• Title/Summary/Keyword: 인가하중

Search Result 59, Processing Time 0.033 seconds

Phase Transformation of Silicon by Indentation (압입법에 의한 실리콘의 상전이)

  • Kim, Sung-Soon;Lee, Hong-Lim
    • Journal of the Korean Ceramic Society
    • /
    • v.39 no.12
    • /
    • pp.1149-1152
    • /
    • 2002
  • Indentation was used to analyze high pressure phases of silicon. Phase transformations on both loading time and loading rate were studied. Micro-raman spectroscopy was used to observe the indentation-induced transformations. As the loading time increased, Si-III and Si-XII disappeared and only a-Si was observed in (111) samples. As the loading time increased, the residual stress was removed by creation of cracks or dislocations. At 0.1 mm/min loading rate, pop-in . At 5 mm/min loading rate pop-in was observed in force/displacement curve of (111) sample, but pop-in was not observed in force/displacement curve of (100) sample. This result indicates that the loading rate affects the volume of phase transformation in silicon.

Changes in Corrosion Progress and Ultimate load of Tendon Under 20% and 40% of Ultimate Loading Conditions (파괴하중의 20% 및 40% 인장조건에서 텐던 부식 진행 및 파괴하중 변화)

  • Ryu, Hwa-Sung;An, Gi Hong;Hwang, Chul-Sung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.47-52
    • /
    • 2017
  • PSC (Prestressed Concrete) structures have been used widely for its engineering advantage with using total concrete area as effective compressive section. However tendon inside is exposed to such a high tensile stress that and more attentions should be paid for corrosion control. This work is for changing corrosion current and ultimate strength in tendon with increasing prestressing force in a constant corrosive condition. With increasing prestressing force, corrosion current, corrosion amount, and ultimate load are changed linearly. When prestressing force increases from 20.0 % to 40.0 %, corrosion current increases to 124.4 % and 168.0 % and ultimate load decreases to 87.8 % and 78.4 %, respectively. With inducing constant electrical potential, increasing corrosion current and reduction of strength are evaluated to be linearly related with increasing prestressing load.

A Study on the Fundamental Performance of Electric-driven Bollard (전동식 볼라드의 기본 성능에 관한 연구)

  • Park, Tae-Joon;Jung, Byeong-Gyu;Lee, Kee-Man
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.13 no.4
    • /
    • pp.169-173
    • /
    • 2011
  • This study is about the development of remote controlled bollard using the BLDC motor and ball screw with mechatronics theory. A bollard is composed of the sensor part and the control part. The sensor part is consisted of sensors that detect the locations of a bollard. The role of the control part is adjusting motor speed and power through variable resistance. In order to confirm required performance, the speed of decent and ascent of the bollard, the time and the RPM of BLDC motor were tested according to the variable resistance and the applied load with 10 to $72kg_f$.

Chloride Extraction and Modified Structural Behavior of Concrete under Electrochemical Treatment (전기방식에 따른 콘크리트 중의 탈염효과 및 구조거동)

  • Ann, Ki-Yong;Kim, Ki-Beom;Yang, Hee-Jun
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.109-116
    • /
    • 2017
  • The present study concerns quantitative assessment of chloride extraction, repassivation and structural behavior of concrete. Concrete specimen ($160{\times}160{\times}1000mm$) was fabricated with 3 steel bar located in the middle with 20 mm of the cover depth, containing 5.0% of chloride to accelerate corrosion process, then to be subjected to electrochemical treatment. The current density accounted for $750mA/m^2$ at 2, 4 and 8 weeks. As a result, it was found that an increase in the duration of the treatment resulted in an increase in the chloride extraction, accounting for 64.7-83.7% for the specimen at 8 weeks treatment. It implies that a portion of bound chlorides would turn free to be removed, considering the binding capacity of cement about 50-60% to total ones. Even after the treatment, the corrosion was still active; the corrosion rate was $6.5mA/m^2$ and 330 mV vs. SCE in the potential. For structural behavior, the maximum load was increased by corrosion on the steel bars, which was subsequently lowered by the treatment, but still higher than for control.

A method to analyze the strength of bridge in IPM type permanent magnet motor considering the effect of mechanical fatigue characteristic (피로한계를 고려한 IPM타입 영구자석 전동기 Bridge부 구조 해석 방법)

  • Kang, Kyong-Ho;Yu, Suk-Jin;Ahn, Hyo-Chul;Kim, Ji-Hyun;Jung, Sang-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.999-1000
    • /
    • 2011
  • 영구자석을 삽입하는 IPM(Interior Permanent Magnet : 이하 IPM) 방식의 동기전동기 설계에서 브리지의 형상 결정은 기계적인 안정성을 확보하고 출력 요구사양을 만족시키기 위해 구조해석과 자기회로 해석을 병행하여 검토하는 것을 요구한다. 본 논문에서는 IPM타입 동기전동기를 대상으로 회전자 원심력이 정적상태로 인가되는 정하중 조건과 속도변화가 시간에 따라 변하는 동하중 조건일 경우를 구분하여 설계 여유를 분석하였으며, 영구자석의 접착여부에 따라 브리지에 발생하는 응력 분포의 차이를 해석하였다. 또한, 동하중 상태에서 재료의 응력-피로 특성을 통해 피로 한계 조건을 설계단계에서 예측하였다.

  • PDF

Analysis of Dynamical State Transition and Effects of Chaotic Signal in Cyclic Neural Network (순환결합형 신경회로망의 동적 상태천이 해석과 카오스 신호의 영향)

  • 김용수;박철영
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2002.12a
    • /
    • pp.199-202
    • /
    • 2002
  • 신경회로망을 동적 정보처리에 응용하기 위해서는 비대칭 결합 신경회로망에서 생성되는 동적 상태천이에 관한 직관적 이해가 필요하다. 자기결합을 갖고 결합하중치가 비대칭인 순환결합형 신경회로망은 복수 개의 리미트사이클이 기억 가능하다는 것이 알려져 있다. 현재까지 이산시간 모델의 네트워크에 대한 상태천이 해석은 상세하게 이루어져 왔다. 그러나 연속시간 모델에 대한 해석은 네트워크 규모의 증가에 따른 급격한 계산량의 증가 때문에 연구가 그다지 활발하게 이루어지지 않고 있다. 본 논문에서는 각 뉴런이 최근접 뉴런에만 이진화된 결합하중 +1 및 -1로 연결된 연속시간모델 순환결합형 신경회로망의 동적인 상태천이 특성을 해석하여 이산시간 모델에서 기억 가능한 리미트사이클과의 차이점을 분석한다. 또한 연속시간 네트워크 모델에 카오스 신호를 인가하여 리미트사이클간의 천이를 제어할 수 있는 가능성을 분석하여 동적정보처리에 네트워크를 응용할 수 있는 가능성을 검토한다.

Analysis of the PZT trasducer's response for the transient elastic waves (과도탄성파에 대한 PZT 변환자의 응답특성 해석)

  • 배종성
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • 1998.06d
    • /
    • pp.9-12
    • /
    • 1998
  • 공기경계층을 갖는 유리평판에서 힘의 크기가 10N이고 상승시간이 약 280ns 인 경사 점하중이 인가된 경우에 대하여 진앙점에서 입자 변위와 입자 속도를 계산하였다. 이론적으로 계산된 수직성분이 입자속도가 PZT변환자에 입사한다고 가정하여 PZT 변환자의 과도 응답특성을 Mason 등가회로와 격자점을 이용하여 계산하였다. 유리모세관의 파과시에 방출괴는 과도탄성파를 이용하여 유리평판의 진앙점에서 PZT 변환기의 응답을 조사하였고, 이론과 비교한 결과 상당히 일치하였다. 이를 이용하여 음향방출 시스템인 발생원, 전파매질, 변환자 및 신호분석시스템을 수학적으로 모형화할 수 있는 기초를 마련하였다.

  • PDF

Mechanical Damage Behavior of Single Crystalline Silicon by Scratching Test (Scratching Test에 의한 단결정 실리콘의 기계적 손상거동)

  • 김현호;정성민;이홍림
    • Journal of the Korean Ceramic Society
    • /
    • v.40 no.1
    • /
    • pp.104-108
    • /
    • 2003
  • COF(Coefficient Of Friction), AE(Acoustic Emission), micro-cracks and crystal structure of the single crystalline silicon were investigated according to the induced normal load during scratching test. Scratching tests were performed with the loading rate of 100 N/min and various scratching speeds of 1, 3, 6, 10 mm/min from 0 up to 30 N of the maximum normal load. In consequence, COF, AE and crack density were observed to increase with increasing normal load or increasing scratching speed. Phase transformations from the silicon diamond structure to other structures were observed in the scratched grooves for the slow scratching speeds using micro-Raman spectroscopy.

Development of Full-Scale Static Test System for Aircraft Sensor Pod (항공용 센서 포드의 정적 구조시험장비 개발)

  • Jae Myung Cho;Hoon Hyuk Park;Won Woong Lee;Jong In Bae;Han Sol Lee;Eui Hwan Oh
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.1
    • /
    • pp.97-105
    • /
    • 2023
  • For aviation sensor pod, structural integrity should be verified through static structural tests for flight loads induced in various maneuvering conditions of the aircraft. For this, it is necessary to develop a test system for full-scale static load test of sensor pod. Based on test requirements, this paper introduced a test system configuration of the static test and the development of test structure frame, restraints equipment, loading equipment, control, and measurement equipment. In addition, methods and procedures for verifying the developed test system were explained. In conclusion, the static load test and data acquisition were successfully performed. Reliability of the test equipment was also verified in the process.