• Title/Summary/Keyword: 일정 계획 검증

Search Result 96, Processing Time 0.032 seconds

The Development of the Retirement Coaching Model(RE-TIRE) for Effective Retirement Planning (효과적인 은퇴설계를 위한 은퇴코칭모델(RE-TIRE) 개발 연구)

  • Choe, Hyuncha;Cho, Hyejin;Kim, Minjung;Lee, Ji Young;Jang, Younju;Suh, Woo-Kyung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.12
    • /
    • pp.459-470
    • /
    • 2015
  • In this study, we have developed a retirement coaching model for effective retirement planning by applying systematic conversation of the coaching technique. A draft of the retirement coaching model was complemented by the validity verification of experts. The retirement coaching model can be summarized as follows. The first step, rapport and empowerment(RE), consists of sharing the image of a happy retirement after establishing a rapport between the coach and the people wanting to prepare for retirement. The second step, target establishment(T), consists of setting the theme and goals of the conversation. The third step, identification(I), consists of developing a retirement plan for achieving the established goals. The fourth step, realization(R), consists of establishing a concrete schedule and a method of retirement planning. The fifth step, evaluation(E), consists of sharing impressions during coaching sessions, which facilitates future action plans.

Development Process of Application Software for MMIS Simulation Facility (MMIS 모사설비의 응용 소프트웨어 개발 프로세스)

  • 박근옥;이종복;이준구
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.11a
    • /
    • pp.47-51
    • /
    • 2002
  • 전 규모에서 소규모에 이르는 MMIS(Man Machine Interface System) 모사설비는 실제의 원자력발전소에 사용될 MMIS를 응용 소프트웨어로 구동되는 모사환경을 통하여 사전에 시험 및 검증할 목적으로 사용된다. 기존의 MMIS 모사설비 개발은 잘 정의된 개발 프로세스에 기반을 두지 않고 프로젝트 관리자 또는 개발 담당자의 경험과 직관에 의존하여 수행되었다. 이로 인하여 MMIS 모사설비의 개발 일정이 지연되거나 개발의 결과가 초기목표를 만족하지 못하는 불만족 사항이 나타났다. 본 연구는 MMIS 모사설비의 응용 소프트웨어 개발을 위한 프로세스를 정의하고 이에 따라 설비개발을 진행하였다. 개발 프로세서는 계획 단계, 설계 및 구현단계, 시험단계의 세 부분으로 구성하였다. 본 논문에서는 MMIS 모사설비에 요구되는 일반적인 성능특성요건과 개발공정요건을 살펴보고, 본 연구가 정립한 응용 소프트웨어 개발의 프로세스 및 각 프로세서에서의 공정활동을 제시한다.

  • PDF

KARI Planetary Data System for Science Research Support in Korea Pathfinder Lunar Orbiter Program

  • Kim, Joo Hyeon
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.44 no.1
    • /
    • pp.55.3-55.3
    • /
    • 2019
  • 우리나라 최초의 우주탐사 프로그램인 Korea Pathfinder Lunar Orbiter (KPLO)는 1년의 임무기간동안 달과 달 주변의 우주환경에 대한 과학탐사 임무를 수행할 예정이다. 이를 위해서 1개에 기술 검증장비와 고해상도 카메라를 포함한 5개의 과학장비를 탑재할 예정이다. 이 중 고해상도 카메라인 LUTI(LUnar Terrain Imager)와 국내에서 개발한 3개의 과학탑재체(KGRS;감마선분광기, KMAG;자기장측정기, PolCam;광시야 편광카메라)가 획득한 과학자료는 일정기간(통상 1년)동안 비공개로 검보정이 이루어진 후 일반에게 공개(Public release)할 예정이다. 이러한 과학자료의 공개와 관리를 위해서 한국항공우주연구원은 KPLO 심우주 지상시스템 내에 과학자료의 공개 및 관리를 위한 KARI Planetary Data System(KPDS)을 개발하고 있다. KPDS는 미국 NASA의 PDS에서 개발하여 유럽, 일본 등에서 이미 행성탐사 과학자료의 표준으로 활용하고 있는 PDS4 표준을 준수하는 과학자료를 제공할 것이다. 본 발표를 통해서 KPDS의 운영개념과 과학자료 관리계획, 그리고 KPDS의 개발현황을 천문학계와 공유하여 KPLO에 의해서 획득된 과학자료가 많은 과학자들이 활용하여 높은 과학적 성과를 낼 수 있기를 기대한다.

  • PDF

Measurement of flood discharge verification from drones (드론을 활용한 홍수량 검증 측정)

  • Lee, Tae Hee;Lim, Hyeokjin;Kim, Soo Hong;Jung, Sung Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.74-74
    • /
    • 2019
  • 수문조사를 통한 유량자료는 물의 이수, 치수, 환경 등 홍수피해 방지, 수자원의 관리 및 계획을 위한 기초자료로 이용되고 있다. 하지만 예산, 인력, 안전 및 하천공사 등의 문제로 매년 모든 지점에서 유량 측정을 실시하지 못하는 어려움이 있다. 특히 홍수기의 태풍 등 큰 호우사상 발생 시 수위-유량관계 변화 검토가 필요하지만 홍수기 계획지점 이외 지점에서 측정은 위와 같은 문제로 어려움이 있다. 따라서 본 연구에서는 이런 문제점을 개선하기 위해 최소 인력이 단시간 간편하게 드론을 활용하여 유량을 측정할 수 있는 방법을 도입하였다. 드론을 활용한 유량측정방법은 드론 사진측량 개념에서 접근하였으며 드론 사진측량의 정확도는 다양한 분야에서 많은 연구를 통해 입증된 바가 있다. 본 연구의 대상지점은 중랑천 상류에 위치한 의정부시(신곡교) 지점에서 보급형 회전익 드론 (DJI, 팬텀4 pro)을 활용하여 검증 목적을 위해 측정하였다. 유량측정은 드론으로 촬영된 항공사진 상에서 지상에 위치확인 가능한 지상기준점(GCP, Ground Control Point) 4개점을 선점하고 RTK-VRS 장비를 이용하여 측량을 수행하였다. 항공사진 촬영은 드론을 일정높이의 공중에 정지되어 있는 호버링(Hovering) 상태에서 카메라 타임랩스 기능으로 3초 간격 하도 내 수표면을 촬영하였다. 항공사진 수표면에 유하하는 부유물의 3초 간격 이동위치와 GCP 자료를 활용하여 X, Y 좌표 분석을 통해 3초간 이동거리를 표면유속으로 산정하고 통수단면적을 적용하여 유량을 산정하였다. 이와 같이 드론 사진측량으로 산정된 유량과 일반적인 유량측정 방법을 통해 개발된 수위-유량관계곡선식과의 비교를 통해 드론을 활용한 유량측정 방법의 적용성을 확인하였다. 다만, 드론이라는 기계적인 장비의 한계로 야간, 바람 및 강우 등 환경적인 요인에 의해 측정의 제한이 있을 것으로 판단된다.

  • PDF

Reflection Noise Rejection of Ultrasonic Sensor using Scheduling Firing Method (계획송신방법에 의한 초음파 반사노이즈 제거)

  • Jin, Tae-Seok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.1
    • /
    • pp.41-47
    • /
    • 2012
  • In this paper, we proposed a new method which analyzes and eliminates errors occurring by multi-reflection of ultrasonic firing in mobile robot application. This new method allows ultrasonic sensors to fire at rates that are three times faster than those customary in conventional applications readings due to ultrasonic noise disturbance. It is possible them to collect and predict sensor data much faster than conventional methods. Furthermore, this method's capability allows mobile robot to navigate in a complex and unknown environment and to collaborate in the same environment with multiple mobile robot, even if their ultrasonic sensors operate. And it's usefulness to avoid moving obstacles by capability of rapid collecting data. Finally, we present experimental results that demonstrate the performances of the new proposed method by experiments in a multi-reflective environment.

Optimal Weapon-Target Assignment Algorithm for Closed-In Weapon Systems Considering Variable Burst Time (가변 연속사격 시간을 고려한 근접 방어 시스템의 최적 무장 할당 알고리듬)

  • Kim, Bosoek;Lee, Chang-Hun;Tahk, Min-Jea;Kim, Da-Sol;Kim, Sang-Hyun;Lee, Hyun-Seok
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.49 no.5
    • /
    • pp.365-372
    • /
    • 2021
  • This paper deals with an optimal Weapon-Target Assignment (WTA) algorithm for Closed-In Weapon Systems (CIWS), considering variable burst time. In this study, the WTA problem for CIWS is formulated based on Mixed Integer Linear Programming (MILP). Unlike the previous study assuming that the burst time is fixed regardless of the engagement range, the proposed method utilizes the variable burst time based on the kill probability according to the engagement range. Thus, the proposed method can reflect a more realistic engagement situation and reduce the reaction time of CIWS against targets, compared to the existing method. In this paper, we first reformulate the existing MILP-based WTA problem to accommodate the variable burst Time. The proposed method is then validated through numerical simulations with the help of a commercial optimization tool.

Arrangement and analysis of multi-isocenter based on 3-D spatial unit in stereotactic radiosurgery (정위적 방사선 수술시 3차원적 공간상의 체적소에 기반한 회전중심점들(Multi-isocenter)의 표적내 자동적 배치 및 분석)

  • Choi, Kyoung-Sik;Oh, Seung-Jong;Lee, Jeong-Woo;Suh, Tae-Suk;Choe, Bo-Young;Kim, Moon-Chan
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2004.11a
    • /
    • pp.75-77
    • /
    • 2004
  • Stereotactic radiosurgery(SRS) is a technique to deliver a high dose to a particular target region and a low dose to the critical organ using only one or a few irradiations while the patient is fixed with a stereotactic frame. The optimized plan is decided by repetitive work to combine the beam parameters and identify prescribed doses level in a tumor, which is usually called a trial and error method. This requires a great deal of time, effort, and experience. Therefore, we developed the automatic arrangement of multi-isocenter within irregularly shaped tumor. At the arbitrary targets, which is this method based on the voxel unit of the space, well satisfies the dose conformity and dose homogeneity to the targets relative to the RTOG radiosurgery plan guidelines

  • PDF

Priority Selection of Firearms and Ammunition for the Local Reserve Forces using Dynamic Programming (동적계획법에 기반한 지역예비군 총기, 탄약 분배 우선순위 선정에 관한 연구)

  • Cho, Sangjoon;Ma, Jungmok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.67-74
    • /
    • 2020
  • One of the missions of active-duty units in charge of managing reserve forces is providing combat supplies to reserve forces to exercise their combat capabilities quickly when declaring a mobilization order. Rear area active-duty units must support large local reserve forces. On the other hand, military units have difficulties due to a lack of forces and the storage of large quantities of firearms and ammunition. For this reason, local reserve forces should move to an integrated storing place and receive their firearms and ammunition. The existing distribution plan (existing plan) is a first-in-first-out plan that can produce inconsistent distribution orders. The inconsistent distribution orders can increase the complete distribution time, which will affect the combat power of local reserve forces. Therefore, firearms and ammunition should be distributed quickly. Accordingly, this paper proposes the priority selection of firearms and ammunition for local reserve forces with a minimum complete distribution time using Dynamic Programming. To verify the proposed model, the existing plan was compared with the proposed model using real data, and the result showed that the proposed model outperformed the existing plan.

An Analysis on Current Status of Certification for Green Building Revitalization in School - Focused on the School Located in Gyeonggi-do Province - (학교시설의 녹색건축 활성화를 위한 인증현황 분석 연구 - 경기도 학교시설을 중심으로 -)

  • Kim, Jang-Young;Kim, Sung-Joong;Lee, Seung-Min
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.3
    • /
    • pp.9-17
    • /
    • 2015
  • In this paper, there are several analysis on G-SEED, Building Energy Efficiency Rating System, Energy Performance Index, Energy Saving Plan about how they are applied by classification and planning standard. The analysis result found out that G-SEED has low select percentage by having difficulties to managing and additional cost when the each class is selected. And also, Building Energy Efficiency Rating System in school is planed in comparably simple design and similar size and also mostly uses high efficient machines, which was in high lever comparing to the system in facilities in other uses. In the case of EPI, there are differences on acquiring grades by each region. Especially, Gyung-gi region has a low grade on architecture part comparing to other parts, which seems to acquire more grades by strengthen insulation performance. By the result from the three standards, many facilities has only formal plan to pass the required standard without considering specialities of each buildings, which has a tendency to have a pattern to have a minimum criteria. However, School has a symbolic building which has a obligation to be the base of the aim for growing green energy buildings and green education for students. Therefore, planning with understanding of specialities of the facility, having various and rational evaluation standards from the planning of the building is necessary.

A Process-centric Simulation Modeling Method Improving Product, Process, and Facility Information Representation Method (제품, 공정, 설비 정보 표현 방법을 개선한 공정 중심 시뮬레이션 모델링 방법)

  • Baek, Seon-Jung;Oh, Daekyun;Lee, Dong Kun;Lee, Philippe;Ryu, Cheolho;Woo, Jong Hun;Jeong, Yong-Kuk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.4
    • /
    • pp.421-431
    • /
    • 2017
  • A process-centric simulation modeling method has been proposed to define a shipbuilding simulation model. Existing modeling methods have limitations for expressing various production information for a shipyard. The advanced process-centric modeling method proposed in this paper offers an improvement, effectively representing production information and constraints for a shipyard. To achieve this, a method and diagram components to define a process-centric simulation model in detail have been suggested. The modeling method can assign priorities when multiple products and facilities are assigned to the process. And layer concept was applied to express simulation model with hierarchical structure. To verify the effectiveness of the modeling method, comparative analysis has been performed and the actual shipbuilding process has been modeled using the proposed method. When a single facility was used for various purposes, we found that the proposed method was more advantageous than existing methods. As a result, it was possible to express constraints and flows that were difficult to identify with existing process-centric simulation modeling methods, and the methods were improved for use in shipyard production planning verification simulations.