Improvement of Tunnelling Speed in Full-Face Mechanical Excavation  

Park, Chul-Whan (한국지질자원연구원 지반안전연구부)
Park, Chan (한국지질자원연구원 지반안전연구부)
Cheon, Dae-Sung (한국지질자원연구원 지반안전연구부)
Synn, Joong-Ho (한국지질자원연구원 지반안전연구부)
Publication Information
Tunnel and Underground Space / v.17, no.3, 2007 , pp. 225-233 More about this Journal
Abstract
Because of Norwegian topography as valleys and fjords, a large number of tunnels has been built and 59 of them have been excavated by TBM for last 30 years. Prognosis technology has been developed and improved through lots of TBM experiences, and the NTNU prediction model has been completed. This paper focuses the improvement of net penetration rate and advance rate in 14 Norwegian and 4 Koran TBM tunnelling sites of which data were reported. Through this period, net penetration rate as well as advance rate were increased to double with the improvement of disc cutter size and cutter arrangement in Norway. These rates in Korea were also increased for 15 years even though the rates were lower compared to Norwegian. It is estimated that these low rates were mainly caused by using disc cutters less than 17 inch diameter. It is expected that net penetration rate and advance rate can be increased by improvement of machine and tunnelling technology, especially by using 17 or 19 inch of the disc cutter size in the Korean full face mechanical tunnelling site.
Keywords
TBM; Norwegian tunnelling; Net penetration rate; Advance rate; Disc cutter;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Johannessen S. and O. Askilsrud, 1993, Meraker Hydro-Tunnelling - the Norwegian way, Proc. RETC 1993
2 NTNU, 1994, Hard rock tunnel boring, Project Report 1-94
3 Hansen A., 1998, 'The history of TBM tunnelling in Norway', Norwegian TBM Tunnelling, NSREA
4 부산직할시, 1987, 구덕 수로터널축조 건설지
5 박철환, 박연준, 2005, 노르웨이 메로케르 수력발전소의 TBM 굴착, 터널과 지하공간 제 15권, p. 22-27, 한국암반공학회   과학기술학회마을
6 Brindheim O. T., E. Johansen and A. Hegreneas, 1998, 'Bored road tunnels in hard rock', Norwegian TBM Tunnelling, NSREA
7 배규진, 장수호, 2006, 시공 리스크를 고려한 TBM의 굴진성능 향상 및 평가기술, 제 7차 터널 기계화 시공기술 심포지움 논문집, 한국터널공학회
8 한국자원연구소, 1991, 전단면 터널 굴착기술 개발 연구, 한국자원연구소 연구보고서 KR-91-B-15, 과학기술처