• Title/Summary/Keyword: 작업 프로세스

Search Result 737, Processing Time 0.037 seconds

Work-flow Analysis and Specification Definition Method of Software Process (소프트웨어 프로세서의 작업흐름 분석과 명세정의 방법)

  • Yang, Hae-Sool
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.4
    • /
    • pp.904-914
    • /
    • 1998
  • BPR(Business Process Reengineering), a radical improvement approach of business process, has been paying attention, and work-flow management and automation has been concentrated on progress velocity of business process and productivity of engineers. In software engineering, software process engineering which focus to process begin to be watched, and for the purpose of software productivity and quality progress and reduction of development term, study on SPR(Software Process Reengineering) is being progressed. In this paper, made workflow analysis and design method for construction of work-flow management system of software process to stand firm process reengineering methodology. In other words, we studied modeling process methods for SPR process, and software process structure and workflow analysis method which construct software process workflow model and specification definition method of workflow software.

  • PDF

A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF

Analysis of Design Error Types in Business Process Modeling (비즈니스 프로세스 모델에서의 설계 오류 유형 분석)

  • Gun-Woo Kim;Jeong Hwa Lee;Jae Hyung Kim;Jin Hyun Son
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.665-668
    • /
    • 2008
  • 비즈니스 프로세스란 기업의 모든 고객에게 적절한 서비스를 제공하기 위해 순차적 또는 동시적으로 발생할 수 있는 모든 연관된 업무의 집합을 의미한다. 이러한 비즈니스 프로세스는 프로세스 설계 작업을 통하여 시스템 차원에서 관리함으로써 프로세스의 생산성 및 효율성 등을 확대하게 된다. 하지만 프로세스 설계 작업은 주로 사람에 의해 수행되기 때문에 예상하지 못한 오류들이 발생할 수 있게 된다. 이러한 설계 오류들은 기업이 원하는 과정으로 프로세스가 진행하지 않을 수 있으며, 이는 기업의 막대한 인적 손실 및 비용 손실을 초래하게 된다. 그러므로 비즈니스 프로세스 설계 단계에서 오류가 없도록 설계 하거나 또는 미리 정의된 오류 유형들을 설계 도구를 통하여 검출 할 수 있는 작업이 필요하다. 본 논문에서는 비즈니스 프로세스 설계 단계에서의 오류 검출 작업에 활용될 수 있도록 유형 별로 설계 오류들을 분석 하고 정의하였다.

Adaptive Resource Scheduling for Workflows Considering Competence and Preference (적합성과 선호도를 고려한 워크플로우의 적응적 자원 스케줄링)

  • 황경순;이건명
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2004.04a
    • /
    • pp.45-48
    • /
    • 2004
  • 워크플로우는 기업의 업무 프로세스, 이질적 정보 서버들을 통한 정보 처리 등과 같은 잘 정의된 복잡한 프로세스를 수행하기 위해 설계되어 조율된 작업들로 구성된다 워크플로우 스케줄링에서는 부여된 제약조건을 만족하면서 작업을 수행할 수 있는 작업의 실행 순서를 결정한다. 워크플로우를 실행시킬 때, 동시에 하나의 작업을 처리할 수 있는 자원이 여러 개 있을 경우에는, 어떤 자원이 어떤 작업을 수행할지 결정해야하는 자원 스케줄링 상황이 발생한다. 자원 스케줄링을 할 때는, 작업에 대한 자원의 적합도 및 선호도를 반영하는 것이 바람직하다. 한편, 프로세스가 진행되어 감에 따라 작업에 대한 자원의 적합도 및 선호도는 변할 수 있고, 또한 이러한 적합도 및 선호도 정보가 사전에 주어지지 않은 경우도 있다. 이 논문에서는 작업에 대한 자원의 적합도 및 선호도를 모델링하는 방법을 제안하고, 이를 프로세스 진행에 따라 갱신하는 방법을 소개하고, 이를 이용하여 적응적으로 자원 스케줄링하는 방법을 제시한다.

  • PDF

Petri net based ETL Process Modeling (페트리넷 기반의 ETL프로세스 모델링)

  • Jung, Sung-Jae;Choe, Yun-Ho;Hwang, Jongha;Kim, Dong-Hoon;Lee, Hwasik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.10a
    • /
    • pp.1239-1241
    • /
    • 2015
  • ETL(Extraction, Transformation, Loading)작업은 데이터웨어하우스 시스템 구축 및 유지관리 뿐만 아니라 차세대 정보시스템 구축의 핵심 프로세스에 해당한다. 특히 차세대 정보시스템 구축에 있어서 ETL 작업의 성능은 시스템오픈의 성패를 좌우하는 중요한 요소이다. 일반적으로 차세대시스템 구축의 데이터 전환을 위해 수행되는 ETL작업은 대용량데이터에 대한 다양한 형태의 데이터변형 과정을 수반하며 반드시 정해진 시간안에 완료되어야 한다. 또한, 수 많은 원천 집합을 추출하여 타겟시스템의 형태에 맞게 변형 및 적재하는 작업은 한정된 컴퓨팅 자원내에서 수행되어야 한다. 따라서 자원성능을 고려한 ETL작업 스케줄 최적화는 데이터전환 작업에 있어 필수적인 고려사항이 된다. 이 연구에서는 가용한 물리자원을 최대한 활용하여 ETL 프로세스의 처리능(throughput)을 최대화 하는데 초점을 맞추어, ETL프로세스를 페트리넷을 이용해 모델링하는 기법을 제시한다. 이 모델에는 ETL 프로세스가 수행될 서버의 컴퓨팅자원이 토큰화(tokenize)되어 포함된다. 이 모델을 기반으로 가용자원을 최대한 활용하면서도 자원병목이 발생하지 않는 수준으로 ETL 작업이 수행될 수 있도록 프로세스를 제어할 수 있는 방안을 제시한다.

A Study on the Usage of Digital Design Tool on Architectural Design Process (건축 프로세스에서의 Digital Design Tool 활용에 관한 연구)

  • Jeon, Hyun-Woo;Choi, Jong-Chon;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.567-572
    • /
    • 2009
  • 본 연구에서는 국외 설계사무실과 국내 설계사무실의 수행 프로젝트(표1)를 디지털 디자인 프로세스에서의 디지털 도구 활용 사례조사 결과를 일련의 설계 프로세스(기획(Pre-Design), 계획 설계(Schematic Design) 중간설계(Detail Design), 실시설계(Construction Design))를 11개의 설계 단위작업((1)자료수집, (2)도서화작업, (3)의사소통/프레젠테이션, (4)협력업체와의 협업, (5)디자인 실험, (6)디자인분석/유효성 검토, (7)빌딩시스템과 자재선정, (8)자재비교/견적, (9)디자인 발전, (10)RP를 이용한 모델 제작, (11)시공/제작)으로 분류하여(설계프로세스별로 디지털 디자인 툴의 활용 빈도를 조사 분석하는 것은 프로세스별로 중복된 설계 단위작업이 진행됨으로 연구결과의 의미가 잘못 해석될 수 있다.) 그 활용에 대한 유형을 분석하고 이를 바탕으로 설계과정에서의 디지털 디자인 툴의 활용특성을 도출하여 실무설계의 기초자료를 제공하는데 그 목적을 둔다.

  • PDF

Design Anomalies in the Business Process Modeling (비즈니스 프로세스 모델에서의 설계 이상 현상)

  • Kim, Gun-Woo;Lee, Jeong-Wha;Son, Jin-Hyun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.14 no.9
    • /
    • pp.850-863
    • /
    • 2008
  • Business Process is a set of interrelated business functions, which are defined by various business process rule and that will lead a company to accomplishing a specific organizational goal. Many business organizations are using process modeling methods for their business process management, but mostly these methods are accomplished by Human-Based activities. These human-based activities cause unexpected design anomalies in modeling phase. If process engine executed without design anomalies detection, that will be lead to huge loss on costs. To ensure that there is no design anomalies in modeling phase and to detect anomalies of predefined actions within modeling tools are important issues in business process management. In this paper, we provide specific types of design anomalies, which can effectively use to detect design anomalies in business process modeling phase.

Utilization of a Smart Glass for Improving Data Interface During the Earthwork Operation (토공작업의 데이터 교환 개선을 위한 스마트 글래스 활용)

  • Moon, Sungwoo;Moon, Changgon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.167-174
    • /
    • 2017
  • Earthwork is to level or excavate the ground to provide a space for installing structures. A large number of construction equipment such as excavators, dozers, and dump trucks are put into the earthwork operation. The equipment operators need to constantly communicate with each other during the operation. In the earthwork operation, therefore, the process should be analyzed on the equipment operation to improve the effectiveness of communication. The objective of this study is to understand the earthwork process, and improve the effectiveness of data interface by adopting the smart glass technology. In the study, the general process of earthwork is modeled using a process diagram. The data that is generated during the process is modeled using a class diagram. A database is developed to store and reuse the data. The smart glass technology is adopted to develop a data interface during the earthwork operation. The result of the prototype showed that the technology can improve the data interface during excavation overcoming the shortcomings of hand or sound signals.

An Efficient Method for Determining Work Process Number of Each Node on Computation Grid (계산 그리드 상에서 각 노드의 작업 프로세스 수를 결정하기 위한 효율적인 방법)

  • Kim Young-Hak;Cho Soo-Hyun
    • The Journal of the Korea Contents Association
    • /
    • v.5 no.1
    • /
    • pp.189-199
    • /
    • 2005
  • The grid computing is a technique to solve big problems such as a field of scientific technique by sharing the computing power and a big storage space of the numerous computers on the distributed network. The environment of the grid computing is composed with the WAN which has a different performance and a heterogeneous network condition. Therefore, it is more important to reflect heterogeneous performance elements to calculation work. In this paper, we propose an efficient method that decides work process number of each node by considering a network state information. The network state information considers the latency, the bandwidth and latency-bandwidth mixture information. First, using information which was measured, we compute the performance ratio and decide work process number of each node. Finally, RSL file was created automatically based on work process number which was decided, and then accomplishes a work. The network performance information is collected by the NWS. According to experimental results, the method which was considered of network performance information is improved respectively 23%, 31%, and 57%, compared to the methods of existing in a viewpoint of work amount, work process number, and node number.

  • PDF

Design and Implementation of Event Notification System Using E-Mail Service (전자메일 서비스를 이용한 이벤트 알림 시스템의 설계 및 구현)

  • Lee, Seung-Min;Kim, Myoung-Il;Jeong, Hee-Seok;Kim, Jae-Sung;Lee, Sang-Min
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.91-94
    • /
    • 2010
  • 응용 프로그램을 실행할 때 프로세스간의 상호 연동이 필요한 경우 통신을 하게 된다. 프로세스간의 통신에서 서비스를 요청하는 프로세스의 상태에 따라 동기(Blocking) 모드와 비동기(Non-blocking) 모드로 나누어진다. 동기 모드는 서비스를 요청받은 프로세스의 작업이 완료할 때까지 서비스를 요청한 프로세스의 상태가 멈추는 방식이고, 비동기 모드는 다른 프로세스에 서비스를 요청한 후 자신은 다른 유용한 작업을 계속 수행할 수 있는 방식으로 통신 상대가 여럿이거나 서비스 수행시간이 긴 작업의 경우 비동기 모드를 사용한다. 프로세스 간의 비동기적인 작업 수행이 이벤트 기반으로 이루어지도록 지원하는 이벤트 알림 시스템은 전자메일(E-mail) 서비스와 유사한 특징이 있다. 전자메일 서비스는 컴퓨터 통신망을 통해 편지를 주고 받을 수 있는 서비스 및 해당 편지를 일컫는 용어로, 본 논문에서는 이전에 제시된 이벤트 알림 시스템의 구성과 잘 알려진 전자메일 서비스의 특징을 파악하여 전자메일 서비스를 이용한 이벤트 알림 시스템의 설계 및 구현 방법을 제시한다.