• Title/Summary/Keyword: 인접 시공

Search Result 180, Processing Time 0.023 seconds

Slope Stability due to Additional Embankment (제방 추가성토에 따른 사면안정)

  • Lee, Seung-Hyun;Jang, In-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.7
    • /
    • pp.3232-3236
    • /
    • 2012
  • Consolidation and remedies for slope stability were considered for the slope with additional embankment. Transferred stresses due to additional embankment were assessed by the derived formula based on elasticity theory. Available remedies for slope stability with additional embankment including JSP method, stone column method and EPS method were studied. Caution needed for using JSP method is high pressure which can result in heaving of adjacent soils. Shortages of used case and noise of construction of stone column method are also considered for the safe remedy for slope stability.

A Study on Risk Influence Factors of Ground Subsidence through Soil Investigation Analysis (지반조사 분석을 통한 지반함몰 위험영향인자 연구)

  • Joung, Ho Young;Lee, Gil Hwan
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.1
    • /
    • pp.43-46
    • /
    • 2017
  • Recently, the development of underground space is being actively carried out in the urban area by saturation, and the excavation works are mainly carried out by various excavation methods by the structures adjacent to the ground and underground excavation. During such excavation work, ground subsidence accidents are occurring due to inattention construction, lack of construction technology, and leakage of ground water. For the prevention of ground subsidence we studied the method of risk influence factors by soil investigation. Analysis of 75 sites soil investigation by U.S.C.S (Unified Soil Classification System), construction method, depth of excavation and we studied the risk influence factors with ground subsidence.

Method of Repair Design by Analysis of Damage Mechanism of Elevated Aquaduct (수로교 손상 메커니즘 분석에 의한 보수설계 방법)

  • Lee, Soo-Gon;Byun, Hang-Yong;Song, Chang-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.1
    • /
    • pp.243-250
    • /
    • 2005
  • In elevated irrigation aquaducts, one can observe a common damage pattern. That is, cracks, and crushing of concrete are usually repeated at a certain interval even if no faults are found in the design and construction of the structures. To investigate the causes of this damage, longitudinal deformations of several aquaducts have been measured. The analysis of the measured data suggests that the damages are mainly caused by cumulative repetition of extension and contraction due to temperature changes.

Appropriateness Evaluation of Train Vibration Evaluation Method Considering Vibration Levels of Retaining Wall Adjacent to Railway Tunnels (철도터널과 인접한 흙막이 가시설의 진동 수준을 고려한 열차진동 평가방법의 적정성 평가)

  • Donghee Woo;Yeongjin Lee;Yongjae Song;Kangil Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.10
    • /
    • pp.5-13
    • /
    • 2023
  • With the recent increase in development projects centered on urban areas, the construction of building structures is increasing in areas adjacent to the urban railway operation section. In this case, since ground vibration is generated by the train in operation and affects the adjacent structure, the building structure needs appropriate vibration reduction against train vibration generated at the adjacent location from the desing phase. However, the vibration levels calculated vary depending on the train vibration evaluation method, which means that the implementation of vibration reduction may vary depending on the train vibration evaluation method. Therefore, this study calculated the vibration level according to ground conditions, tunnel depth and separation distance between vibration sources and adjacent structures using numerical analysis and train vibration evaluation methods, and compared them to designning phase. And the appropriate separation distance between the tunnel and the adjacent structure was evaluated by comparing the vibration level with the allowable standards. As a result of the study, the Ungar and Bender evaluation method is evaluated as the most appropriate among the train vibration evaluation methods, and the appropriate separation distance between the tunnel and the adjacent structure is evaluated to be more than 4.5D.

Safety Effect Evaluation of Existing Metro Tunnel by Deep Urban Tunnelling (대심도 도심지 터널시공에 의한 기존 지하철 터널 안전영향 평가)

  • Han, Sang-Min;Lee, Dong-Hyuk;Lee, Sung-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.9
    • /
    • pp.37-50
    • /
    • 2021
  • Recently, due to the expansion of urban infrastructure using underground spaces in urban areas, many adjacent constructions and excavations have been made carried out between existing facilities, and complaints related to the stability of existing facilities due to close construction have become significant issues. In this study, it was closely reviewed for the existing metro tunnel structure in the new Dongbuk urban metro railway to determine the behavioral characteristics of tunnel structure according to adjacent tunnel construction. Also, it was analysed the evaluation of the safety zone and excavation method for metro tunnel structure. And after a detailed damage assessment, track irregularities and structural calculation by using a numerical analysis, stability of the metro tunnel structure according to nearby tunnel excavation was evaluated to be secured for safety. This study is expected to be applied as practical reference to review the evaluation of safety effects of existing tunnel structure and buildings according to adjacent construction in complex deep urban tunnelling.

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.

Assessment of influence of old mine gangway on stability of road tunnel in mine area (광산지역 도로 터널링에 있어 폐갱도가 터널 안정성에 미치는 영향 평가)

  • Synn, Joong-Ho;Shin, Hee-Soon;Sunwoo, Choon;Park, Chan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.123-133
    • /
    • 2002
  • In the construction of the road tunnel in mine area, old mine gangways can cause the instability of the tunnel. In this case study, the field investigation is carried out to figure out the location of old gangways adjacent to the tunnel, and their influence on the tunnel stability is estimated according to the location pattern and rock condition by FLAC analysis. The grouting reinforcement of tunnel crown region and old gangway is suggested and its role on assurance of the tunnel stability is also verified. It can be said from this study that the effect of the old gangway on the stability of tunnel varies with the dimension of gangway, distance from the tunnel, rock condition and groundwater, and therefore these paramerter should be compositively considered in the assessment of the tunnel stability.

  • PDF

A Case Study on the Cause and Reinforcement of Railroad Facilities Settlement According to the Ground Excavation (지반굴착에 따른 철도시설물의 침하 원인 및 보강 사례연구)

  • Oh, Beyung-Sam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.85-94
    • /
    • 2012
  • Recent development trend of construction projects in the urban area is the efficient use of insufficient land, however caused to difficult construction conditions because of many adjacent structures. This paper presents the case study that analyzed the ground settlement of railroad structure for the double track railway project of Gyeongui line, adjacent to the high rise building under ground excavating for substructure work, considering interaction of soft ground characteristics. Field survey and measurement works were carried out during construction of station and excavation of high rise building, and field data were analyzed to find the source of settlement of platform and railway. In addition, the soil reinforcement and foundation restoration were performed using in-situ injection method, i.e., D-ROG(Digitalized Restoring On Grout) method which filled the pore of bottom and around of foundation with micro-cement.

Analysis on the Influence and Reinforcement Effect of Adjacent Pier Structures according to the Underpass Construction (지하차도 시공에 따른 인접 교각구조물 영향 및 보강효과 분석)

  • Lee, Donghyuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.4
    • /
    • pp.29-39
    • /
    • 2022
  • In order to solve the serious traffic congestion in seoul metropolitan city, large-scale underground space development such as underpasses, deep underground roads, and GTX (Great Train eXpress) is being carried out. In order to minimize the impact of the adjacent seoul metro line A pier foundation and stability due to the construction of the underground road in Seoul, earth retaining structures were reinforced and the foundation was reinforced as well. In this study, three-dimensional finite element mehtod analysis was performed to evaluate the effect on adjacent construction and to review the stability of the underpass excavation work. The reinforcement effect was quantitatively analyzed through numerical analysis. As a result of the analysis, compared to the result of performing the existing reinforcement when overlapping CIP and ground reinforcement grouting were performed, the displacement of the earth retaining structures was reduced by more than 50%, and stress of the foundation piles were also reduced by more than 45%. Based on the analysis of the numerical analysis results, it was confirmed that the displacement of the walls of earth retaining structures during adjacent construction should be strictly controlled.

The Comparison of Room Acoustics of Elementary School Classrooms (초등학교 교실의 음환경 비교연구)

  • Moon Kyu-Chun;Park Kye-Kyun;Yeon Chul-Ho;Haan Chan-Hoon
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • autumn
    • /
    • pp.293-296
    • /
    • 2001
  • 1990년대 중반 이후 우리나라 초등학교 교실은 열린교육과 다양성을 추구하는 새로운 열린교실을 표방하고 진행되고 있다. 또한 건축설계에 있어서도 과거의 종합 표준설계에 의하지 않고 각 학교마다 별도의 건축설계에 따라 지어지고 있다. 본 논문의 목적은 현재의 초등학교 교서의 차음환경을 조사하고 새로이 지어진 교사의 교실과 열린교실의 실내 음환경을 조사하여 현재 상황을 분석평가하고 이에 대한 대안을 제시하고자 하는 것이다. 이를 위하여 건축시공연대가 다른 초등학교 3개 학교를 선택하여 단위교실에서의 실내음향인자(RT60, C80, D50, RASTI)와 인접교실과의 차음성능(TL)을 측정하였다. 또한 해당교실의 학생과 교사에 대하여 설문조사를 실시하였다. 각 측정은 외부와 복도에 인접한 창문의 개폐여부와 실내의 위치별로 이루어 졌다. 실험결과, 열린교육에 따라 가변적 교실의 구성은 기존의 교실보다 차음성능이 평균$5\sim6dB$ 낮은 것으로 나타났다. 또한 신축교사의 RASTI값(0.73)이 10년 이상 된 학교(0.70)나 열린교실(0.64)보다 높은 것으로 나타났다. 음성명료도(D50) 역시 일반 신축교사가 열린교실 보다 높게 나타났다. 이것은 실의 기밀과 내부바닥의 마감자재로 비롯되었으며 최근의 열린교실은 음의 차음과 실내명료도에서 열악한 것으로 결론되었다.

  • PDF