• Title/Summary/Keyword: 자재관리

Search Result 598, Processing Time 0.023 seconds

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

A Performance Test for Assessment of the RFID/USN Inter-working System's Applicability to the Construction Industry (RFID/USN 연동 시스템의 건설 산업 적용을 위한 성능 실험에 관한 연구)

  • Yoo, Ji-Yeon;Choi, Nu-Ri;Kim, Chang-Wan;Kim, Hyoung-Kwan;Han, Seung-Heon;Kim, Moon-Kyum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.880-885
    • /
    • 2007
  • In the last decades, the resource used in the construction process has become much more various in kinds and increased in number as construction has become enlargement and complexity. Resource management on a construction site has been recognized as a detrimental factor to influence project success, therefore various technologies have been applied by the construction industry to streamline resource management. RFID/USN interworking system composed of RFID technology and sensor network supports automation of resource management and real-time information networking. Most of research efforts for RFID technology in the construction industry have been limited to object identification technology. The study proposed herein it to verify the applicability of RFID/USN interworking system to the construction industry. The identification rates of RFID/USN interworking system by distance and degree and by type of materials was identified and analyzed.

  • PDF

An Optimization Algorithm of Gypsum Board Loss for Wall Finishing in Modular Construction System (모듈러건축 벽체마감 석고보드 손실 최적화 알고리즘 개발)

  • Lee, Dong-Min;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.101-110
    • /
    • 2014
  • The ministry of Land, Infrastructure and Transport announced that they launched the pilot project to offer Happy House built with modular construction as part of the major projects of incumbent government in 2013. The market size of modular construction is getting increasingly enlarged together with strong will of government. The major challenges that current modular construction encounters can be summed up as lack of standardization of material on the stage of design and fabrication. The portion of material costs in modular construction marks 16 to 17% higher than the existing other construction method, and account for 60 % of total construction cost, which is why material management is the most important factor. However, the imperfect standardization and specification on design causes high loss of materials on fabrication, which makes the construction wastes and total construction cost increasing in accordance with the increase of material costs. This study has been conducted to verify major modules by developing optimization algorithm on gypsum board material among wall finishing materials. It is expected that this paper contributes not only to eco-friendly construction by minimizing the waste factors of materials through these efforts, but also to removing high cost issues which had been recognized as a setback of current modular construction.

Mobile Material Management Through Real Time Connection with ERP System (모바일을 활용한 실시간 ERP시스템 연동 모형의 구축: 자재관리 고도화 사례 중심으로)

  • Lee, Chae-Eun;Lee, Dong-Man;Yoo, Ji-Young
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.285-305
    • /
    • 2004
  • This study is based on providing core infrastructure to make or extend an ERP strategy to make the proper model to cope effectively with various customer requirements and market changes through ERP improvement. The purpose of this study is to support making a competitive advantage by raising productivity and reducing costs as a result of making and applying the "mobile real time connection to ERP"model which is accessible anywhere and anytime using PDA and wireless LAN on the basis of mobile business concept. The model is implemented as the "mobile Material Management System" on the area of material management of ERP in the enterprise which already implemented ERP system. This model is also applied into other divisions of the enterprise. This case study shows that the proper application of ERP reduces costs by reducing business process lead time, increase productivity and customer satisfaction through mobility and instant connectivity and easiness of the system. It is recommended to apply this model into the ERP system which is used in most enterprise, to make a competitive advantage. To sum up, the model in this study can be applied into the enterprise which wants to reduce costs, increase productivity and customer satisfaction through ERP improvement.

A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type (Web기반을 활용한 자재 조달 시스템 개선방안)

  • Lee, Im-Bae;Kim, Hong-Hyun;Yoon, Su-Won;Min, Kyung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

2009친환경유기농자재 관리 어떻게 하나? - 사후관리 강화.세부검토기준 확립.지원사업 개선돼야

  • Lee, Gwang-Ha
    • Life and Agrochemicals
    • /
    • v.30 no.1 s.244
    • /
    • pp.28-31
    • /
    • 2009
  • 현재 목록공시 품목은 토양개량 작물생육용 485종 및 병해충관리용 164종 등 총 649종이다. 그러나 법률규정 및 사후관리가 미흡하고 천연물질 등에 대한 분석이 어려워 품질관리가 쉽지않은 실정이다. 관련업계 및 유관기과, 농업인 단체 등의 지혜를 모아햐 할 때이다.

  • PDF