• Title/Summary/Keyword: 이산최적설계

Search Result 147, Processing Time 0.026 seconds

DEVS-based Modeling Simulation for Semiconductor Manufacturing Using an Simulation-based Adaptive Real-time Job Control Framework (시뮬레이션 기반 적응형 실시간 작업 제어 프레임워크를 적용한 웨이퍼 제조 공정 DEVS 기반 모델링 시뮬레이션)

  • Song, Hae-Sang;Lee, Jae-Young;Kim, Tag-Gon
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.3
    • /
    • pp.45-54
    • /
    • 2010
  • The inherent complexity of semiconductor fabrication processes makes it hard to solve well-known job scheduling problems in analytical ways, which leads us to rely practically on discrete event modeling simulations to learn the effects of changing the system's parameters. Meanwhile, unpredictable disturbances such as machine failures and maintenance diminish the productivity of semiconductor manufacturing processes with fixed scheduling policies; thus, it is necessary to adapt job scheduling policy in a timely manner in reaction to critical environmental changes (disturbances) in order for the fabrication process to perform optimally. This paper proposes an adaptive job control framework for a wafer fabrication process in a control system theoretical approach and implements it based on a DEVS modeling simulation environment. The proposed framework has the advantages in view of the whole systems understanding and flexibility of applying new rules compared to most ad-hoc software approaches in this field. Furthermore, it is flexible enough to incorporate new job scheduling rules into the existing rule set. Experimental results show that this control framework with adaptive rescheduling outperforms fixed job scheduling algorithms.

Development of Sensor Network Simulator for Estimating Power Consumption and Execution Time (전력소모량 및 실행시간 추정이 가능한 센서 네트워크 시뮬레이터의 개발)

  • Kim, Bang-Hyun;Kim, Tae-Kyu;Jung, Yong-Doc;Kim, Jong-Hyun
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.1
    • /
    • pp.35-42
    • /
    • 2006
  • Sensor network, that is an infrastructure of ubiquitous computing, consists of a number of sensor nodes of which hardware is very small. The network topology and routing scheme of the network should be determined according to its purpose, and its hardware and software may have to be changed as needed from time to time. Thus, the sensor network simulator being capable of verifying its behavior and estimating performance is required for better design. Sensor network simulators currently existing have been developed for specific hardwares or operating systems, so that they can only be used for such systems and do not provide any means to estimate the amount of power consumption and program execution time which are major issues for system design. In this study, we develop the sensor network simulator that can be used to design and verify various sensor networks without regarding to types of applications or operating systems, and also has the capability of predicting the amount of power consumption and program execution time. For this purpose, the simulator is developed by using machine instruction-level discrete-event simulation scheme. As a result, the simulator can be used to analyze program execution timings and related system behaviors in the actual sensor nodes in detail. Instruction traces used as workload for simulations are executable images produced by the cross-compiler for ATmega128L microcontroller.

  • PDF

Optimal-synchronous Parallel Simulation for Large-scale Sensor Network (대규모 센서 네트워크를 위한 최적-동기식 병렬 시뮬레이션)

  • Kim, Bang-Hyun;Kim, Jong-Hyun
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.35 no.5
    • /
    • pp.199-212
    • /
    • 2008
  • Software simulation has been widely used for the design and application development of a large-scale wireless sensor network. The degree of details of the simulation must be high to verify the behavior of the network and to estimate its execution time and power consumption of an application program as accurately as possible. But, as the degree of details becomes higher, the simulation time increases. Moreover, as the number of sensor nodes increases, the time tends to be extremely long. We propose an optimal-synchronous parallel discrete-event simulation method to shorten the time in a large-scale sensor network simulation. In this method, sensor nodes are partitioned into subsets, and each PC that is interconnected with others through a network is in charge of simulating one of the subsets. Results of experiments using the parallel simulator developed in this study show that, in the case of the large number of sensor nodes, the speedup tends to approach the square of the number of PCs participating in the simulation. In such a case, the ratio of the overhead due to parallel simulation to the total simulation time is so small that it can be ignored. Therefore, as long as PCs are available, the number of sensor nodes to be simulated is not limited. In addition, our parallel simulation environment can be constructed easily at the low cost because PCs interconnected through LAN are used without change.

Impact of Sulfur Dioxide Impurity on Process Design of $CO_2$ Offshore Geological Storage: Evaluation of Physical Property Models and Optimization of Binary Parameter (이산화황 불순물이 이산화탄소 해양 지중저장 공정설계에 미치는 영향 평가: 상태량 모델의 비교 분석 및 이성분 매개변수 최적화)

  • Huh, Cheol;Kang, Seong-Gil;Cho, Mang-Ik
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.13 no.3
    • /
    • pp.187-197
    • /
    • 2010
  • Carbon dioxide Capture and Storage(CCS) is regarded as one of the most promising options to response climate change. CCS is a three-stage process consisting of the capture of carbon dioxide($CO_2$), the transport of $CO_2$ to a storage location, and the long term isolation of $CO_2$ from the atmosphere for the purpose of carbon emission mitigation. Up to now, process design for this $CO_2$ marine geological storage has been carried out mainly on pure $CO_2$. Unfortunately the $CO_2$ mixture captured from the power plants and steel making plants contains many impurities such as $N_2$, $O_2$, Ar, $H_2O$, $SO_2$, $H_2S$. A small amount of impurities can change the thermodynamic properties and then significantly affect the compression, purification, transport and injection processes. In order to design a reliable $CO_2$ marine geological storage system, it is necessary to analyze the impact of these impurities on the whole CCS process at initial design stage. The purpose of the present paper is to compare and analyse the relevant physical property models including BWRS, PR, PRBM, RKS and SRK equations of state, and NRTL-RK model which are crucial numerical process simulation tools. To evaluate the predictive accuracy of the equation of the state for $CO_2-SO_2$ mixture, we compared numerical calculation results with reference experimental data. In addition, optimum binary parameter to consider the interaction of $CO_2$ and $SO_2$ molecules was suggested based on the mean absolute percent error. In conclusion, we suggest the most reliable physical property model with optimized binary parameter in designing the $CO_2-SO_2$ mixture marine geological storage process.

A Study on the Site Selection Method for the Creation of a Flood Buffer Section Considering the Nature-based Solution - Case Study from Upstream of Daecheong Dam to Downstream of Yongdam Dam (자연성기반기술의 홍수완충구간 조성을 위한 입지 선정 방법에 관한 연구 - 대청댐 상류부터 용담댐 하류구간 사례 연구)

  • Ji, Un;Jang, Eun-kyung;Bae, Inhyeok;Ahn, Myeonghui;Bae, Jun
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.3
    • /
    • pp.131-140
    • /
    • 2022
  • The magnitude and frequency of extreme floods are increasing owing to the effects of climate change. Therefore, multipurpose flood management techniques incorporating nature-based solutions have been introduced to mitigate the limitations of flood management and river design methods relying on existing observation data. Nature-based solutions to prepare for such extreme flooding events include ways to retreat the embankment, expand the floodplain, and reduce flood damage. To apply these technologies, adopting appropriate location selection methods based on various evaluation factors, such as flood damage reduction effects, sustainable ecological environments, river connectivity, and physical channel structure enhancements, should be prioritized. Therefore, in this study, the optimal location for implementing the multipurpose floodplain construction project was determined by selecting the location of the floodplain expansion with objectivity in the river waterfront area upstream of Daecheong Dam to downstream of Yongdam Dam. Through the final location determination, the Dongdaeje and Jeogokje sections were included in the optimal location considering both flood damage reduction and water environment improvement.

Wave Analysis and Spectrum Estimation for the Optimal Design of the Wave Energy Converter in the Hupo Coastal Sea (파력발전장치 설계를 위한후포 연안의 파랑 분석 및 스펙트럼 추정)

  • Kweon, Hyuck-Min;Cho, Hongyeon;Jeong, Weon-Mu
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.3
    • /
    • pp.147-153
    • /
    • 2013
  • There exist various types of the WEC (Wave Energy Converter), and among them, the point absorber is the most popularly investigated type. However, it is difficult to find examples of systematically measured data analysis for the design of the point absorber type of power buoy in the world. The study investigates the wave load acting on the point absorber type resonance power buoy wave energy extraction system proposed by Kweon et al. (2010). This study analyzes the time series spectra with respect to the three-year wave data (2002.05.01~2005.03.29) measured using the pressure type wave gage at the seaside of north breakwater of Hupo harbor located in the east coast of the Korean peninsula. From the analysis results, it could be deduced that monthly wave period and wave height variations were apparent and that monthly wave powers were unevenly distributed annually. The average wave steepness of the usual wave was 0.01, lower than that of the wind wave range of 0.02-0.04. The mode of the average wave period has the value of 5.31 sec, while mode of the wave height of the applicable period has the value of 0.29 m. The occurrence probability of the peak period is a bi-modal type, with a mode value between 4.47 sec and 6.78 sec. The design wave period can be selected from the above four values of 0.01, 5.31, 4.47, 6.78. About 95% of measured wave heights are below 1 m. Through this study, it was found that a resonance power buoy system is necessary in coastal areas with low wave energy and that the optimal design for overcoming the uneven monthly distribution of wave power is a major task in the development of a WEF (Wave Energy Farm). Finding it impossible to express the average spectrum of the usual wave in terms of the standard spectrum equation, this study proposes a new spectrum equation with three parameters, with which basic data for the prediction of the power production using wave power buoy and the fatigue analysis of the system can be given.

The Optimal Operation on Auxiliary Spillway to Minimize the Flood Damage in Downstream River with Various Outflow Conditions (하류하천의 영향 최소화를 위한 보조 여수로 최적 활용방안 검토)

  • Yoo, Hyung Ju;Joo, Sung Sik;Kwon, Beom Jae;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.2
    • /
    • pp.61-75
    • /
    • 2021
  • Recently, as the occurrence frequency of sudden floods due to climate change increased and the aging of the existing spillway, it is necessary to establish a plan to utilize an auxiliary spillway to minimize the flood damage of downstream rivers. Most studies have been conducted on the review of flow characteristics according to the operation of auxiliary spillway through the hydraulic experiments and numerical modeling. However, the studies on examination of flood damage in the downstream rivers and the stability of the revetment according to the operation of the auxiliary spillway were relatively insufficient in the literature. In this study, the stability of the revetment on the downstream river according to the outflow conditions of the existing and auxiliary spillway was examined by using 3D numerical model, FLOW-3D. The velocity, water surface elevation and shear stress results of FLOW-3D were compared with the permissible velocity and shear stress of design criteria. It was assumed the sluice gate was fully opened. As a result of numerical simulations of various auxiliary spillway operations during flood season, the single operation of the auxiliary spillway showed the reduction effect of maximum velocity and the water surface elevation compared with the single operation of the existing spillway. The stability of the revetment on downstream was satisfied under the condition of outflow less than 45% of the design flood discharge. However, the potential overtopping damage was confirmed in the case of exceeding the 45% of the design flood discharge. Therefore, the simultaneous operation with the existing spillway was important to ensure the stability on design flood discharge condition. As a result of examining the allocation ratio and the total allowable outflow, the reduction effect of maximum velocity was confirmed on the condition, where the amount of outflow on auxiliary spillway was more than that on existing spillway. It is because the flow of downstream rivers was concentrated in the center due to the outflow of existing spillway. The permissible velocity and shear stress were satisfied under the condition of less than 77% of the design flood discharge with simultaneous operation. It was found that the flood damage of downstream rivers can be minimized by setting the amount allocated to the auxiliary spillway to be larger than the amount allocated to the existing spillway for the total outflow with simultaneous operation condition. However, this study only reviewed the flow characteristics around the revetment according to the outflow of spillway under the full opening of the sluice gate condition. Therefore, the various sluice opening conditions and outflow scenarios will be asked to derive more efficient utilization of the auxiliary spillway in th future.