• Title/Summary/Keyword: 인접 시공

Search Result 180, Processing Time 0.023 seconds

Study on the Functional Evaluation of Permeable Asphalt Concrete Pavement in Seoul City (서울시 배수성 아스팔트 포장의 기능적 평가 연구)

  • Lee, Sang-Yum;Kim, In-Tae;Mun, Sung-Ho;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.33-39
    • /
    • 2012
  • The functional evaluation of constructed permeable pavements was conducted in terms of water permeable performance and noise reduction measurements in Seoul city. The field measurements of noise was based on two methods such as pass-by and novel close proximity(NCPX). The pass-by test and NCPX method are related to noise propagation and tire/pavement interaction noise measurement, respectively. For the water permeable tests, five sections were chosen; furthermore, the measurements were conducted for both of wheel path and non-wheel path area. For the pass-by measurement, three sections were chosen; furthermore, two different locations, which were near measurement point to traffic noise and far measurement point inside park or hosing complex, were selected for each section. Finally, tire/pavement interaction noise measurements were carried out at four locations. The results show that the functional performance of water permeability and noise reduction was well remained within 2 or 3 years after permeable pavement construction.

A Case Study on Explosive Demolition of Gunsan Steam Power Station in Republic of Korea (군산화력발전소 발파해체 실용화 시험시공 사례)

  • Min, Hyung-Dong;Song, Young-Suk;Kim, Hyo-Jin;Seo, Young-Soo
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.11-21
    • /
    • 2007
  • The main structure of Gunsan steam power station was demolished by the toppling method using high explosives. Height of a main building is 58m and a total floor area is $292,000m^2$. It is Rahmen(rigid-frame) structure consisted of almost columns and beams and slabs exist only in one part of the building for the electricity generators equipments. To improve the efficiency of blasting work, it is separated into 4 sectors. Blasting floors were 1, 2, 3, & 4 stories from first sector to third sector, while 1, 2, 5, & 7 of fourth sector were blasted because it had not slabs. About 102.675 kg of the MegaMITE were used with 225 electric detonator and 638 non-electric detonators to check detonator connection and confidence of detonation. The blasting noise and vibration were monitored to evaluate the environment effect and the damage of the nearby structures.

Behaviors of Joints with Perfobond Rib Shear Connectors in Steel-PSC Hybrid System (Perfobond Rib을 적용한 강-PSC 혼합구조 연결부의 거동 평가)

  • Kim, Sang Hyo;Lee, Chan Goo;Yoon, Ji Hyun;Won, Jeong Hun
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.6
    • /
    • pp.647-657
    • /
    • 2009
  • This paper studies the behavior of joints in steel-PSC (prestressed concrete) hybrid beams, which is necessary for the application of hybrid beams to spliced girder bridges, and proposes a new type of joint with improved construction convenience and structural behavior. In the proposed joint, perfobond rib shear connectors are attached to the upper and lower plates, which are expanded from the steel girders and located between the steel girder and the PSC girder. The experimental tests were performed on hybrid beams with the suggested joint. The results showed that all the beams had similar ultimate strengths and failure modes, due to the failure of their PSC parts. The composite action of the perfobond ribs was verified by examining the initial stiffness and cracks of the test beams. In addition, the test beams showed a higher degree of ultimate strength than the beams with stud shear connectors in the joints that had been previously studied. Thus, the proposed joint is effective for the steel-PSC hybrid beam.

Analysis of Consolidation considering Uncertainties of Geotechnical Parameters and Reliability method (지반특성의 불확실성과 신뢰성 기법을 고려한 압밀해석)

  • Lee, Kyu-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.4
    • /
    • pp.138-146
    • /
    • 2007
  • Geotechnical performance at the soft ground is strongly dependent on the properties of the soil beneath and adjacent to the structure of interest. These soil properties can be described using deterministic and/or probabilistic models. Deterministic models typically use a single discrete descriptor for the parameter of interest. Probabilistic models describe parameters by using discrete statistical descriptors or probability distribution density functions. The consolidation process depends on several uncertain parameters including the coefficients of consolidation and coefficients of permeability in vertical and horizontal directions. The implication of this uncertain parameter in the design of prefabricated vertical drains for soil improvement is discussed. A sensitivity analysis of the degree of consolidation and calculation of settlements to these uncertain parameters is presented for clayey deposits.

A Study on the Prediction of Risk Degree of Side Collapes Due to Excavation (기초굴착에 따른 측면붕괴의 위험성 예측에 관한 연구)

  • 강준묵;한승희;이재기
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.9 no.1
    • /
    • pp.17-25
    • /
    • 1991
  • A foundation excavation is necessarily included in construction works of structures. Involving the dangers of collapse, large-scaled excavation walls require periodic deformation measurements. As only relative displacements and acquired and surface measurements can not be made with the conventional measuring methods, the up-to-date method which can overcome these weaknesses is required urgently. Terrestrial photogrammetry is the method by which absolute deformation amounts of many points can be taken out at a distance from object in short time. The objective of this study is to suggest application propriety of terrestrial photogrammetry to the measurement of excavation walls. For it, we devised same position photography(S.P.P) and possibility of SPP proved through basic experiment. SPP was very speedy photographing method. We found out the fact that as the degree of overlap increase, accuracies of results increase. As a result of applying to excavation side-wall, we detected consistent displacement in 3 dimension each direction within the limits expectional accuracy. If control surveying could be carried out more quickly and accurately, the deformation displacement could be analyzed more effectively.

  • PDF

A Case Study on the Effects on Underground Structure due to Changes in the Groundwater Level and Ground Stress (지반응력 및 지하수위 변화가 지하철구조물 안정성에 미치는 영향 사례연구)

  • Chung, Jeeseung;Lee, Sungil;Lee, Kyuyoung;Jung, Haewook;Kim, Hongjoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.9
    • /
    • pp.13-21
    • /
    • 2015
  • Recently, land subsidence and sinkhole are generated due to a change in the groundwater level in the city. For this reason, the necessity for management of stable underground water level is on the rise. In this study, it was conducted for the underground structure that passes through the lower of bus transfer center construction site to examine the influence on the stability for underground structures to changes in the groundwater level and effective stress, the coupled finite element analysis and structural analyses were performed to evaluate stability for underground structure. It is to secure stability for underground structures according to underground water level declines. In this way, effective construction management will be made by previewing and forecasting the influence on the ground behavior and adjacent structures due to changes in the groundwater level.

Seasonal properties of airborne chlorides to the result of 3 year-measurement (3년간의 측정결과에 따른 비래염분의 계절별 특성)

  • Lee, Jong-Suk;Ahn, Ki-Hong;Kim, Do-Gyeum;Lee, Jang-Hwa
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.573-576
    • /
    • 2008
  • When the concrete structures are in contact with seawater, concentration of chloride for estimating chloride diffusion coefficient can be defined as the chloride concentration of sea water. However, in case the concrete structures, constructed in the seashore, aren't directly in contact with seawater, it is difficult to establish the interface concentration of chloride. In addition, marine concrete structures are greatly affected by salt attack such as rebar corrosion, among the cause of salt attack, airborne chlorides is primary factor. Therefore, in this study, salt attack environment by airborne chlorides was investigated in terms of a seasonal distribution at 72 spots, 27 areas in the East, West, South coast for 3 years from July '03 to June '06. Results indicated that in the East and South coast, the amount of the airborne chlorides is comparatively higher in summer, in the West coast, higher in winter according to the seasonal wind.

  • PDF

Dynamic Analysis of Long-span Arch Bridge by Fracturing Hangers (장대 아치교 행어 파단에 의한 동적 해석)

  • Yhim, Sung-Soon;Kong, Min-Sik;Yoo, Yi-Seul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.113-120
    • /
    • 2010
  • Recently, various evaluations concerning structural stability under construction step and completely constructed step have been executed during a Long-span Arch Bridge designing procedure. However, the breakage of cable-hangers of arched bridge in unexpected accident or periodic cable-replacement has not been considered. Therefore, the purpose of this study is that analyzing structural safety of arched bridge when the cable-hangers being fractured by that reasons. Dynamic analysis are performed by idealizing impact load to three types of impact functions as fracturing the cables. Consequently, when the hangers are fractured, the maximum tensile force by dynamic analysis is larger than those by static analysis. Therefore, the dynamic analysis is demanded to accurately obtain the responses for the structural stability with a realistic impact loading model in the breakage and replacement of cable hangers of long-span arched bride. Moreover, the analysis method and results in this study can be used to basic criteria in design.

Experimental Analysis of Prestressed Approach Slab Behavior (프리스트레스가 도입된 접속슬래브의 실험적 거동 분석)

  • Park, Hee-Beom;Eum, In-Sub;Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.157-164
    • /
    • 2010
  • This research was conducted to analyze the behavior of Single-PTAS (Single Post-Tensioned Approach Slab) under tensioning and environmental loads by performing field tests when the demonstration Single-PTAS was being constructed. The temperature measurement sensors were installed at different depths, and the displacements in the approach slab under environmental loads and tensioning were measured using displacement transducers. As an experimental result, an abrupt change in the longitudinal displacement due to tensioning was not observed. The daily temperature change in the approach slab was negligible where the depth is over about 35cm. The temperature gradient in the approach slab adjacent to bridge was smaller than that adjacent to pavement. The patterns and magnitudes of vertical displacements were directly related to the temperature gradient at the measuring location. The behavior of Single-PTAS was very similar to that of concrete pavement. Therefore, a new design methodology for approach slabs is needed to include the pavement concept and to overcome drawback of current design procedures based on the simple beam concept.

A Case Design of a Tunnel Passing Under an Adjacent Unlined Tunnel Designated As a Cultural property (문화재로 지정된 무라이닝 암반터널 하부통과 설계사례)

  • Kim, Seon-Hong;Jeong, Dong-Ho;Seok, Jin-Ho;Park, Myoung-Lyul
    • Tunnel and Underground Space
    • /
    • v.17 no.2 s.67
    • /
    • pp.152-164
    • /
    • 2007
  • Recently as increasing the amounts of cargoes and passengers, it is necessary to improving railway capacity and speed. So the constructions of improving the existing railway line have been advanced. Sometimes the new railway tunnel is built to adjacent the existing railway line. Furthermore the new tunnel might be built near the existing facility within the tunnel width. In this case, it should be analyzed the influence of existing tunnel and if it is necessary, it should be taken the appropriate counterplan. The major analysis contents are follows. One is the influence on the existing tunnel by a blasting and train vibration and the other is stability problem of the existing tunnel by excavation of new tunnel. Therefore, we peformed the following analysis. Refer to a domestic and foreign standard and paper, the permitting level of blasting vibration is decided and the excavation plan of the new tunnel are designed. The numerical analysis is performed about the stability of the existing tunnel and new tunnel. The influence of the train vibration on tunnel is analyzed by the empirical equation.