A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid) (해외 쉴드TBM 입찰안내서 분석을 통한 국내 발주 기준 정립에 관한 연구)

  • Kim, Ki-Hwan;Kim, Hyouk;Mun, Cheol-Hwa;Kim, Young-Hyu;Kim, Dong-Ho;Lee, Jae-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.985-997
    • /
    • 2017
  • In many countries, most of the tunneling works have been ordered by the shield TBM, and also Korean companies are actively bidding and execute in this project. In case of Korea, refurbished machines are mainly using in power cable, gas pipelines, and water and sewage tunnel. Also in metro projects, shield TBM of over diameter 7m is required mainly by using brand new machine. Since the shield TBM is not easy to change once it is produced, it is necessary for the client to provide sufficient information on the production conditions so as to satisfy various characteristics of the construction. In this study, to manufacturing optimal shield TBM, the Client's TBM requirements of tunnel construction in Hong Kong and UK was analyzed and compared with the domestic requirements. The results are expected to provide as client's guidelines for bidding stage and manufacturing for shield TBM tunneling in Korea in the future.

Domestic and Overseas TBM Production Specification and Professional Training Program (국내외 TBM 제작 사양 및 전문인력 양성 프로그램 분석)

  • Kim, Ki-Hwan;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa;Jeong, Yun-Young;Kim, Hyouk
    • Tunnel and Underground Space
    • /
    • v.29 no.5
    • /
    • pp.281-291
    • /
    • 2019
  • In Overseas case, most tunnels in under are or through the river are constructed with shield TBM and the manufacturer orders of related equipment suitable for the project are mode. Accordingly, the client provides the specifications required for the equipment manufacture. In addition, TBM equipment has been operated by those who have completed the expert training program, which for minimizing the risk of equipment operation in construction field corresponding to the mechanized construction. However, in Korea, such a system related to above the program and specifications has not yet been built, which is causing a lot of difficulties in construction field. Therefore, this study investigated the differences in bidding guides provided by mechanized construction in domestic and abroad, and the professional education programs for expert training being conducted from overseas. Futhermore, we will propose the guidelines of essential equipment specification contained in domestic bidding and provide the necessary manual for the professional education program for TBM as the mechanized construction method.

A Study on the adequacy of Hospital Architecture Deign-Build and Improvement of Assessment Criteria - Focus on the case of Architectural Planning Design Change - (병원건축 일괄입찰방식의 적합성과 평가기준 개선방안에 관한 연구 - 건축계획의 설계변경사례를 중심으로 -)

  • Hong, Seung-Min;Yang, Nae-Won
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.2
    • /
    • pp.215-222
    • /
    • 2012
  • Design-build is expanding gradually in large construction projects over 10billion won, and continue to work in health care facilities is increasing in this way. This constructional method in health care facilities, despite the many advantages, many problems caused by design changes are being raised. Raises the question of design changes on the side of construction contract, such as approval systems have been studied in the field of construction. The purpose of this study design in aspects of architectural planning on changing the grasp of the issues outlined in the ITB and bid evaluation criteria through consideration of the basic plan for improvement guidelines and evaluation criteria is presented. In conclusion, Design build, according to the presence of existing users are more likely to lead to design changes. Thus, hospital architecture, depending on how it is considered that constructional methods. And evaluation items of ITB(Invitation To Bidder) for a large part of the change in the variables evaluated in the hospital building is not suitable for the design build. Instead, the overall shape of the building and department, unit type and size, vertical and horizontal parts of the circulation system in the shape of the building that does not change in structure and etc should be considered for evaluation.

  • PDF

이중곡면반파공을 이용한 월파저감 방파호안

  • Kim, Geon-U;Seo, Chang-Wan;Park, Gu-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.173-175
    • /
    • 2007
  • 부산신항 남컨 배후지준설토 투기장은 국제도시 부산의 관문이 될 부산신항만 입구부에 위치한 관계로 아름답고 튼튼한 호안이 될 수 있도록 하고, 입찰안내서에 제시된 호안법선변경 금지, 호안마루높이 DL.(+)7.50m 유지 조건을 준수하면서 최적의 구조물이 되도록 하였다. 본사업지는 지형적 특성상 복잡한 형태의 고파랑 작용으로 수리학적으로 월파, 반사파, 연파를 제어하는 경사호안 구조물을 도입하였고, 초연약지반이 대심도로 분포하는 특성을 고려하여 개선된 S.C.P 연약지반 처리공법을 적용하여 기초굴착 없는 친환경적이고 배수기능을 향상시킨 융기토 유용형 S.C.P공법을 적용하였다. 호안전구간은 친수개념을 도입하였으며, 호남도 주변 해양생태계 보호를 위하여 미티게이션(mitigation) 개념을 도입하여 환경복원 계획 및 생태형 친수호안을 구상하였다.

  • PDF

A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology (대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Kim, Hwa-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.32-38
    • /
    • 2007
  • Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.

  • PDF

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

Review of Intelligent Transportation Systems Model Deployment Initiative (지자체 지능형교통체계 구축사업의 평가와 발전방안)

  • Nam Doohee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.4 no.2 s.7
    • /
    • pp.33-43
    • /
    • 2005
  • In autumn 2000, the Korea Ministry of Construction and Transportation (MOCT) announced that Daejeon metropolitan city, Jeonju and Jeju were chosen to showcase deployment of Intelligent Transportation Systems(ITS). The program called the Advanced Transportation Systems Model Deployment Initiatives makes a significant step in Intelligent Transportation Infrastructure (In) in Korea. The Initiative is poised to increase the performance and efficiency of the area's roadway and transportation systems to meet growth demand. Three citie's $\$$50 million Model Deployment Initiative project is poised to increase the performance and efficiency of the area's roadway and transportation systems to meet growth demand. The effort particularly focused on the traveler information systems that should raise the level of ITS awareness in Korea. In this paper, project management, funding, private investment, procedures and detailed review of ITS Model Deployment Initiatives are discussed.

  • PDF