Synn, Joong-Ho
    • Tunnel and Underground Space
    • /
    • v.17 no.3 s.68
    • /
    • pp.225-233
    • /
    • 2007
  • Because of Norwegian topography as valleys and fjords, a large number of tunnels has been built and 59 of them have been excavated by TBM for last 30 years. Prognosis technology has been developed and improved through lots of TBM experiences, and the NTNU prediction model has been completed. This paper focuses the improvement of net penetration rate and advance rate in 14 Norwegian and 4 Koran TBM tunnelling sites of which data were reported. Through this period, net penetration rate as well as advance rate were increased to double with the improvement of disc cutter size and cutter arrangement in Norway. These rates in Korea were also increased for 15 years even though the rates were lower compared to Norwegian. It is estimated that these low rates were mainly caused by using disc cutters less than 17 inch diameter. It is expected that net penetration rate and advance rate can be increased by improvement of machine and tunnelling technology, especially by using 17 or 19 inch of the disc cutter size in the Korean full face mechanical tunnelling site.

터널의 라이닝 기계 설비

  • 김성구
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.6-17
    • /
    • 2003
  • 라이닝과 굴착작업은 통상적으로 병행작업이 되며, 라이닝은 시공속도가 빠르기 때문에 공기는 주로 굴착 속도에 지배된다. 그러나 소단면/원형단면 터널에서는 작업 공간확보문제 등 제반조건에 따라 굴착과 라이닝 작업이 분리되어 라이닝 공정이 전체 공기에 커다란 영향을 끼치는 경우도 있다. 라이닝 콘크리트의 타설시기는 계측에 의해 원지반의 변위가 수렴된 것을 확인한 후 하는 것이 원칙이다. 따라서 NATM 에서는 전단면 라이닝이 일반적이다. 본 고에서는 라이닝 설비로서 사용되는 타설설비, 운반설비, 형틀설비의 총 3편으로 나누어 라이닝 기계에 대하여 설명하도록 한다.

  • PDF

Predicting ground condition ahead of tunnel face utilizing electrical resistivity applicable to shield TBM (Shield TBM에 적용 가능한 전기비저항 기반 터널 굴착면 전방 예측기술)

  • Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.599-614
    • /
    • 2014
  • When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.

A Case Study on the Shaft Construction Using Electronic Detonators (전자뇌관(HiTRONIC II™)을 이용한 수직구 시공 사례)

  • Hwang, Nam-Sun;Jin, Geun-Woo;Yeo, Jin-Hyeok;Jeong, Dong-Ho;Kim, Yeon-Hong
    • Explosives and Blasting
    • /
    • v.38 no.2
    • /
    • pp.22-35
    • /
    • 2020
  • Recently, electronic detonators have been widely used in various sites. Electronic detonators are often used for the purpose of reducing the noise and vibration produced by blasting. In addition, electronic detonators are used for precision blasting at sites where mechanical excavation techniques are applied due to proximity of safety things or where blasting by conventional detonators are not possible. Various technologies are being attempted at the blasting site to increase constructivity and lower production costs by using electronic detonators. In this paper, we would like to introduce a construction case that use of electronic detonators in the situation of safety things being adjacent increases the efficiency of construction while meeting the ground vibration criteria of Ministry of Land, Infrastructure, and Transport. The blasting was carried out at domestic and overseas shaft using HiTRONIC II™, produced by Hanwha. Generally the shaft blasting is performed by dividing the blasting surface because of the noise and vibration caused by the blasting. but, in the case introduced in this paper, the blasting was carried out once without dividing the blasting surface, thus the construction period could be shortened.

Barton-Bandis 절리 모델에 의한 지하대공동 암주의 변형 특성 연구

  • 강추원;임한욱;김치환
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.118-131
    • /
    • 2001
  • 우리 나라의 양수발전소는 지금까지 단일공동을 굴착하였다. 그러나 양양 양수발전소는 두 개의 대공동 즉, 발전소와 주 변전소로 구성된다. 이 경우 공동 구조물의 안정성, 특히 두 공동사이에 형성되는 암주를 영구적으로 안전하게 유지 할 수 있도록 보장되어야 한다. 본 연구에서는 개별요소법을 이용하여 두 공동과 암주의 구조적 안정성을 평가하였으며, 구성모델로 Barton-Bandis의 절리모델을 이용하였다. 현지 암반의 초기응력, 자연절리면의 거칠기계수 불연속면의 공간적 분포 특성과 같은 중요한 요인들은 현지 조사를 통하여 구하였다. 이외에 두 가지 경우 즉, 무보강과 보강의 경우 지보시스템의 최적화를 분석하였으며, 또한 보강효과를 검토하였다. 연구결과 보강의 경우 수평변위와 절리의 전단변위가 감소되었으며 암주내 이완영역 역시 감소됨을 확인하였다. 두 공동사이에 있는 약 36m 두께의 암주에 적절한 보강조치를 취하여 안정성을 확보할 수 있었다.

  • PDF

Analysis on the behavior of shield TBM cable tunnel: The effect of the distance of backfill grout injection from the end of skin plate (뒷채움 주입 거리에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석)

  • Cho, Won-Sub;Song, Ki-Il;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.213-224
    • /
    • 2014
  • Recently, tunnelling with TBM is getting popular for the construction of cable tunnel in urban area. Mechanized tunnelling method using shield TBM has various advantages such as minimization of ground settlement and prevention of vibration induced by blasting that should be accompanied by conventional tunnelling. In Korea, earth pressure balance (EPB) type shield TBM has been mainly used. Despite the popularity of EPB shield TBM for cable tunnel construction, study on the mechanical behavior of cable tunnel driven by shield TBM is insufficient. Especially, the effect of backfill grout injection on the behavior of cable tunnel driven by shield TBM is investigated in this study. Tunnelling with shield TBM is simulated using 3D FEM. The distance of backfill grout injection from the end of shield skin varies. Sectional forces such as axial force, shear force and bending moment are monitored. Vertical displacement at the ground surface is measured. Futhermore, the relation between volume loss and the distance of backfill grout injection from the end of skin plate is derived. Based on the stability analysis with the results obtained from the numerical analysis, the most appropriate injection distance can be obtained.

Analysis on the Deformation Characteristics of a Pillar between Large Caverns by Burton-Bandis Rock Joint Model (Barton-Bandis 절리 모델에 의한 지하대공동 암주의 변형 특성 연구)

  • 강추원;임한욱;김치환
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.109-119
    • /
    • 2001
  • Up to now single large cavern was excavated for each undergroud hydraulic powerhouse in Korea. But the Yangyang underground hydraulic powerhouse consists of two large caverns; a powerhouse cavern and main transformer cavern. In this carte, the structural stability of the caverns, especially the rock pillar formed between two large caverns, should be guaranteed to be sound to make the caverns permanently sustainable. In this research, the Distinct Element Method(DEM) was used to analyze the structural stability of two caverns and the rock pillar. The Barton-Bandis joint model was used as a constitutive model. The moot significant parameters such as in-site stress, JRC of in-situ natural joints, and spatial distribution characteristics of discontinuities were acquired through field investigation. In addition, two different cases; 1) with no support system and 2) with a support system, were analysed to optimize a support system and to investigate reinforcing effects of a support system. The results of analysis horizontal displacement and joint shear displacement proved to be reduced with the support system. The relaxed zone in the rock pilar also proved to be reduced in conjunction with the support system. Having a support system in place provided the fact that the non zero minimum principal stresses were still acting in the rock pillar so that the pillar was not under uniaxial compressive condition but under triaxial compressive condition. The structural stability f an approximately 36 m wide rock pillar between two large caverns was assured with the appropriate support system.

  • PDF