Analysis of BIM Impact on Preventing Rework in Construction Phase (시공단계 BIM 적용에 의한 재시공 방지 효과분석)

  • Lee, Myung-Do;Cha, Min-Su;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.169-176
    • /
    • 2018
  • The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.

A Case Study and Analysis on Reasonable Construction Period and Appropriate Number of Persons for Works According to Reconstruction (재시공발생에 따른 적정계약공기 및 적정출력인원 추정에 관한 사례조사 및 분석)

  • So Young-Sung;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.301-304
    • /
    • 2001
  • The purpose of this study is presume that reasonable construction period of constract and appropriate number of persons for works according to reconstruction. This study is presume reasonable construction period of constract and appropriate number of person of reconsruction with a case study out of apartment R.C construction. The result of this study are as follows: 1. In case of four building of apartment Resonable constrution period: 750days$\sim$800days, the average(1day) number of persons under working: 63.5 persons. 2. In case of four building of apartment Resonable constrution period: 850days$\sim$900days, the average(1day) number of persons under working: 100.6 persons. 3. In case of four building of apartment Resonable constrution period: 1000days$\sim$1050days, the average(1day) number of persons under working: 145.0 persons.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

감사원, 2단계 부실공사 방지대책

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.51
    • /
    • pp.40-42
    • /
    • 1994
  • 감사원은 준공된 부실공사에 대해 관련공직자의 책임추궁을 대폭 강화하고 부실시공업체에 대해서도 제재를 강화해 해당업체가 더이상 건설업계에 발을 붙이지 못하게 할 방침이다. 또한 이같은 영업활동제한과는 별도로 부실시공부분은 원칙적으로 철거$\cdot$재시공하도록 하고, 시설물의 내구성 및 기능 저하땐 손해보전요구도 병행해 부실시공업체는 업계생존이 불가능하도록 할 방침이다. 그리고 준공검사와 하자검사제도를 품질검사위주로 전환하고 이를 담당할 전문검사기관을 육성하는 등 부실시공 방지대책을 강력히 추진하기로 했다. 본고는 감사원의 $\ulcorner$2단계 부실공사 방지대책$\lrcorner$ 추진방향을 종합적으로 살펴본 내용이다.

  • PDF

A Case Study on the Restoration of Collapsed Geosynthetics Reinforced Soil Wall Using Limit Equilibrium and Numerical Analyses (한계평형해석과 수치해석에 의한 붕괴된 보강토 옹벽 복구 사례에 관한 연구)

  • Won, Myoung-Soo;Kim, Hyeong-Joo;Kim, Young-Shin;Choi, Jeong-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.11
    • /
    • pp.107-118
    • /
    • 2013
  • Geosynthetic reinforced soil (GRS) walls have been increasingly applied recently due to its numerous geotechnical engineering applications. However failure occurs in some cases of constructed GRS walls. These GRS wall failures are mostly due to the unpredictable characteristics of intensive rainfall. Hence, the need for new and innovative ideas for rehabilitation methods has been getting attention. This paper introduces a case study for the design and restoration method of collapsed GRS wall using Limit equilibrium and Numerical Analyses. Restoration method includes: (1) soil nailing without backfill excavation and (2) reconstruction with GRS wall after collapsed backfill excavation. Analyses results show minimal horizontal displacements and shear strain on the reinforced concrete facing for the restoration case with soil nailing. On the other hand, horizontal displacements are developed in the middle of the mortar block facing and shear strains are developed at the bottom facing with spiral curves for the reconstructed GRS wall after collapsed backfill excavation. Therefore, the collapsed GRS wall was restored with the soil nailing without backfill excavation and its construction procedures are discussed in this paper.

금속 용사를 통한 정수장 착수정 유입밸브의 방식에 관한 연구

  • Oh, Min-Hwan;Mun, Suk-Ju;Kim, Eun-Yeong;Kim, Byeong-Chun
    • Proceedings of the KIEE Conference
    • /
    • 1999.07d
    • /
    • pp.1941-1946
    • /
    • 1999
  • 본 연구는 우리 나라 물공급의 60% 이상을 담당하고 있는 한국 수자원 공사의 수자원 관리 설비의 방식에 관한 연구이다. 특히 수자원 관리 시설의 대부분이 철구조물로 외부에 노출되어 있거나, 해수와 담수에 동시에 접해있기도 하며 끊임없이 화학약품에 영향을 받고 있기도 하다 이러한 매우 열악한 환경 하에 있는 대부분의 설비 및 철구조물들은 부식이 쉽게 되어 부식으로 인한 시설관리 및 경제적 피해가 발생하게 된다. 수자원 공사는 여러 해 동안 설비 보전을 위해 부식에 관한 많은 연구들을 수행하고 있으며 그 중 도장을 통한 설비의 방식을 주로 시행하고 있으나 이런 도장 방식이 체계적으로 정리되어 있지 않고 또한 도장 방식의 수명이 길지 못하므로 주기적으로 재시공하여야 한다는 단점이 있다. 알루미늄 코팅 방식은 알루미늄이 철 보다 부식 전위가 낮아 부식이 잘 진행되어 철 구조물의 부식을 방지하는 희생 양극 특성이 있다. 그러나 알루미늄 도장의 경우 시공 단가가 비싼 단점이 있어 시공비를 줄이기 위하여 알루미늄 도장전에 철 구조물의 표면을 전처리하는 공정을 개선하여 총 시공비의 80%를 점하는 전처리 비용을 절감하여 경제적인 도장 방법을 조사하고자 하였다.

  • PDF

Studies on the Landscape Conservation Measures of the Radial Roadsides in Seoul Area (조경녹화사방(造景綠化砂防)에 관(關)한 연구(硏究))

  • Woo, Bo-Myeong
    • Journal of Korean Society of Forest Science
    • /
    • v.28 no.1
    • /
    • pp.67-96
    • /
    • 1975
  • The serious consequences of the roadside erosion and its impact on sedimentation and deterioration of roadside landscape continue to be documented in Koreas. An analysis on the landscape conservation treatments was made through the field survey for the 8 radial roadsides around Seoul area. This was performed to identify and evaluate the present restoration measures, and to establish the practical standard measures for the landscape conservation treatments on the cut-and banking roadside slopes.