Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique (개선된 자원 평준화 기법을 활용한 적정 공기산정에 관한 연구)

  • Yoon Yung-Sang;Kim Kyung-Hwan;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.575-578
    • /
    • 2004
  • Since a construction project is a series of works that utilizes resources to accomplish the project goal for a given time period, efficient resource management is a prerequisite for the success of the project. Two major areas of resource management are resource constrained scheduling focusing on the limited resource availability and resource leveling focusing on smoothing resource usage pattern on the fixed project completion time. It is not available, however, to apply both techniques to a project at the same time. This paper proposes a model to enhance the minimum moment algorithm of resource leveling, aiming to find an efficient usage of resources and an appropriate project completion time. A survey is performed to evaluate the major five factors using the AHP.

  • PDF

Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique (개선된 자원 평준화 기법을 활용한 적정 공기산정 방안)

  • Kim Kyung-Hwan;Yoon Yung-Sang;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.126-134
    • /
    • 2004
  • Since a construction project is a series of works that utilizes resources to accomplish the project goal for a given time period, efficient resource management is a prerequisite for the success of the project. Two major areas of resource management are resource constrained scheduling focusing on the limited resource availability and resource leveling focusing on smoothing resource usage pattern on the fixed project completion time. It is not available, however, to apply both techniques to a project at the same time. This paper proposes a model to enhance the minimum moment algorithm of resource leveling, aiming to find an efficient usage of resources and an appropriate project completion time. A survey was performed to evaluate the major five factors in the model. A case study demonstrates the value of the proposed resource leveling technique.

An Efficient Wear-leveling Scheme for Flash Memory File System (플래시 메모리 파일 시스템을 위한 효율적인 소거 횟수 평준화 기법)

  • 배영현;최종무;이동희;노삼혁;민상렬
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.10a
    • /
    • pp.580-582
    • /
    • 2004
  • 이동 기기의 저장 장치로 널리 사용되는 플래시 메모리는 데이터를 기록하기 전에 해당 블록이 미리 소거되어 있어야 하는 제약이 있다. 또한 각 블록은 소거 횟수의 한계를 가지고 있기 때문에 특정 블록이 집중적으로 사용되는 경우에는 일부 블록의 수명이 일찍 다하게 되어 저장 장치로서의 구명도 짧아지게 된다. 따라서 플래시 메모리 파일 시스템은 고속의 데이터 입출력 성능뿐만 아니라 기록과 소거 동작이 특정 블록에 집중되지 않도록 하여 저장 장치의 내구성을 개선하는 소거 횟수 평준화 기능을 제공해야 한다. 기존에 제안된 소거 횟수 평준화 기법은 복잡한 계산을 필요로 하며 각 블록의 소거 횟수를 유지해야 하는 비용 등으로 인해 자원이 부족한 소형 이동 기기에서 구현하기에는 비효율적이다. 본 논문에서는 플래시 메모리 파일 시스템에서 구현과 동작이 단순하고 어떠한 데이터 접근 형태에 대해서도 평준화 성능이 우수한 효율적인 소거 횟수 평준화 기법을 제안한다. 그리고 제안된 기법을 구현하여 기존 플래시 메모리 파일 시스템의 소거 횟수 평준화 성능과 비교 평가한다.

  • PDF

산업용 축냉시스템의 전력부하평준화 효과분석 기술

  • 양승권
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.315
    • /
    • pp.44-47
    • /
    • 2003
  • 축열시스템(Thermal Storage System)이란 열에너지의 공급과 수요 사이에 있을 수 있는 시간적. 공간적 그리고 양적. 질적 부하 격차를 해소함으로써 에너지 이용효율을 향상시키는 시스템이다. 특히 축냉시스템은 심야전력을 이용해서 생산된 냉열을 저장하였다가 주간의 건물 냉방부하에 이용하는 시스템으로 계절간, 일간 전력부하 격차를 해소하는 중요한 매개체로 활용된다. 하지만 국내 축냉식 심야전력기기는 건물 냉방용으로만 적용대상이 한정되어 있어 보급에 한계가 있으며, 활용기간도 짧아 국가적으로도 자원 낭비적인 요소가 있다. 따라서 하절기 주간 전력부하의 평준화 효과를 확대하기 위해서는 활용기간이 길며, 적용범위가 광범위한 산업(상업 또 농수축산업 포함)용 냉장$\cdot$냉동 시스템에 축냉시스템 적용을 확대할 필요가 제기되고 있다. 이에 국내 산업용 축냉시스템 적용의 타당성 및 전력부하 평준화효과 분석기술 개발현황 및 방향을 소개하고자 한다.

  • PDF

Resource Leveling using Genetic Algorithm (유전알고리즘을 활용한 자원평준화 방법론)

  • Gwak, Han-Seong;Bea, Sang-Hee;Lee, Dong-Eun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.67-74
    • /
    • 2018
  • Resource leveling minimizes resource fluctuations by deferring the earliest start times (ESTs) of non-critical activities within their corresponding total float. The intentional float-consumption for resource leveling purpose reduces the schedule delay contingency. This paper presents a method called Genetic Algorithm based Resource Leveling (GARL) that minimizes resource fluctuations and float-consumption impact over project duration. It identifies activities that are less sensitive to float-consumption and performs resource leveling using those activities. The study is of value to project scheduler because GARL identifies the set of activities to be deferred and the number of shift day(s) of each and every activities in the set within its total float expeditiously. It contributes to establish a baseline schedule which implements an optimal resource leveling plan. A case study is presented to verify the validity and usability of the method. It was confirmed that GARL satisfies the project duration constraint by considering resource fluctuations and float-consumption over project duration.

Erection Process Planning & Scheduling using Genetic Algorithm (유전 알고리즘을 이용한 탑재 공정과 일정 계획)

  • J.W. Lee;H.J. Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.32 no.1
    • /
    • pp.9-16
    • /
    • 1995
  • The erection process planning is to decide erection strategy and sequence that satisfies dock duration. The erection scheduling is to decide erection date of each block. The load profile varies according to scheduling and it is related to building cost. It must be possible to simulate the various combinations of process plan and schedule for optimal planning. To develop the process planning system for optimal planning, the system that generate the sequence of erection automatically and the load leveling system are required. This paper suggests the method that generates the erection sequence. The load leveling should be done to all the ships in the same dock batch to get reliable results. In this case since the search space is very large, efficient optimization method is needed Our research achieved the load leveling system using Genetic Algorithm. This system made it possible to simulate various process plans to which schedule is considered.

  • PDF

Design of the Distributed Search Engine for Intranet Load Balancing (인트라넷 부하 평준화를 위한 분산 검색엔진 설계)

  • 고윤석;윤희병
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10a
    • /
    • pp.157-159
    • /
    • 2003
  • 본 논문은 인트라넷에서 검색엔진 운용시 발생되는 트랙픽을 감소하여 네트워크 자원을 효율적으로 이용하기 위한 분산 웹 크롤링 에이전트와 인덱싱 에이전트를 제안한다. 일반적인 검색엔진의 구성, 인트라넷의 네트워크 구성 및 인트라넷이 인터넷과 구별되는 몇가지 특징을 제시하고 이에 적합한 분산 검색엔진을 설계하며 분산 검색엔진의 각 에이전트들이 분산 환경에 동작할 수 있도록 하기 위하여 URL Sorter, URL Provider 및 분산 Indexer를 설계한다.

  • PDF

Distributed Trade-based End Node Management in a Multi-Gateway (다중 게이트웨이 환경에서의 분산 트레이드 기반 종단 노드 관리)

  • Lee, Tae-Ho;Kim, Se-Jun;Lee, Byung-Jun;Kim, Kyung-Tae;Youn, Hee-Yong
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2019.01a
    • /
    • pp.151-152
    • /
    • 2019
  • 본 논문에서는 사물인터넷(Internet of Things, IoT)에 적용되어 사용될 수 있는 다중 게이트웨이 환경에서 각 게이트웨이의 상황에 따라 종단 노드를 분산 트레이드 해줌으로서 게이트웨이의 자원 소모 효율성 증대 및 수명 연장을 할 수 있는 기법을 제안한다. 본 논문에서는 해당 기법을 두 단계에 걸쳐 제안하고 해당 기법의 효율성 입증을 위하여 클라우드 컴퓨팅이라는 대규모 환경을 가정하여 실험을 진행하였으며, 해당 실험의 결과에 따르면 전체 게이트웨이의 자원 소모량이 평준화됨과 동시에 효율성이 증대되었음을 확인할 수 있다.

  • PDF

Staggered Resource Allocation Scheme for Co-Channel Interference Mitigation in a Cellular OFDMA System (셀룰러 OFDMA 시스템에서 동일 채널 간섭 완화를 위한 대역 분산적 자원 할당 기법)

  • Son, Jun-Ho;Min, Tae-Young;Kang, Chung-G.
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.12A
    • /
    • pp.1191-1199
    • /
    • 2008
  • We propose the Staggered-zone Resource Allocation (SRA) in order to relax throughput decrease problems by the co-channel interference of the cell boundary users at the cellular OFDMA system using frequency reuse factor K=1 and analyze the throughput improvement. The proposed algorithm allocates the resources to the users in compliance with resource allocation rule which is planned in order to minimize co-channel interference between cells without any additional information. The resource allocation method in the SRA lines up the users in pathloss order as descending series, and then allocates from pre-determined resource allocation region where decides differently in each cell. This algorithm prevents the co-channel interferences of the cell boundary user to be caused by using same resource simultaneously and equalizes interference to the users in the cell.

Reference project of Small hydro power system Using low head (보(洑)를 이용한 '저낙차대유량'소수력발전소 건설)

  • Shin, Hong-Seob;Park, Kyung-Hwan;Song, In-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2112-2113
    • /
    • 2011
  • 우리나라는 연평균 강수량이 1,245mm로써, 비교적 강수량이 풍부하고 전국토의 2/3가 산지로 구성되어 있어 지형적 및 수문학적으로 수력자원 부존량이 많은 편이다. 하지만 수력자원 활용을 통한 발전소 건설은 매우 미미한데 이는 수력발전소 개발지점이 제약되어 있고 개발지점의 가동율 또한 매우 낮아 경제성 확보가 어렵기 때문이다. 수력발전은 전력수요 급증 시 부하 평준화 효과와 석유 수입대체 및 환경 친화적인 에너지원이라는 장점이 있다. 따라서 국산화된 수차발전시스템의 사용으로 초기투자비를 낮추고 하천형 수력발전소 건설을 통하여 가동율을 높인다면 우리나라의 수력발전사업은 크게 활성화 될 것이다. 본 논문에서는 하천형 수력발전소 시공사례를 통하여 주요 시공사례를 소개하고, 하천공사의 특징으로 인하여 설계 및 시공 시 반영해야 할 사항에 대해 몇 가지 소개하였다. 표준화를 통하여 건설비용을 절감, 발전 단가의 기준가격 현실화를 통한 재정적인 지원 및 법규 정비를 통한 제도적인 도움 이 세가지를 해결한다면 경쟁력 있는 소수력발전소 건설이 가능 할 것이다.

  • PDF