• Title/Summary/Keyword: 입찰 방식

Search Result 150, Processing Time 0.025 seconds

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

Design of an XML-Based Auction System Using Case Similarity and Web Mining (사례 유사도와 웹 마이닝을 이용한 XML 기반 경매 시스템의 설계)

  • 조항철;이용규
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2001.11a
    • /
    • pp.348-354
    • /
    • 2001
  • 웹 상에서 인터넷을 이용한 전자상거래와 관련된 다양한 서비스가 창출되고 있다. 온라인 쇼핑몰에서 발전된 개념인 온라인 경매시스템은 쇼핑몰과는 달리 물품등록, 입찰 및 낙찰, 물품거래의 과정을 거친다 그러나, 대부분의 경매시스템은 입찰 및 낙찰과정에서 거래 당사자간에 신뢰성 있는 가격을 결정짓지 못하고 있다. 따라서, 본 논문에서는 가격 결정 방식에 따른 인터넷 경매의 종류와 유형을 분석한 후 경매 시스템 사용자들에게 사례 유사도와 웹 마이닝을 이용한 가격 정보를 제시하여 객관적인 기준으로 경매 물품의 가치를 평가할 수 있도록 하고, 표준화된 데이터 표현 방법인 XML을 이용한 인터넷 경매 시스템을 설계하고 프로토타입을 구현하고자 한다.

  • PDF

A Study on Bidding Strategy Model of Combined Cycle Plants in Korean Electricity Market (우리나라 전력시장에서 복합화력 발전의 입찰전략 수립 모형 연구)

  • Kim, Sang-Hoon;Lee, Kwang-Ho;Jeong, Lae-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.550-551
    • /
    • 2008
  • 복합화력발전은 여러 가지 장점으로 오늘날 많이 사용되는 발전방식이며, 가스터빈과 스팀터빈의 결합으로 여러 운전 Mode를 갖는다. 본 연구에서는 이러한 특성을 고려하여 복합화력 발전사와 시장운영자와의 관계를 분석하고, 복합화력발전사가 운전 Mode 선택을 전략변수로 사용하는 입찰전략 수립 모형을 제시한다.

  • PDF

한(韓)·호(豪) 항만구조물 설계기준 비교 - 잔교식 안벽을 중심으로

  • Byeon, Gi-Jun;Gang, Gyu-Won;Han, Gwang-Pil
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.76-77
    • /
    • 2018
  • 해외 입찰 시 각 나라에서 적용하고 있는 설계기준의 이해 정도는 적정 설계 물량 산출은 물론 시공성, 공사비 등에 영향을 미쳐 프로젝트 수주 및 수행 성공여부에 매우 중요한 요소로 작용한다. 본 자료는 잔교식 안벽의 해외 입찰설계 단계에서 주요 단면 결정을 위한 주요 설계기준 항목에 대해 호주와 한국의 항만구조물 설계기준을 비교하여 호주 프로젝트를 추진하는 엔지니어에게 도움이 되고자 한다.

  • PDF

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

Efficiency Enhancement of Electricity Market by MOS-EMS Interfaced Operation (MOS-EMS 연계활용을 통한 전력시장의 효율개선)

  • Ok, Ki-Youl;Kim, Kwang-In;Kim, Doo-Jung;Kim, Kwang-Chul;Moon, Young-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.363-364
    • /
    • 2006
  • 변동비반영시장(CBP)의 장기화가 예상됨에 따라 전력거래소는 차기 도매전력시장의 운영을 위해 개발된 시장운영시스템(MOS)을 현행급전체계에 활용하는 사업을 추진하고 있다. 이를 위하여 전력거래소는 현 CBP의 비용기반 입찰자료를 MOS의 가격입찰 방식으로 등가적으로 변환하는 입찰변환시스템과 MOS-EMS 연계운영의 적정성을 감시 및 진단하는 시장운영감시시스템을 개발하였다. 또한 MOS의 실시간(5분) 급전계획이 최적으로 수립될 수 있도록 상태추정의 신뢰성 및 수요예측의 정확도를 향상시켰다. 아울러 MOS-EMS 연계운영의 안정성을 검증하기 위해 10단계에 걸친 실계통 실증시험을 성공적으로 종료하였으며, 그 결과 계통운영의 효율성 및 투명성 향상은 물론 연간 260억원 이상의 발전비용 절감효과가 발생함을 입증하였다.

  • PDF

A Study on the Estimation of Incomplete Information in an Electricity Market using the Results of Power Transaction (시장실적을 이용한 전력시장 불완비정보의 추정에 관한 연구)

  • Shin, Jae-Hong;Lee, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.378-379
    • /
    • 2006
  • 향후 나타날 가격 입찰방식 시장(Price-Bidding Generation Pool; PBP)에서는 발전사업자가 전략적으로 제출하는 비용특성에 의해 전력거래가 결정되기 때문에 상대기업의 비용특성을 정확히 안다는 것은 힘들다. 본 연구는 경쟁상황에서 상대사업자의 비용특성을 모르는 경우, 비용특성을 추정하고 추정을 통해 입찰전략을 결정하는 기법을 제안한다. 추정은 시장실적을 이용하여 이루어지며 이득을 최대화시킬 것이라 예상되는 입찰전략을 결정한다. 또한 정확성을 높이기 위해 평균이득 개념을 사용하여 추정을 시도한다.

  • PDF

A Real Time Bidding Agent System Applying fuzzy-Based Bid Limit (퍼지-기반 낙폭 제한을 적용한 실시간 입찰 에이전트 시스템)

  • 임준식
    • Journal of Internet Computing and Services
    • /
    • v.2 no.2
    • /
    • pp.95-103
    • /
    • 2001
  • This paper implements the desirable-bid price type bidding agent system that enables internet bidding between buyer and sellers efficiently in real Time. The agent system controls the bid-limit to approach successful desirable-bid price of a buyer. to reduce unsuccessful bid rate using fuzzy-based bid-limit inference method.

  • PDF

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF