• Title/Summary/Keyword: 작업 소요시간 산정

Search Result 25, Processing Time 0.035 seconds

River Fractal Analysis and Modified GCUH Development for Korean Mountain Regions (한국 산악지역 Fractal 특성 분석과 수정 GCUH 개발 연구)

  • Shin, Hyun-Suk;Shon, Tae-Seok;Kim, Hong-Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.737-742
    • /
    • 2005
  • 본 연구는 GIUH(Geomorphologic Instantaneous Unit Hydrograph) 매개변수와 유역의 지 형특성 인자인 유역면적, 유로연장, 유로경사의 상관성을 분석하여 유역면적과 유로연장의 GIUH 매개변수와의 상관식을 유도하였다. 그리고 대상유역의 Fractal분석도 실시하여 지형상사를 확인하였다. 상관식의 검증을 위해 설마천 유역을 선정하여 결과를 실측치를 계산치와 수정치로 비교하고 계산치와 수정치도 비교하였다. 본 연구의 결과로 산정된 상관식을 사용하여 임의의 미계측 유역의 GIUH매개변수를 산정할 경우 기존의 복잡하고 시간이 많이 소요되는 GIS작업의 번거로움을 최소화할 수 있을 것이다.

  • PDF

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

Research on the Application of AI Techniques to Advance Dam Operation (댐 운영 고도화를 위한 AI 기법 적용 연구)

  • Choi, Hyun Gu;Jeong, Seok Il;Park, Jin Yong;Kwon, E Jae;Lee, Jun Yeol
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.387-387
    • /
    • 2022
  • 기존 홍수기시 댐 운영은 예측 강우와 실시간 관측 강우를 이용하여 댐 운영 모형을 수행하며, 예측 결과에 따라 의사결정 및 댐 운영을 실시하게 된다. 하지만 이 과정에서 반복적인 분석이 필요하며, 댐 운영 모형 수행자의 경험에 따라 예측 결과가 달라져서 반복작업에 대한 자동화, 모형 수행자에 따라 달라지지 않는 예측 결과의 일반화가 필요한 상황이다. 이에 댐 운영 모형에 AI 기법을 적용하여, 다양한 강우 상황에 따른 자동 예측 및 모형 결과의 일반화를 구현하고자 하였다. 이를 위해 수자원 분야에 적용된 국내외 129개 연구논문에서 사용된 딥러닝 기법의 활용성을 분석하였으며, 다양한 수자원 분야 AI 적용 사례 중에서 댐 운영 예측 모형에 적용한 사례는 없었지만 유사한 분야로는 장기 저수지 운영 예측과 댐 상·하류 수위, 유량 예측이 있었다. 수자원의 시계열 자료 활용을 위해서는 Long-Short Term Memory(LSTM) 기법의 적용 활용성이 높은 것으로 분석되었다. 댐 운영 모형에서 AI 적용은 2개 분야에서 진행하였다. 기존 강우관측소의 관측 강우를 활용하여 강우의 패턴분석을 수행하는 과정과, 강우에서 댐 유입량 산정시 매개변수 최적화 분야에 적용하였다. 강우 패턴분석에서는 유사한 표본끼리 묶음을 생성하는 K-means 클러스터링 알고리즘과 시계열 데이터의 유사도 분석 방법인 Dynamic Time Warping을 결합하여 적용하였다. 강우 패턴분석을 통해서 지점별로 월별, 태풍 및 장마기간에 가장 많이 관측되었던 강우 패턴을 제시하며, 이를 모형에서 직접적으로 활용할 수 있도록 구성하였다. 강우에서 댐 유입량을 산정시 활용되는 매개변수 최적화를 위해서는 3층의 Multi-Layer LSTM 기법과 경사하강법을 적용하였다. 매개변수 최적화에 적용되는 매개변수는 중권역별 8개이며, 매개변수 최적화 과정을 통해 산정되는 결과물은 실측값과 오차가 제일 적은 유량(유입량)이 된다. 댐 운영 모형에 AI 기법을 적용한 결과 기존 반복작업에 대한 자동화는 이뤘으며, 댐 운영에 따른 상·하류 제약사항 표출 기능을 추가하여 의사결정에 소요되는 시간도 많이 줄일 수 있었다. 하지만, 매개변수 최적화 부분에서 기존 댐운영 모형에 적용되어 있는 고전적인 매개변수 추정기법보다 추정시간이 오래 소요되며, 매개변수 추정결과의 일반화가 이뤄지지 않아 이 부분에 대한 추가적인 연구가 필요하다.

  • PDF

Real Time SW Sizing Model for FP-Based Fintech Software Development Project (FP 기반의 핀테크 소프트웨어 개발 프로젝트 실시간 규모 산정 모델)

  • Koo, Kyung-Mo;Yoon, Byung-Un;Kim, Dong-Hyun
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.10
    • /
    • pp.36-44
    • /
    • 2021
  • Estimation on SW Sizing applied to fintech is very difficult, a task requiring long time, it is difficult for client companies and developer companies to accurately calculate the size of software development. The size is generally estimated based on the experience of project managers and the general functional scoring method. In this paper, propose a model that can be applied to fintech development projects by quantitatively calculating the required functions from the user's point of view, measuring the scale, and calculating the scale in real time. Through the proposed model, the amount of work can be estimated prior to development and the size can be measured, and the M/M and the estimated quotation amount can be calculated based on the program list by each layer. In future studies, by securing size computation data on existing the Fintech Project in mass, research on accurate size computation would be required.

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

A Comparative Study on Productivity Analysis of Automated Pavement Crack Sealing Machines (도로면 크랙실링 자동화 장비의 작업 생산성 분석에 관한 비교 연구)

  • Seo, Won-Jung;Yoo, Hyun-Seok;Kim, Young-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1289-1298
    • /
    • 2014
  • Pavement crack sealing method, which is one of the methods to maintain and repair the road, prevents the extending of cracks by repairing cracks in its early occurrence and has already been applied to many roadworks in advanced foreign country for a long time. But in the conventional crack sealing method, traffic accidents occur frequently during the repair because it's commonly performed on the heavy traffic road or highway. It also has some difficulties in securing the safety of workers from the risk of burns caused by heated sealant. In an effort to solve these problems, automated pavement crack sealing machines such as ARMM, OCCSM, TTLS have been developed in advanced foreign country since early 1990s. Also APCS in 2004 and ACSTM in 2013 were already developed domestically. However, since these automated crack sealers developed from a number of research institutions have different test-bed conditions and productivity measurement models, it's difficult to compare and evaluate them objectively. In this study, the image processing time of the respective machines and the movement time of each motion on the work process were estimated by using fully autonomous mapping and semi-automatic mapping in order to measure the productivity in the same environmental conditions. In addition, the productivity measurement test-bed reflected domestic road characteristics was designed to estimate and compare the productivity of the automated crack sealing machines.

Analysis of Potential Flood Damage and Damage Priority Using Flood Hazard Map in Nakdong River Basin (낙동강권역 홍수위험지도를 이용한 홍수피해잠재성 및 피해 우선순위 분석)

  • Kim, Ji-Sung;Oh, Kuk Ryul;Lee, Jae Yeong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.375-375
    • /
    • 2020
  • 우리나라는 현재 개발되어 적용되고 있는 홍수피해잠재능(Potential Flood Damage, PFD) 산정방법은 잠재성요소(인구, 자산, 사회기반시설, 도시화율)와 위험성요소(홍수피해액, 확률강우량, 외수방어능력, 댐 및 저수지, 내수방어능력)로 산정 후 지역평가를 통해 그룹(A,B,C,D)별로 평가하고 있다. 하지만, 홍수피해잠재능(PFD) 산정인자가 많아 자료조사 및 구축에 많은 시간이 소요 되며, 인자별 다양한 공간적 범위로 인해 실무 적용에 어려움이 있다. 또한, 소구역 단위 평가로 인해 하천의 침투 특성을 반영하지 못하여 하천 주변의 중요도 평가가 미흡한 실정이다. 이를 위해 본 연구에서는 중요도 분석 인자 단순화를 통해 자료 조사 및 구축 시간 단축과 더블어 위험성요소를 내포하는 홍수위험지도 사용을 통해 작업을 간소화하고, 하천 주변까지 고려하여 중요도 평가하는데 목적이 있다. 본 연구에서는 낙동강권역을 대상으로 홍수위험지도 및 중요도 분석 인자(인구, 자산(공시지가), 시회기반시설(도로,철도), 도시화율(시가화지역)) 공간정보를 구축하였고, 점수할당법에 의한 인자별 중요도 분석 및 상관성 분석을 통해 피해우선순위를 분석하였다. 분석결과, 인구·자산(공시지가) 인자가 높은 구역이 대체로 사회기반시설 연장 및 도시화 면적이 높게 나타났으며, 하천의 치수단위 구역별 중요도 분석시 인구·자산(공시지가) 두가지의 인자로도 치수안전도 결정에 활용이 가능할 것으로 판단된다.

  • PDF

An Application of VRS-RTK Surveying in Construction Site (건설현장에서의 VRS-RTK측량 적용성 검토)

  • Kim, In-Seup;Joo, Hyun-Seung
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.625-631
    • /
    • 2008
  • Correct evaluation of cut and fill volume of soil is one of the most important factors which controls construction cost in enormous construction sites. To achieve accurate computation of soil volume in construction site precise surveying is required, however most of construction sites adopt existing optical surveying instruments such as Total Station. The problem when using these optical instruments in construction sites is that these instruments take longer time in data acquisition. Due to insufficiency of computation time accurate and precise observation cannot be accomplished with these equipments. As a result roughly calculated earthwork volume may cause arguments between contractors and supervisors in the matter of reduction or increasement of total construction cost. In this study VRS-RTK Surveying is adopted to perform fast and accurate in-situ surveying for rapid computation of soil volume. This VRS-RTK Surveying system is proved to have more accurate three dimensional coordinates with high density and better economical solution with less manpower.

Temporal and Spatial Analysis of Extended Sewer Surcharge on Anyangcheon Watershed Using PCSWMM (PCSWMM 모형을 이용한 안양천 유역에서 내수침수의 시간적.공간적 해석)

  • Lee, Kil-Seong;Kim, Sung-Eun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1150-1155
    • /
    • 2006
  • 대부분의 도시지역은 불투수면적 비율이 상당히 높은 특징으로 인한 유출용적 및 첨두유출량의 증가와 외수위보다 낮은 지반고의 지형학적 특징으로 인한 내수배제의 불량으로, 저지대의 침수위험도가 상당히 높다. 이러한 이유로, 빈도별 설계홍수량을 산정하여 침수위험지역을 파악하고 관리하는 공간적인 치수관리가 이루어지고 있지만, 효율적인 치수관리를 위해서는 공간적인 측면뿐 아니라, 침수위험지역 내 침수발생의 시간적인 측면도 고려하는 것이 필요하다. 본 연구에서는 침수위험지역 내 내수침수발생에 대하여 공간적.시간적으로 살펴보고, 내수침수발생 위험지역 및 우선관리지역을 선정하였다. 대상유역으로는 안양천 유역에서 대부분의 침수가 발생하는 서울시에 포함된 안양천 하류유역으로 하였다. 서울시에 포함된 안양천 하류지역에서 내수침수발생의 주원인으로는 외수위보다 낮은 지반고와 배수계통의 통수능력 부족으로 나타나고 있어, 이들 지역의 침수위험지역을 파악하기 위해 하도 및 관거의 유출해석에 우수한 SWMM 모형의 EXTRAN block을 이용하여 모의를 실시하고 맨홀이 월류되는 지역을 내수침수 위험지역으로 선정하였다. 각 빈도별 지속시간별 모의결과, 목감천 하류부의 고척 1동, 신월 1동, 화곡 2동, 도림천과 봉천천, 대방천이 만나는 구로동, 대림 1동, 대방동에서 침수가 발생하기 시작하였다. 이들 지역은 또한 10년에서 30년 빈도별 모의에서도 모두 침수위험이 높은 지역으로 선정되어, 우선관리지역으로 선정하였다. 우선관리지역의 선정은 홍수예.경보 측면에서는 주민의 신속한 대피와 같은 홍수대처능력과 치수관리측면에서는 소요되는 자원의 효율적 배분을 기대할 수 있을 것으로 판단된다. 대상으로 홍수범람모의시스템을 구축하여 분석결과를 피해지역주민 및 관련기관 실무자들에게 제공함으로써 시간과 공간에 구애받지 않는 재해관리와 신속한 재해 상황 대처가 가능해 질 것으로 사료된다.는 또 다른 형태의 주제도라고 볼 수 있으며, 이를 구축하기 위해서는 자료변환 및 가공이 필요하다. 즉, 각 상습침수지구에 필요한 지형도는 국립지리원에서 제작된 1:5,000 수치지형도가 있으나 이는 자료가 방대하고 상습침수지구에 필요하지 않은 자료들을 많이 포함하고 있으므로 상습침수지구의 데이터를 인터넷을 통해 서비스하기 위해서는 많은 불필요한 레이어의 삭제, 서비스 속도를 고려한 데이터의 일반화작업, 지도의 축소.확대 등 자료제공 방식에 따른 작업 그리고 가시성을 고려한 심볼 및 색채 디자인 등의 작업이 수반되어야 하며, 이들을 고려한 인터넷용 GIS기본도를 신규 제작한다. 상습침수지구와 관련된 각종 GIS데이타와 각 기관이 보유하고 있는 공공정보 가운데 공간정보와 연계되어야 하는 자료를 인터넷 GIS를 이용하여 효율적으로 관리하기 위해서는 단계별 구축전략이 필요하다. 따라서 본 논문에서는 인터넷 GIS를 이용하여 상습침수구역관련 정보를 검색, 처리 및 분석할 수 있는 상습침수 구역 종합정보화 시스템을 구축토록 하였다.N, 항목에서 보 상류가 높게 나타났으나, 철거되지 않은 검전보나 안양대교보에 비해 그 차이가 크지 않은 것으로 나타났다.의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상

  • PDF

A Study on Flood Hazard Value and Flood Risk Map (홍수 위험지표 및 위험도 작성에 관한 연구)

  • Kim, Jeong-Yup;Jung, Dae-Jin;Bok, Jeong-Su;Cho, Hyo-Seob;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1156-1160
    • /
    • 2006
  • 본 연구는 빈도별 수문조건하의 2차원 수리해석모형(FLUMEN) 결과를 제공받아 빈도별 침수범람 등을 분석하고, 이로부터 도출되는 침수면적, 최대침수심, 최대유속 등의 특성정보를 이용하여 침수심보다 상대적으로 홍수 위험에 대한 척도를 나타내어 줄 수 있는 홍수 강도(Flood Intensity) 개념을 도입하여 대상유역에 적합한 홍수 위험지표(Flood Hazard Value) 및 홍수 위험도(Flood Risk Map)를 작성하고자 하였다. 본 연구의 대상지역은 안성천 중류부의 평택시 6개동을 포함하는 약 $12.6km^2$의 대상지역으로 2차원 수리해석모형(FLUMEN)의 분석한 시간별 침수심(Flow Depth), 최대침수심과 최대 유속 등의 결과를 ASCII파일의 XYZ값 형태로 제공받아 ArcGis 등을 이용하여 Point Coverage를 만들고, 이로부터 TIN (Triangulated Irregular Network)작업을 수행한 후 대상지역의 최대 침수심도 및 최대 유속분포도 등을 작성하였다. 그리고, 침수예상도 등으로부터 얻어진 침수면적, 최대 침수심, 최대유속 등을 분석하여 침수심과 유속의 함수로 홍수강도를 정의하고 홍수강도와 홍수발생확률의 곱으로 위험지표를 산정하였고, 산정된 홍수 위험지표를 적용하여 홍수 위험도를 작성하였다. 본 연구로부터 도출되는 홍수 위험지표 및 홍수 위험도는 홍수범람에 의한 인명피해 및 재산손실과 이에 대한 복구 및 구호활동에 소요되는 노력 등의 여러 가지 사회..경제적 역기능을 방지하고자 홍수에 의한 침수특성을 이해하고 홍수에 대비한 적절한 홍수방어대책 수립시의 지원 정보로 제공되어 활용될 수 있다.

  • PDF