• Title/Summary/Keyword: 입찰과정

Search Result 83, Processing Time 0.026 seconds

Review of Intelligent Transportation Systems Model Deployment Initiative (지자체 지능형교통체계 구축사업의 평가와 발전방안)

  • Nam Doohee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.4 no.2 s.7
    • /
    • pp.33-43
    • /
    • 2005
  • In autumn 2000, the Korea Ministry of Construction and Transportation (MOCT) announced that Daejeon metropolitan city, Jeonju and Jeju were chosen to showcase deployment of Intelligent Transportation Systems(ITS). The program called the Advanced Transportation Systems Model Deployment Initiatives makes a significant step in Intelligent Transportation Infrastructure (In) in Korea. The Initiative is poised to increase the performance and efficiency of the area's roadway and transportation systems to meet growth demand. Three citie's $\$$50 million Model Deployment Initiative project is poised to increase the performance and efficiency of the area's roadway and transportation systems to meet growth demand. The effort particularly focused on the traveler information systems that should raise the level of ITS awareness in Korea. In this paper, project management, funding, private investment, procedures and detailed review of ITS Model Deployment Initiatives are discussed.

  • PDF

Exploratory Factor Analysis of the Causes of Corruption in Iranian Construction Projects (이란 건설 프로젝트의 부패 원인에 대한 탐색적 요인 분석)

  • Kim, Soo Yong;Rad, Kiyanoosh Golchin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.369-376
    • /
    • 2018
  • The majority of construction projects, from the initiation phase to the project completion and operation phase, are influenced by various types of corruption. Iran, as a developing country, has been suffering from this issue in bidding, tendering procedure, contracts etc. Therefore, due to the importance of this issue, this study attempted to identify the causes of corruption and evaluate the most significant factors in the construction projects in Iran. To this aim, an intensive literature review was performed to investigate the various types of corruption and identify the potential factors causing corruption in construction projects. The questionnaire survey was designed, considering twelve forms of corruption, including 77 causes of corruption in construction projects in Iran. Out of 220 distributed questionnaires, 188 were returned by the participants. The valid collected data sets were analyzed and then Exploratory Factor Analysis was applied. It was discovered that "Inappropriate power-sharing," "Lack of obligation for human resources to properly use resources and abide by the rules and regulations" and "Lack of any monitoring of the government's performance" are the most significant factors. Findings from the study would be valuable for the construction projects authorities and academia in order to combat corruption in the construction projects.

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Research on the Normalization Schemes for Insolvent Development Site on Mutual Savings Banks (상호저축은행 부실PF사업장 정상화 방안)

  • Shin, Jong-Chil;Baik, Min-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.195-204
    • /
    • 2015
  • This study analyzed the normalization cases of the mutual savings bank insolvency PF (MSBIPF) to suggest the appropriate improvements according to the purpose. The results were as follows. First, the original intention to normalize the MSBIPF was unsuccessful. This may be caused by the daunting situation of the real estate market along with the complex and shared interests. On the other hand, it can be responsible for the lack of evidence and related regulations as well as the lukewarm attitude on public projects. Active institutional settings are warranted to compensate the remaining insolvent businesses to PF even today and in the future. The data related to the recognized sites as the poorest 32 PF sites was compared primarily to normalize by KAMCO and the relevant sites. The area variable was the only significant variable according to the correlation analysis and logit analysis. The direct investment, diverse PF-backed bonds and the activation of the Ritz can be suggested as alternative ways of normalization with respect to the issue of the KAMCO.

Influencing Factors on the Duration of Offset Agreement (절충교역 계약 소요기간 영향요인)

  • Hong, Seok-Soo;Joung, Tae-Yun;Seo, Jae-Hyun;Hong, Moon-Hee
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.1-15
    • /
    • 2012
  • Republic of Korea has been applying offset to defense acquisition program for some benefits such as modernization of defense industry and enhancement of R&D capabilities since 1983. But in point of implementation, there is the possibility of delay of offset agreements based on the value of proposed technologies. As it often happens that the delay of offset agreement negatively affects the time schedule of main defense deal, it is necessary to prepare for this issue. The purpose of this study is to extract some factors affecting the duration of offset agreement by statistical analysis. Reviewing existing papers and contract process, nationality of enterprise, the number of project participants, properties of project, the number of technologies in the first proposal, level of domestic defense technology in each weapons system, the amount of main contract were used as independent variable and duration of agreement as dependent variable. To hypothesis testing, correlation and multiple regression analysis were conducted using the previous 25 contract cases. As a result of correlation analysis, the amount of main contract, the number of technologies in the first proposal and properties of project have positive relationships with dependent variable. In multiple regression, the amount of main contract and the number of project participants have significant effect on the duration of offset agreement.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.