• Title/Summary/Keyword: 작업 순서

Search Result 458, Processing Time 0.038 seconds

The Establishment of the Quality Management Method for Spatial Data Construction Process (공간데이터 제작과정의 품질관리방법 정립에 관한 연구)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Lee, Kwang-Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.3-13
    • /
    • 2005
  • This study aims to establish the quality management method for spatial data construction process. Total 17 regulations related to spatial database construction and major aerial survey firms were analyzed in terms of working process, equipments, accuracy of results. It is standardized the process of making new digital maps using aerial photography, revising existing digital maps, producing digital elevation models and developing imagery maps. Quality checking factors for spatial data construction process are also established.

  • PDF

Line Balanced Assembly Sequence Generation Based on a Verification of Disassemblability and Work Time (분해도 및 작업시간 산정을 통한 균형잡힌 조립공정계획에 관한 연구)

  • Shin, Chul-Kyun
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.24 no.7 s.196
    • /
    • pp.39-48
    • /
    • 2007
  • This paper presents a method of a line balanced assembly sequence generation based on the verification of a disassemblability and a work time. To derive the disassemblability for a part to be disassembled, first we inference collision free assembly directions by extracting separable directions fur the part. And we determine the disassemblability defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed assembly sequence generation provides an effective means of solving the line balancing problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.

Design of VRML based Applications Sharing Engine for Supporting Multi-Participants (다중 참여자를 지원하는 VRML 기반의 어플리케이션 공유 엔진 설계)

  • 이원재;탁진현;이세훈;왕창종
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1999.10c
    • /
    • pp.739-741
    • /
    • 1999
  • 공동작업을 위한 어플리케이션 공유는 여러 시스템에 분산되어 있는 개발도구와 어플리케이션을 공유하여 다수의 참여자가 공간적으로 제약받지 않고 공동 개발할 수 있도록 한다. 그러나 가상공간에 개념을 둔 CSCW에 기존의 어플리케이션 공유 방식을 적용하기에는 3차원이라는 공간적인 요소를 고려하지 않은 문제점을 가지게 된다. 또한 기존의 CSCW에 비해서 가상공간에 기반을 둔 CSCW 어플리케이션 개발은 가상 공간과 다중 참여자를 고려해서 개발하여야 하기 때문에 개발자에게 매우 어려운 작업이다. 따라서, 이 논문에서는 다중 참여자를 지원하는 VRML 기반 어플리케이션 공유 엔진을 설계하였다. 설계된 VRML 기반 어플리케이션 공유 엔진은 참여자 사이트로 에이전트를 이동시켜 웹 브라우져 내의 VRML 가상 공간에서 참여자의 어플리케이션 대한 3차원상의 이벤트를 2차원적인 상대값으로 바꾸고 실제 어플리케이션상의 이벤트로 변환하는 메커니즘을 도입하여 VRML 가상공간에서 어플리케이션을 공유를 가능하게 하였다. 또한 참여자 이벤트를 처리하는 스케줄러를 도입하여 참여자의 이벤트를 순서적이고 참여자 간의 충돌을 해결할 수 있었으며 가상환경이 VRML로 구성되기 때문에 운영체제에 독립적이고 웹상에서 어플리케이션 공유가 가능하였다. 그리고 가상환경을 위한 CSCW 응용 개발에 대한 오버헤드를 줄이고 기존 윈도우 어플리케이션을 가상공간에 사용함으로서 기존 어플리케이션의 재사용성을 높일 수 있었다.

  • PDF

우리나라 자동차부품산업의 전망

  • 배순훈
    • Journal of the KSME
    • /
    • v.25 no.4
    • /
    • pp.266-273
    • /
    • 1985
  • 자동차공업의 미래를 점치는 전문가들은 1980 후반에서 1990년대에 제 4세대의 자동차공업의 핵심은 한국, 멕시코, 브라질을 중심으로 한 저생산요소 요인이 있는 국가에서 생산이 중점적으로 된다는 전망과 유동제조시스템(FMS)을 활용한 지역적으로 안분된 생산체제로 새로운 형태의 경쟁협력 관계가 발생하리라는 예측이 엇갈린다. 유동제조시스템에서 주요역할을 하는 부분은 생산순서를 결정하는 이론인데 현재의 저산기의 논리는 인간의 두뇌에 비교하면 아직 매우 단 순하고 원시적인 편이다. 현재 많은 노력이 경주되는 인공두뇌(artifical intellegence: Al)에 관한 연구에 많은 진전이 있다고 하더라도 당분간은 인간의 두뇌가 기계의 지능보다 월등한 부문이 있는 반면 인간이 활동하기 불편한 작업환경이 있다든가 단순 작업이 되어 인간에 지루함을 주는 일들이 있어 인간과 기계의 적절한 배분으로 적극 기계를 이용하는 자동화도 필요하지만 동시에 인간의 창의적인 능력을 활용하는 것도 매우 필요하다. 우리나라에서 자동차공업이 국제적으로 발전한다면 이는 한국적인 여건에 부합하는 창의적인 인간활동에 의한 것이지 값싼 노임 때문 만은 아닐 것이다.

  • PDF

Heuristic Procedure on Minimizing Makespan for Preemptive Sequence Dependent Job Scheduling with Parallel Identical Machines (일시(一時) 작업중단(作業中斷)을 허용(許容)하는 순서종속작업(順序從屬作業)을 병행기계(並行機械)로서 makespan 최소화(最小化)를 도모(圖謀)하는 발견적(發見的) 방법(方法))

  • Won, Jin-Hui;Kim, Man-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.13 no.2
    • /
    • pp.35-46
    • /
    • 1987
  • To minimize makespan for preemptive sequence dependent job scheduling with parallel identical processors, fundamental results, as the basis of new algorithm to be presented, such as McNauton's algorithm for independent jobs, Hu's characterization for dependent jobs, and Muntz-Coffman's algorithm, were first introduced. Then a huristic procedure was presented applying those concepts of zoning of assembly line balancing and of resource leveling on CPM network scheduling with two or more of parallel machines in general. New procedure has eliminated presumative machine assignment using ${\rho}$, rate of resource capability (${\rho}$ < 1), for practical scheduling.

  • PDF

A Study on Framework for Component-Based Web Applications (컴포넌트 기반 웹 응용 프레임워크에 관한 연구)

  • Kim, Hee-Chern;Na, Jong-Whoa;Jung, Kwang-Ho;Kwon, Chang-Hee;Sin, Seung-Jung;Ryu, Dae-Hyun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.05c
    • /
    • pp.1833-1836
    • /
    • 2003
  • 웹-기반 시스템을 개발하려면 컴포넌트 기반 웹 공학 기술에 관한 연구가 선행되어야 한다. 본 연구는 컴포넌트 기반 웹 공학을 지원하기 위한 개발 프로세스와 방법론에 관한 기초 연구이다 컴포넌트 기반 웹 응용 개발 프레임워크의 개발 방법과 관련하여 이 것의 요구사항과 구성에 관해 연구한다 다음과 같은 작업과 순서로 구성된다. 먼저 웹 공학과 관전된 도메인들을 분석하고 컴포넌트 모델링 작업을 수행한다. 여기에 기초한 컴포넌트 기반 설계 및 웹 응용 설계 연구를 통해 컴포넌트 기반 웹 응용 설계 프레임워크를 정의한다. 다음으로 컴포넌트 기반 설계 패턴 및 응용 패턴 추출 연구와 웹 서비스를 지원하는 프레임워크를 정의하며 컴포넌트 기반 웹 응용 시험 및 검증에 관해 연구한다.

  • PDF

A Sequencing Problem with Generalized Due Dates for Distributed Training of Neural Networks (신경망 분산 학습을 위한 일반 납기를 갖는 시퀀싱 문제)

  • Choi, Byung-Cheon;Min, Yunhong
    • The Journal of Bigdata
    • /
    • v.5 no.1
    • /
    • pp.189-195
    • /
    • 2020
  • We consider the stale problem which makes the training speed slow in the field of deep learning. The problem can be formulated as a single-machine scheduling problem with generalized due dates in which the objective is to minimize the total earliness and tardiness. We show that the problem can be solved in polynomial time if the orders of the small and the large jobs in an optimal schedule are known in advance.

A Workflow-Based Multiagent System for Integrating Bioinformatics Tools (바이오인포매틱스 도구 통합을 위한 워크플로우 기반의 멀티에이전트 시스템)

  • 손봉기;이건명;황경순;김영창
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10b
    • /
    • pp.850-852
    • /
    • 2003
  • 이 논문에서는 여러 가지 도구를 논리적인 순서로 사용함으로써 이루어지는 작업을 워크플로우로 보고, 이러한 관점에서 바이오인포매틱스 도구를 통합하는 새로운 멀티에이전트 시스템을 제안한다. 제안한 시스템은 기존의 도구를 랩퍼 에이전트로 구현하고, 에이전트간의 통신은 XML 형식의 메시지로 이루어진다. 수신 에이전트는 송신 에이전트가 전송하는 정보를 명시적으로 알리지 않고도 메시지로부터 필요한 정보를 추출할 수 있다. 제안한 시스템의 이러한 특징은 바이오인포매틱스 도구와 데이터베이스의 통합을 용이하게 한다. 또한, 제안한 시스템에서는 워크플로우를 여러 가지 제어 구조를 이용하여 정의할 수 있으며. 워크플로우 진행을 모니터링할 수 있는 기능을 제공한다. 제안한 시스템의 가용성을 보이기 위해 박테리아 Sphingomonas Chungbukensis DJ77 의 유전자 주해(gene annotation) 작업에 제안한 시스템을 적용하여 구현하고 있다.

  • PDF

A Dynamic ACK Regeneration Scheme to Improve TCP Performance over Asymmetric Networks (비대칭 망에서 TCP 성능 향상을 위한 동적 응답 패킷 재생성 기법)

  • Ahn, Joon-Chul;Lee, Ji-Hyun;Lim, Kyung-Shik
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07a
    • /
    • pp.562-564
    • /
    • 2005
  • 비대칭 율이 높은 비대칭 망에서 동작하는 TCP의 성능은 상향 링크의 혼잡 발생 여부에 좌우된다. 상향 링크에 실리는 응답 패킷 트래픽이 링크의 대역폭을 넘어서게 되면 응답 패킷이 손실되거나 전송 지연이 길어져서 성능을 저하시킨다. 상향 링크의 혼잡 문제를 해결하는 대표적인 방법으로 응답 패킷 필터링/재생성 기법을 들 수 있다. 본 논문에서는 해당 기법의 문제점을 해결한, 송신측 TCP의 상태에 따라 응답 패킷 재생성 작업을 수행하는 동적 패킷 재생성 기법을 제안한다. 이 기법은 정확한 응답 패킷을 재생성하고, 이를 순서 뒤바뀜 없이 송신측에 전송하도록 하여 혼잡 제어 구간에서의 성능을 향상시킨다. 또, TCP가 혼잡 제어 상태에 있는 동안에만 응답 패킷 재생성 작업을 수행하도록 하여 불필요한 응답 패킷 트래픽과 패킷 재생성에 드는 부하를 줄인다.

  • PDF

A Tabu Search Algorithm for Single Machine Scheduling Problem with Job Release Times and Sequence - dependent Setup Times (작업 투입시점과 순서 의존적인 작업준비시간이 존재하는 단일 기계 일정계획 수립을 위한 Tabu Search)

  • Shin, Hyun-Joon;Kim, Sung-Shick;Ko, Kyoung-Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.2
    • /
    • pp.158-168
    • /
    • 2001
  • We present a tabu search (TS) algorithm to minimize maximum lateness on a single machine in the presence of sequence dependent setup times and dynamic job arrivals. The TS algorithm starts with a feasible schedule generated by a modified ATCS (Apparent Tardiness Cost with Setups) rule, then through a series of search steps it improves the initial schedule. Results of extensive computational experiments show that the TS algorithm significantly outperforms a well-known RHP heuristic by Ovacik and Uzsoy, both on the solutions quality and the computation time. The performance advantage is particularly pronounced when there is high competition among jobs for machine capacity.

  • PDF