• Title/Summary/Keyword: 자동조명기

Search Result 83, Processing Time 0.024 seconds

Development Pole Transformer with Automatic Tap Changer (자동 탭 절환 내장형 주상변압기 개발에 관한 연구)

  • Nam-Koong, Won;Lee, Sung-Woo;Jang, Moon-Jong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.9
    • /
    • pp.108-113
    • /
    • 2013
  • Change of supply voltage, customer load, output of distributed generation, etc cause voltage change in distribution system. OLTC and SVR are usually used to supply normal voltage at customer. But usage of these devices is inefficient and uneconomical in certain circumstances. To solve this problem, new pole transformer which has automatic tap changer is developed. The transformer changes tap when voltage changes. And it has latch switch and reactor for supplying power without outage. To verify normal operation of tap changer, test is conducted. SVR and 50kVA load is used for test.

A study on the display of real time wind information for safe flight (항공기 안전을 위한 실시간 바람정보 표출 방안 연구)

  • Lee, Jun-Woo;Cho, Myeong-Heum;Jeong, Sang-Gu;Pyo, Kyun-Soo;Park, Young-Jin
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.65-66
    • /
    • 2017
  • 바람은 기상, 기후, 농림, 교통, 산업, 재난, 생활안전, 신재생 에너지 등 다양한 분야에서 널리 활용되는 요소 중 하나이다. 특히, 항공기 이착륙에서는 측풍의 형태가 항공기 안전에 큰 영향을 미친다. 본 연구에서는 연구지역의 기 구축된 자동기상관측장비(AWS)의 정보를 연계 구축하여, 풍향과 풍속을 1분 단위의 변화량을 반영한 실시간 바람정보 표출시스템을 개발하였다. 이를 통해 기존 문자 및 이미지 형태의 정보에서 시각화된 실시간 바람지도 제공을 통해 공항 이착륙시 항공기 안전운항에 도움이 될 것으로 기대된다.

  • PDF

Interconnection Capacity Evaluation of Distributed Resources at the Distribution Networks in View of Distribution Protection Coordination (배전계통의 보호협조측면에서 본 분산전원 연계용량 검토)

  • Choi, Joon-Ho;Ro, Kyoung-Soo;Park, Sung-Jun;Song, Kyung-Bin;Yun, Sang-Yun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.3
    • /
    • pp.107-116
    • /
    • 2007
  • The introduction of new renewable energy is going on increase with the second plan of the Korean Government "Technology Development, Utilization and Popularization of New Renewable Energy". In general, it is connected to the power system due to the nature of it's source characteristics but it's interconnection operation impacts on the power system planning and operation. The operation schemes of the existing power distribution system are based on the unidirectional power flow, but unidirectional power flow changes to bidirectional power flow due to the interconnection operation of new renewable energy. It degrade the existing protection coordination system and power quality of the power distribution system. Thus, the technical evaluation process of the interconnection of new renewable energy are necessary. In this paper, the characteristics of the existing automatic recloser and sectionalizer are reviewed and interconnection capacity evaluation method of the DR(distributed resources) in the existing automatic recloser-sectionalizer protective coordination system are proposed.

Robust speed control of DC Motor using Neural network-PID hybrid controller (신경회로망-PID복합형제어기를 이용한 직류 전동기의 강인한 속도제어)

  • Yoo, In-Ho;Oh, Hoon;Cho, Hyun-Sub;Lee, Sung-Soo;Kim, Yong-Wook;Park, Wal-Seo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.1
    • /
    • pp.85-89
    • /
    • 2004
  • Robust control for feedback control system is needed according to the highest precision of industrial automation. However, when a neural network feedback control system has an effect of disturbance, it is very difficult to guarantee the robustness of control system. As a compensation method solving this problem, in this paper, hybrid control method of neural network controller and PID controller is presented. A neural network controller is operated as a main controller, a PID controller is a assistant controller which operates only when some undesirable phenomena occur, e.q., when the error hit the boundary of constraint set. The robust control function of neural network-PID hybrid controller is demonstrated by speed control of Motor.

A Nonlinear Speed Control of a Permanent Magnet Synchronous Motor Using a Sequential Parameter Auto-Tuning Algorithm for Servo Equipments (서보 설비를 위한 순차적 파라미터 자동 튜닝 알고리즘을 사용한 영구자석 동기전동기의 비선형 속도 제어)

  • Kim, Kyeong-Hwa
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.2
    • /
    • pp.114-123
    • /
    • 2005
  • A nonlinear speed control of a PMSM using a sequential parameter auto-tuning algorithm for servo equipments is presented. The nonlinear control scheme gives an undesirable output performance under the mismatch of the system parameters and load conditions. Recently, to improve the performance, an adaptive linearization scheme, a sliding mode control and an observer-based technique have been reported. Although a good performance can be obtained, the performance is not satisfactory any more under specific conditions such as a large inertia variation, a fast speed transient or an increased sampling time. The simultaneous estimation of principal parameters giving a direct influence on speed dynamics is generally not simple. To overcome this problem, a a sequential parameter auto-tuning algorithm at start-up is proposed, where dominant parameters are estimated in a prescribed regular sequence based on the method that one parameter is estimated during each interval. The proposed scheme is implemented on a PMSM using DSP TMS320C31 and the effectiveness is verified through simulations and experiments.

Design of Adaptive Neuro- Fuzzy Precompensator for Enhancement of Power System Stability (전력계통의 안정도 향상을 위한 적응 뉴로-퍼지 전 보상기 설계)

  • 정형환;정문규;이정필;이준탁
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.4
    • /
    • pp.14-22
    • /
    • 2001
  • In this paper, we design the Adaptive Neuro-Fuzzy Precompensator(ANFP) for the suppression of low-frequency oscillation and the improvement of system stability. Here, ANFP is designed to compensate the conventional Power System Stabilizer(PSS). This design technique has the structural merit that is easily implemented by adding ANFP to an existing PSS. Firstly, the Fuzzy Precompensator with Loaming ability is constructed and is directly learned from the input and output data of the generating unit. Because the ANFP has the property of learning, fuzzy rules and membership functions of the compensator can be automatically tuned by teaming algorithm Loaming is based on the minimization of the ems evaluated by comparing the output of the ANFP and a desired controller. Case studies show the 7posed schema can be provided the good damping of the power system over the wide range of operating conditions and improved dynamic performance of the system.

  • PDF

A Study on Damping Improvement of a Synchronous Generator with Static VAR Compensator using a Fuzzy-PI Controller (퍼지-PI 제어기를 이용하여 정지형 무효전력 보상기를 포함한 동기 발전기의 안정도 개선에 관한 연구)

  • 주석민;허동렬;김상효;정동일;정형환
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.3
    • /
    • pp.57-66
    • /
    • 2001
  • This paper resents a control approach for designing a fuzzy-PI controller for a synchronous generator excitation and SVC system A combination of thyristor-controlled reactors and fixed capacitors (TCR-FC) type SVC is recognized as having the must fiexible control and high speed response, which has been widely utilized in power systems, is considered and designed to improve the response of a synchronous generator, as well as controlling the system voltage A Fuzzy-PI controller for SVC system was proposed in this paper. The PI gain parameters of the proposed Fuzzy-PI controller which is a special type of PI ones are self-tuned by fuzzy inference technique. It is natural that the fuzzy inference technique should be barred on humans intuitions and empirical knowledge. Nonetheless, the conventional ones were not so. Therefore, In this paper, the fuzzy inference technique of PI gains using MMGM(Min Max Gravity Method) which is very similar to humans inference procedures, was presented and allied to the SVC system. The system dynamic responses are examined after applying all small disturbance condition.

  • PDF

A Study on the Effective Management of Image Stage Gauge System (영상수위계 시스템의 효율적 운영에 관한 연구)

  • Kwon, Sung-Ill;Kim, Won;Lee, Chan-Joo;Kim, Dong--Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1916-1920
    • /
    • 2010
  • 영상수위계는 카메라에 의해서 수위표를 촬영하여 촬영된 영상을 처리하여 수위값으로 변환하여 자동적으로 수위를 측정하는 장비이다. 이 수위계는 기존 수위측정 장비인 부자식, 압력식, 기포식, 초음파식, 레이다식과는 달리 수위표를 촬영한 영상으로부터 수위를 직접 눈으로 확인할 수 있는 장점이 있다. 이로 인해 영상자료로부터 측정된 수위를 검증할 수 있어 수위측정의 정확도를 향상시킬 수 있다. 그리고 수위표 영상과 더불어 관측지점 주변의 전체 영상을 동시에 촬영하여 실시간으로 전송하기 때문에 홍수시 하천 상황에 대한 모니터링 목적으로 사용될 수 있다. 영상수위계 시스템은 크게 메인제어기, 전원부, 서버부 및 카메라부로 구성되어 있다. 현재 운영되고 있는 시스템은 전원장치 리셋시 전 시스템을 리셋해야하고, 상전 단전시 전 시스템이 off된다. 그리고 별도의 통신모듈을 사용하여 장비간 통신이 이루어지고 있다. 또한 카메라부에는 렌즈와 팬/틸트를 제어하기 위한 별도의 장비가 포함되어 있고, 백색 LED 조명이 사용되어 야간에 수위인식주기마다 조명이 on/off 되고 있다. 위와 같은 전원장치의 운영으로 시스템을 안정적으로 운영할 수 없다. 그리고 수위 오인식을 최소화하기 위해서는 연속적인 수위 인식이 필요하지만, 백색 LED조명과 1초에 2프레임을 캡쳐하는 비디오 캡쳐방식에 의해 시스템을 상시로 운영하는 것이 곤란하다. 현재 운영 중인 영상수위계를 안정적으로 운영할 수 있도록 장비별로 제어가 가능하도록 전원 제어장치를 개발하였고, 상전 단전시 최소 30분 정도 전원을 유지할 수 있도록 무정전전원장치(UPS)를 설치하였으며, 측정자료의 저장장치를 하드디스크 타입에서 Flash SSD 메모리 타입으로 교체하였다. 또한 영상수위계 시스템을 상시 운영할 수 있도록 백색 LED조명을 적외선 LED조명으로 교체하였고, 1초에 1회 수위를 인식하도록 수위인식주기와 1초에 25프레임 캡쳐할 수 있도록 비디오 캡쳐방식을 개선하였다. 위와 같은 시스템의 개선으로 시스템을 안정적으로 운영할 수 있게 되어 시스템 고장에 의해 발생하는 수위 결측을 감소시킬 수 있고, 시스템의 상시 운영으로 수 위 오인식을 최소화시킬 수 있을 것으로 판단된다.

  • PDF

A Study on Characteristics for a Contract Power Conversion Factor and Analysis of a Maximum Utilization Factor of Transformer in Industrial Customers (산업용전력사용고객의 변압기최대이용률과 계약전력환산율에 관한 연구)

  • Kim, Se-Dong;Yoo, Sang-Bong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.6
    • /
    • pp.44-49
    • /
    • 2008
  • Contract power conversion factor which is applied to estimate contract power of industrial customers is an important standard to caculate transformer capacity. This paper shows a reasonable contract power conversion factor, that was made by the systematic and statistical way considering actual conditions, such as investigated contact power and peak power for the last 5 years of each customer for 349 industrial customers as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimun and thus it was carried by the linear and nonlinear regression analysis. Therefore, this paper compared characteristics for a contract power conversion factor which is a lied to calculate contract power with characteristics for a regression model for customers which maximum utilization factor of transformer is more than 60(%).

A Study on Characteristics for a Contract Power Conversion Factor and Analysis of a Maximum Utilization Factor of Transformer in General Customers (일반용전력사용고객의 변압기최대이용률과 계약전력환산율 기준과의 비교 특성 연구)

  • Kim, Se-Dong;Wang, Yong-Peel
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.5
    • /
    • pp.80-85
    • /
    • 2008
  • Contract power conversion factor which is applied to estimate contract power of general customers is an important standard to caculate transformer capacity. This paper shows a reasonable contract power conversion factor, that was made by the systematic and statistical way considering actual conditions, such as investigated contract power and peak power for the last 5 years of each customer for 461 general customers as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimun and thus it was carried by the linear and nonlinear regression analysis. Therefore, this paper compared characteristics for a contract power conversion factor which is applied to estimate contract power with characteristics for a regression model for customers which maximum utilization factor of transformer is more than 60[%].