• Title/Summary/Keyword: 작업계획

Search Result 1,428, Processing Time 0.033 seconds

Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

Remarshalling Planning for Multiple Automated Yard Cranes Considering Slack Time (여유시간을 고려한 다수 자동화 야드 크레인의 이적작업 일정계획)

  • Park, Young-Man
    • Journal of Navigation and Port Research
    • /
    • v.41 no.3
    • /
    • pp.149-154
    • /
    • 2017
  • Recently, container terminal operators have made efforts to develop an efficient remarshalling plan in response to the increase in automation of equipment handling and transport of containers in the terminals. Usually, containers are handled by multiple AYCs(automated yard cranes) in-yard in an automated container terminal, and terminal operators establish a remarshalling plan using slack time to increase the efficiency of ship operation. This study develops the optimal mathematical model through mixed integer programming as a solution to the problem of dispatching multiple AYCs. Considering the difficulty of direct application to the field due to computation time, we analyze the five prototypical dispatching rules for real world adaptation. A numerical experiment found that the maximum weight ratio (MR) rule and the maximum weight (MW) rule are the ideal dispatching solutions to the multiple AYCs dispatching problem.

Development of a Work Information Model and a Work Path Simulator for an Intelligent Excavation (지능형 굴삭을 위한 작업정보모델 및 작업경로 시뮬레이터 개발)

  • Kim, Sung-Keun;Min, Sung-Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.259-267
    • /
    • 2012
  • The development of construction automation systems is proposed as a potent solution to the difficulties encountered by the construction industry and the preparation for the rapidly changing construction environment. A research concerning an intelligent excavation system has taken place since 2006. The intelligent excavation system has several functions for environment sensing, 3D site modeling, work planning, work path generation, unmaned control, and information management. This paper presents a space information model and a work path simulator for work planning and work path generation which is one of key technologies required to apply the earthwork system to the real world. A data structure for an earthwork site is suggested. It overcomes the limitations of previous data structures such as Quadtree and Octree. The work path simulator can generate an effective work path with considering information on work environment, equipment and operator's heuristic. The work path generated by the simulator is compared with that suggested by human operators.

학습을 통한 공작기계부품의 가공방법 및 가공공구 결정에 관한 연구

  • 이충수;노형민
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.198-207
    • /
    • 1994
  • 공작기계부품 가공을 위한 공정표는 가공공정, 공정별 도면 분할, 가공기계 등을 결정하는 공정계획과 한 공정에 대하여 가공방법, 가공공구, 절삭조건, 공수등을 결정하는 작업계획을 통하여 발행된다. 작업계획에서 가공방법과 가공공구의 결정은 절삭조건과 공수에 영향을 주는 중요한 요소이다. 기존의 연구에서는 가공방법과 가공공구를 결정하기 위해 전문가 시스템 쉘(expert system shell)이용한 사례가 많았다. 이 경우, 지식 베이스(knowledge base) 의 구축에 많은 시간이 소요되고, 지식이 변했을 때 수정의 어려움이 있다. 본 연구에서는 표준화되지 않아 변경의 소지가 많은 가공방법과 가공공구 결정에 뉴럴 네트워크(neural network)의 한 종류인 백 프로퍼게이션 (back propagation) 학습 모델을 이용했다. 공정계획 후 분할된 공정별 도면으로부 터 크기 및 정밀도 등과 같은 특징형상(feature) 정보를 추출한 후, 특징형상 의 종류와 크기, 치수공차, 기하공차, 거칠기 등을 입력하여 가공방법 및 가 공공구가 출력되도록 학습패턴을 설정하여 학습시켰다. 학습패턴은 공정설계 전문가와 인터뷰하는 방법과 작업계획 과정을 분석하는 방법을 통하여 설정 했다. 백 프로퍼게이션 모델을 통하여 학습시킨 결과, 학습시킨대로 정확한 가공방법 및 가공공구를 결정할 수 있었다.

A Quay Crane Scheduling Method Considering Congestions in the Yard of Container Terminals (컨테이너 터미널에서 장치장 현황정보를 고려한 안벽크레인 일정계획 방법)

  • Jeong Da-Hun;Park Yeong-Man;Lee Byeong-Gwon;Ryu Gwang-Ryeol;Kim Gap-Hwan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1178-1185
    • /
    • 2006
  • 컨테이너 터미널에서의 생산성은 본선작업의 효율성과 밀접한 관련이 있다. 효율적인 본선작업을 위한 첫 번째 단계는 선석에서 컨테이너를 취급하는 장비인 안벽크레인(Quay Crane : QC)에 대하여 효율적인 작업일정계획을 수립하는 것이다. 일반적으로 안벽크레인의 작업일정계획은 선박내의 장치계획에 관한 정보와 장치장의 장치현황정보등 많은 정보를 활용해야 하며, 선박의 안정성과 크레인의 작업용이성 등 다양한 제약사항을 고려하여야 한다. 따라서 본 연구에서는 인공지능기법 중 최적에 가까운 해를 찾아주는 탐색기법인 GRASP(Greedy Randomized Adaptive Search Procedure)를 적용하여 실제 현장에서 적용 가능한 안벽크레인 작업일정계획기법을 제안하였다. 또한, 컨테이너 터미널의 실제 자료를 수집하여 제안된 메타휴리스틱 알고리즘의 성능을 분석하였다.

  • PDF

Assignment and Operation Sequencing for Remarshalling of a Vertical Yard Block in Automated Container Terminals (자동화 컨테이너 터미널에서 수직형 블록의 이적작업을 위한 할당 및 작업순서)

  • Bae Jong-Wook;Park Young-Man;Kim Kap-Hwan
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.457-464
    • /
    • 2006
  • Remarshalling operation is one of the operations considered important in an automated container terminal to perform quickly loading operations and delivery operations. It arranges the containers scattered at a verticla yard block in order to reduce the transfer time and the rehandling time of ATC(Automated Transfer Crane)s. This paper deals with the remarshalling planning problem minimizing the weighted operation time. This problem can be decomposed into 2 subproblems, storage space assignment problem and operation sequencing problem Storage space assignment problem decides to where containers are transported in terms of transportation time cost.. With results of a previous subproblem, operation sequence problem determines the ATC operation sequence, which minimizes the dead-heading of ATC This study formulates each subproblem with mixed integer program and dynamic program. To illustrate the proposed model, we propose an instance to explain the process of remarshalling planning.

Periodic Scheduling Problem on Parallel Machines (병렬설비를 위한 주기적 일정계획)

  • Joo, Un Gi
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.12
    • /
    • pp.124-132
    • /
    • 2019
  • Scheduling problems can be classified into offline and online ones. This paper considers an online scheduling problem to minimize makespan on the identical parallel machines. For dynamically arrived jobs with their ready times, we show that the sequencing order according to the ERD (Earliest Ready Date) rule is optimal to minimize makespan. This paper suggests an algorithm by using the MIP(Mixed Integer Programming) formulation periodically to find a good periodic schedule and evaluates the required computational time and resulted makespan of the algorithm. The comparition with an offline scheduling shows our algorithm makes the schedule very fast and the makespan can be reduced as the period time reduction, so we can conclude that our algorithm is useful for scheduling the jobs under online environment even though the number of jobs and machines is large. We expect that the algorithm is invaluable one to find good schedules for the smart factory and online scheduler using the blockchain mechanism.

Review on the Working Hours of Radiation Work Plan for ECT through In-service Inspection (원전 가동중 ECT 검사 방사선 작업시간 고찰)

  • Chae, Gyung-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.

Integrating BDI Executive with Task Planner to Control Intelligent Robots (지능 로봇 제어를 위한 BDI 기반의 계획 실행기와 작업 계획기의 연동)

  • Kim Ha-bin;Kim In-Cheol
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.766-768
    • /
    • 2005
  • 본 논문에서는 지능 로봇의 효율적인 제어를 위해 BDI기반의 계획 실행기와 작업 계획기간의 연동방식을 제안한다. 이를 위해 본 논문에서는 먼저 작업 계획기와 실행기의 대표적인 유형들을 살펴본 다음, BDI 기반의 계획 실행기에 별도의 작업 계획기를 연동함으로써 얻을 수 있는 잇점과 연동방식 등을 차례대로 설명한다. 끝으로 가상환경을 이용한 데모시스템 구현을 통해 심부름 서비스 로봇 제어를 위한 두 서브시스템간의 연동효과를 점검해본다.

  • PDF

Study on Constraints Analysis Classification for PPC Improvement (작업계획달성률 향상을 위한 작업제반요건 분류에 관한 연구)

  • Han, Jung-Hun;Kim, Dea-Young;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.252-255
    • /
    • 2008
  • The purpose of construction project management is to achieve planned quality by adequate cost and schedule of the project, thus the effective time management is a critical factor to actualize the object. But the traditional time management by using milestone has several limitations which are not sufficiently considered mutual relation and variated from the task. On this wise, applying the concept and principles of lean construction to the project will be the best way not only reduce waste and variation, but also improve the productivity and ability to overcome limitation as mentioned above. Thus the study, Last Planner System, specially focuses on constraint analysis which is used in lookahead planning system. The results of this research will provide the constraints classification that is able to improve work reliable and percent plan complete when time planning by controlling constraints of project.

  • PDF