• Title/Summary/Keyword: 재난현장

Search Result 689, Processing Time 0.027 seconds

A Study on the Improvement of Pile Foundations Based on the Analysis of Field Case Studies (말뚝기초 시공사례 실태분석을 통한 개선방안 연구)

  • Woo, Jae-Gyung;Lee, Su-Gon;Lee, Byok-Kyu;Jang, Seung-Jin
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.1
    • /
    • pp.81-92
    • /
    • 2012
  • In this study, in-depth site investigation related to design and construction of pile foundation was carried out, especially with respect to 103 large-scale bridges located in South Korea. As a result, the depths and location of investigation was unsatisfactory at the foundation investigation process. Moreover, pile load tests were not performed when the capacity of the file is calculated in planning phase, and it was difficult to determine the load capacity limit due to the fact that loading capacity was not specified in pile-loading test. The design criteria related to pile foundation does not reflect the reality of the construction site, and that causes over design, and economic inefficiency in budget. Therefore, the purposes of this study is to review case studies related to the bearing capacity of pile foundations and suggest improvements in the construction specifications.

Field Investigation for Identification of Contamination Sources in Petroleum-Contaminated Site (유류로 오염된 부지의 원인자 판단을 위한 현장조사 평가)

  • Park, Jeong Jun;Kim, Sung Hwan
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.2
    • /
    • pp.141-153
    • /
    • 2018
  • Purpose : The subject site selected in this study was a place that was prepared through the reclamation of foreshore completed in 1973. Since then, the site has been occupied by the industry of ship repair for over 30 years. Method : The results of a precise soil examination conducted in 2013 showed that the site was seriously contaminated with TPH over an area of $10,000m^2$ and GL(-)3.0m in depth, with an expanding coverage of contamination. Results : The soil contamination by refined petroleum products often results in adverse effects to human health and ecological systems, thus the contamination should be purified as soon as possible. Conclusion : Hydrogeological investigation can be employed to assess the groundwater movement and propagation of contamination to determine the potential agents or contaminants in the soil contaminated with high concentration TPH.

Analysis about Fill Deposit Poor Drainage through Permeability Test and Groundwater Monitoring (투수시험과 지하수 모니터링을 통한 매립층의 배수불량 원인 분석)

  • Jung, Hee-Suk;Lee, Kang-Il;Kim, Joon-Seok
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.2
    • /
    • pp.165-173
    • /
    • 2018
  • Purpose: The area such as historic sites where distributed in the hills surrounded by the mountains in the past, if heavy rains occur, soil that distributed in the substructure of a sedimentary layer's permeability decreases therefore, water do not smoothly drainage and increases surface structures' moisture content. Therefore, many phenomena occur such as the muddy ground. This experiment tried to figure out the cause of poor drainage, predicting poor drainage system when rainfall occur. So not only the base of cultural properties distributed in the historic site, but also have big influences on the upper structure. Method: We are going to propose an improvement plan through the various sites exploration and the field permeability test. In addition, analyze interrelationship to figure out the cause of the poor drainage through monitoring under ground water. Conclusion: As the result of the experiment, the cause of the poor drainage system formed on shallow depth of ground level inside of a land. We can see that soil of surface and fill deposit permeability was in poor condition. Therefore, it was in very inappropriate hydrogeological condition when surface water permeate into the underground when rainfall occurs.

A Study on the Practical Use of ICT for Safety Education Specialists (안전교육전문인력에 대한 ICT활용 교육을 위한 실태조사)

  • Jeong, Sang
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.505-512
    • /
    • 2020
  • Purpose: The purpose of this study is to identify the contents and problems of present education for safety education specialist and provide suggestions for improvement in the future by examining the current status of capacity building education for safe education specialist. Method: The analysis of current status was conducted based on the results of two training sessions on safety education specialists and the research on the actual condition was carried on targeting safety education specialists. Result: As a result of the research, most of the contents of education for safety education specialist are biased toward theory and lack of a systematic education system, resulting in that safety education tends to be field education and focuses on theory and audio-visual education. Safety education is not solved by theory, but can be maximized the effect through experience and practice to experience the real situation. Conclusion: Therefore, based on the results of this study, a method of ICT is proposed to utilize for safety education, so that safety education specialists can be provided with practical and effective safety education, which can be used at real safety field.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

A Study on Numerical Analysis of Flexible Pavements under Moving Vehicular Loads (차량의 이동하중을 고려한 연성포장의 수치해석 기법 연구)

  • Park, Seoksoon;Kim, Nakseok
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.3
    • /
    • pp.206-219
    • /
    • 2011
  • The important elements in pavement design criteria are the stress and strain distributions. To obtain reasonable stress and strain distribution, tire contact area and tire pressures are very important. This study presents a viscoelastic characterization of flexible pavement subjected to moving loads. During the test, both longitudinal and lateral strains were measured at the bottom of asphalt layers and in-situ measurements were compared with the results of numerical analysis. A 3-dimension finite element model was used to simulate each test section and a step loading approximation has been adopted to analyze the effect of a moving vehicle on pavement behaviors. For viscoelastic analysis, relaxation moduli, E(t), of asphalt mixtures were obtained from laboratory test. Field responses reveal the strain anisotropy (i.e., discrepancy between longitudinal and lateral strains), and the amplitude of strain normally decreases as the vehicle speed increases. In most cases, lateral strain was smaller than longitudinal strain, and strain reduction was more significant in lateral direction.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

A Study on the Self-Prevention Plan System (자체방제계획서 검토기준 마련 연구)

  • Kim, Sungbum;Noh, Hyeran;Lee, Jinseon;Kim, Jungmin;Ahn, Seungyoung;Seok, Kwangseol
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.50-55
    • /
    • 2013
  • Self-Prevention Plan Review Report and Review Standards Process Safety Management(PSM), Safety Management System(SMS), including the contents of the safety management system audit standards, notices and guidelines on the screening form and were analyzed. Were expected through the interview and screening personnel in the screening process to identify problems prior research so that it can be reflected in the. Also divided into methods such as document review and on-site implementation status of the review written Emergency Preparedness Plan depending on the item proposed. Toxic Chemicals Control Act(TCCA) Self-Prevention Plan Review Regulations. However, the substantial approval process, and do not enable the system performance lacked Self-Prevention Plan Review. Review half configuration to enhance the professionalism and efficiency of the work of this research was performed.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

A Study on the Institutional Improvement for the Employment Stability of Foreign Workers in the Construction Industry (건설업의 외국인 근로자 고용안정을 위한 제도적 개선방안 도출 연구)

  • Cho, Jae-Hwan
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.514-523
    • /
    • 2019
  • Purpose: This study was designed to provide necessary institutional improvements for job security for foreign workers in the domestic construction sector. Method: I analyzed the National Statistical Office and related reports to investigate the status of foreign workers. Based on this, the government came up with measures to improve the system. Results: Based on the current comparative advantage index (RCA) analysis, the technology standard of foreign workers compared to Korean workers was evaluated, and the results were analyzed in order of moldwork, rebar, concrete work, stone work, and waterproof work. Conclusion: A foreign worker's work system was introduced to solve the problem of local Lunar New Year's Day field manpower. To ensure stable implementation of the system, there is a need to improve the operation of the employment permit system at construction sites and limit the size of the construction industry that introduces the employment permit system.