A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.

선삭공정의 작업준비계획의 자동화

  • 조규갑;김인호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1992.04b
    • /
    • pp.237-246
    • /
    • 1992
  • 본 연구는 선삭공정에서 CAD 인터페이스된 자동공정계획시스템개발에 관한 연구의 계속으로 작업준비계획(Setup Planning)을 자동적으로 수행하는 기법을 개발함이 주된 목적이다. 연구의 대상은 기계가공부품들 중 많은 비중을 차지하는 NC선반가공용 회전형상부품을 대상으로 하였다. 연구의 내용은 공작물고정방법의 결정, 작업준비횟수의 결정, 클램핑(Clamping)면 및 공작물고정구의 선정에 관한 기법과 알고리즘을 개발하였으며, 소프트웨어는 개인용 컴퓨터를 이용하여 Turbo-C(Version 2.0)를 사용하여 개발하였고, 사례연구를 통하여 개발된 시스템의 유효성을 평가하였다.

  • PDF

Developing a Work Procedure for Efficient Map Generalization (효율적인 일반화 자료처리를 위한 작업공정 개발)

  • Choi, Seok-Keun;Kim, Myung-Ho;Hwang, Chang-Sup
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.6 no.3
    • /
    • pp.73-82
    • /
    • 2003
  • This paper proposes a work procedure for generalizing large-scale digital maps ver. 2.0(1/5,000) into a small-scale digital map(1/25,000). Unlike a existent digital map, the digital map ver. 2.0 has a variety of attribute data as well as graphic data. To perform an efficient map generalization with these structural properties, we establish a work procedure as follow; firstly, delete layers which don't exist in small-scale digital map's feature code, and secondly, generalize features which have been classified into 8 layers, and finally merge 8 layers which have been generalized into 1 layer. Therefore, we expect that a work procedure which is proposed in this paper will play a fundamental role in automated generalization system and will contribute to small-scale digital mapping and thematic mapping.

  • PDF

치구계획의 자동화시스템 개발

  • 조규갑;정영득
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1991.11a
    • /
    • pp.202-206
    • /
    • 1991
  • 공정계획(process planning)은 제품설계를 완료한 다음에 계획된 제품을 생산하기 위한 소재의 변환과정에 대한 계획으로 전체적인 생산공정에 관한 거시적 의사결정 단계인 공정설계(process design) 단계와 각공정의 포함된 구체적인 작업에 관한 미시적 의사결정단계인 작업설계(operation design) 단계를 포함한다.(중략)

  • PDF

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Development of Scheduling and Operation system for multi-manufacturing line of the assembly parts (조립부품 다중 제작라인의 일정계획 및 운영 시스템 개발)

  • Lee, Sang-Hyeop;Min, Sang-Gyu;Lee, Byeong-Yeol;Ha, Jae-Tae;Lee, Won-Tae;Jo, Jeong-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.425-428
    • /
    • 2005
  • 본 연구는 건설장비 차량 조립부품을 제작하는 가공공장의 계획 및 운영 시스템 개발에 대한 내용이다. 연구의 대상은 건설장비 차량인 굴삭기, 휠로더, 지게차의 조립부품을 제작하는 공장으로 제작품별 제작라인이 구성되어 있다. 그리고 각 제작라인에는 여러 개의 공정이 있으며, 일부 공정은 작업자에 의해 작업이 이루어지고, 용접 및 가공 등은 자동화된 장비 및 설비에 의해 작업이 된다. 가공공장에서 관리 및 운영의 주요 관점은 이후 공정인 조립공장의 조립 착수일에 늦지 않게 제작된 부품을 공급하는 것이다. 그리고 공장 자체적으로 제작라인 내의 재공재고 감소, 작업일간 작업부하평준화, 자동화 장비 및 설비의 효율 극대화 등이 공장의 주요 관리 사항이다. 따라서 본 연구에서는 가공공장에서 제작되는 조립부품의 납기일 준수, 재고 감소, 부하 평준화, 장비효율의 극대화를 위해 공장을 체계적으로 관리하기 위한 계획 및 운영 시스템을 개발하였다. 개발시스템에는 제작라인별 제작 착수 및 자재발주${\cdot}$입고 관리, 공정별 실적관리, 실시간 작업 진행 관리, 용접 불량 관리 기능 등이 있다. 시스템은 MSSQL 서버, 오라클과 Visual Basic, Visual C# ASP로 개발되었다.

  • PDF

금형공장에 있어서의 수주 Simulation

  • 강무진;김영기;이무성;도성희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1993.04b
    • /
    • pp.252-256
    • /
    • 1993
  • 제조업으로서의 금형공장은 수주에서부터 출하까지의 과정에 금형설계와 공정설계및 가공계획, 그리고 금형제조 등 여러 기능을 표함한다. 금형제조는 다시 작업 일정의 계획, 작업지시, 작업현황의 모니터링 및 실적관리 등으로 이루어진다. 금형제작에 필요한 이들 각 기능간에는 일련의 생산정보가 생성, 전달 및 이용되며 서로 영향을 주는 상호종속관계 (Interdependency)가 존재한다. 금형의 주문 은 납기 및 제품도와 함게 주어지는 금형제작 의뢰로부터 시작된다. 금형제작의 의뢰가 들어오면, 우선적 으로 주문자가 요구하는 납기일과 현재의작업부하 및 생산능력을 토대로 그 주문을 받을 수 있는 지에 대한 수주 타당성 검토가 이루어져야 한다. 이와 함께 수주 담당부서에서는 원가견적을 산출하여 수주을 받을 것인가에 대한 가.부를 결정한다. 수주가 확정되면, 수주 검토단계에서 금형을 구성하는 주요부품 (Cntical Parts)들에 대해 수립된 대일정 계획에맞추어 설계가 시작된다.금형설계과에서는 주어진 제품도를 토대로 금형설계도를 작성하고, 금형설계가완료되는 대로각 부품의 제조에 필요한 공정 및 그 순서, 그리고 각 공정에 소요되는 공수, 가공조건 등을 결정하는 공정설계가 이루어진다.

Study of Digital Double Data Processing (디지털더블의 데이터 처리 공정 연구)

  • Gu, Jie;Choi, Chul-Young
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2018.05a
    • /
    • pp.413-414
    • /
    • 2018
  • 사실적인 배우의 연기를 데이터로 추출하기 위해 모션캡쳐라는 장비를 이용하는데 추출된 데이터는 여전히 많은 후수정이 필요로 하고 있다. 모션의 보정이나 떨림, 그리고 디테일 수정 외에도 캐릭터들이 가방을 메거나, 물건을 들었다 놨다하는 경우에 모션 데이터들은 오브젝트들과의 실감나는 접촉을 만들기 위해 애니메이팅과 리깅의 작업이 필요하다. 또한 작업물이 게임엔진과 같은 타 소프트웨어로의 이동이 필요한 경우가 많아 작업공정이 복잡하게 되고 있다. 이는 상대적으로 모션캡쳐 데이터를 처리할 수 있는 업체들이 줄어들게 만드는 원인이 되고 있어 최근의 세계적인 영상콘텐츠 시장의 상황과는 대조적인 현상이라 할 수 있다. 이에 사실적인 디지털더블의 구현을 위한 모션캡쳐 데이터 처리 공정을 사례를 통해 효율적인 공정을 제시해보고 현 상황을 분석해 보려하였다.

  • PDF

A Study on the Analysis of Hazardous Factors in the Work Environment and Special Health Diagnosis according to the Analysis of Hazardous Factors by Construction Type in General Construction Projects (일반건축공사의 공종별 유해요인 분석에 따른 작업환경측정 및 특수건강진단 유해요인 분석에 관한 연구)

  • Son, Seo-Hyeong
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.175-176
    • /
    • 2022
  • 본 연구에서는 건축공사의 공정별 공정내용을 파악하고 그에 따라 발생하는 각종 유해요인을 분석하여 공정별 유해요인에 따른 작업환경측정대상과 특수건강진단의 정확한 진단항목 대상을 분석한다. 이를 통한 유해 공정에 따른 정확한 유해요인인자의 파악을 통해 작업환경측정 및 특수건강진단을 유해인자별 정기적으로(산업안전보건법 시행규칙 별표23 특수건강진단의 시기 및 주기를 참조)실시한다면 유해 인자에 따라 표적 추적 검사를 통해 보다 유의한 결과를 측정 가능하며 도출된 결과로 관리적, 공학적, 개인적 개선대책을 세워 관리한다면 직업성 질병을 예방하고, 쾌적한 작업환경을 조성하여 근로자의 안전과 보건을 유지증진 할 것으로 판단되었다. 또한 정기적인 특수건강진단으로 직업성 질병의 예방 및 조기발견으로 사후조치를 적절히 하여 근로자 건강 보호와 노동 생산성 향상을 기대할 수 있을 것으로 기대된다.

  • PDF

Incompatible Batch Scheduling with Setup Time (공정 교체 시간을 고려한 배치작업의 일정관리)

  • 김주일;이영훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.103-106
    • /
    • 2000
  • 본 논문은 작업이 공정시간 등의 특성으로 인해 Family 로 구분되어지고 동일한 Family 내의 작업끼리만 배치로 구성할 수 있는 제조환경에서의 스케줄링에 관한 연구이다. 이때 배치의 최대크기는 정해져 있어 그 이하의 수로 구성된 작업들로 하나의 배치를 구성할 수 있다. 동일 Family 내의 작업은 작업시간이 동일하고 배치로 구성된 작업이 진행될 때 수에 관계없이 하나의 작업에 소요되는 시간과 동일한 시간이 소요된다. 또한 다른 Family 와의 작업이 이어질 때는 교제시간이 발생한다. 목적함수는 전체지연 시간을 최소화하는 것이며 납기는 동일한 Family 에 있는 작업일지라도 각 작업별로 주어진다. 이 목적함수의 최적해를 구할 수 있는 동적계획법을 제시하고 이를 응용한 발견적 기법을 개발, 적용하여 각각 성능비교를 실시하였다.