A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

A Study on the Unfair Aspect of Specific Provisions in the Construction Contract : Counterplan and Institutional Reformation (건설공사 계약서상 불공정특약에 대한 대처방안 및 제도개선에 관한 연구)

  • Choi Jea-Won;Park Keun-Hyung;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.146-153
    • /
    • 2004
  • The purposes of this study are to survey unfair aspects of specific provisions in the construction contract, and to suggest counterplans and institutional reformations. The research method of this study includes judicial precedent analysis and a questionnaire survey, The results of this study are as follows: 1) the main problems of unfair specific provisions are payment condition, shifting of the responsibility and adjustment in the contract sum. 2) counterplans ate suggested according to the construction phase : bid, construction and completion phase. 3) institutional reformations include firming up regulations, supervision, invigoration of claim, development of variation guideline, and so on.

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

A Study about Improvement Idea for Performance-based Project Delivery system (성능발주방식의 개념 정의 및 활용방안에 관한 연구 - 공동주택 성능표시 제도를 바탕으로 한 발주자를 위한 체크리스트 -)

  • Lee, Ha-Seung;Baek, Hun-Ku;Shin, Seung-Ha;Lee, Jung-Won;Kim, Kyung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.634-637
    • /
    • 2008
  • Performance-based Project Delivery System(PPDS) is one of Project Delivery System that when owner ask for performance than constructor feel free to choose materials, technology, an engineering method. PPDS rank higher position than Performance Warranty Contract and Technical Proposal Bid. This study aims to propose Improvement Idea for PPDS that based Housing Performance Grading Indication System. 'Request-performance Checklist' is used as communication means(between owner and constructor) and a kind of corroborative facts make the procedures achievement of project like contract easier.

  • PDF

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.