1 |
Wang, X. and Dunston, P. S. (2008). "User perspectives on mixed reality tabletop visualization for face-to-face collaborative design review." Automation in Construction, Vol. 17, No. 4, pp. 399-412.
DOI
|
2 |
Woo, J. H. (2014). "Research on the HSE application with smart device and biometrics." Transactions of the Society of CAD/CAM Engineers, Vol. 19, No. 2, pp. 157-168 (in Korean).
DOI
|
3 |
Google (2012). Google Glass Help : Explore Glass Available at: https://support.google.com/glass (Accessed: September 19, 2016).
|
4 |
Kim, B. G., Kim, C. Y. and Kim, H. K. (2012). "Interactive modeler for construction equipment operation using augmented reality." Journal of Computing in Civil Engineering, ASCE, Vol. 26, No. 3, pp. 331-341.
DOI
|
5 |
Kim, K. M. and Kim, K. J. (2009). "Evaluation on efficiency of construction equipment using multi-agent based simulation system." Proceedings of the Korea Institute of Construction Engineering and Management Conference, pp. 61-66 (in Korean).
|
6 |
Kim, S. Y., Kim, H. S., Moon, H. S. and Kang, L. S. (2013). "Field applicability of augmented reality technology by marker mapping for construction project : Focused on Measurement Process of Rebar Work." Journal of the Korean Society of Civil Engineers, Vol. 33, No. 6, pp. 2509-2518 (in Korean).
DOI
|
7 |
Kim, S. K. (2014). "A multi-agent based cooperation system for an intelligent earthwork." Journal of Korean Society of Civil Engineers, Vol. 34, No. 5, pp. 1609-1623 (in Korean).
DOI
|
8 |
Kim, S. K., Kim, G. Y. and Park, J. H. (2015a). "An approach for solid modeling and equipment fleet management towards low-carbon earthwork." Journal of the Korean Society of Civil Engineers, Vol. 35, No. 2, pp. 501-514 (in Korean).
DOI
|
9 |
Kim, S. K., Lim, S. Y. and Park, J. H. (2015b). "A task planning model for human-machine cooperative works in earthwork operations." KSCE 2015 Convention, Guasn, Gsco, pp. 51-52.
|
10 |
Kwon, J. B., Cho, D. G., Cho, H. H. and Kang, K. I. (2012). "Automatic measurement of construction equipment efficiency using a 11-Axis composite sensor." Proceedings of the Spring Conference on Korea Institute of Building Construction, Vol. 12, No. 1, pp. 59-60 (in Korean).
|
11 |
Lee, S. S., Kim, J. H., Kang, S. H. and Seo, J. W. (2008). "Development of task planning system for intelligent excavating system applying heuristics." Journal of Korean Society of Civil Engineers, Vol. 28, No. 6D, pp. 859-869 (in Korean).
|
12 |
Moon, S. W. and Cho, J. S (2015). "Information modeling for construction equipment interface in earthwork." Journal of the Korean Society of Civil Engineers, Vol. 35, No. 3, pp. 699-706 (in Korean).
DOI
|
13 |
Seo, H. B., Jung, W. J., Kim, K. M. and Kim, K. J. (2006). "An analysis on the data distribution of construction equipment operations-A Case on Muck Hauling System-." Journal of the Korean Society of Civil Engineers D, Vol. 26, No. 4D, pp. 661-670 (in Korean).
|