• Title/Summary/Keyword: 유지보수공사 업무프로세스

Search Result 6, Processing Time 0.019 seconds

Development of Nexus for BIM and Documents based on Maintenance Process (유지보수공사 프로세스기반 BIM-문서 넥서스 구축)

  • Han, Ji-Ho;Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

Basic Study of the Improvement of Maintenance Process for Efficient Highway Pavement Management (효율적인 고속도로 포장유지관리를 위한 유지관리프로세스 개선방안 기초연구)

  • Park, Jong-Beom;Lee, Yong-Jun;Lee, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6932-6942
    • /
    • 2014
  • The expressway is a key area of road networks for national industry, economics and social development. In addition, the number of lines are increasing continuously. Recently, road management policy have shown a paradigm shift to safe road, low-carbon and green etc. Nevertheless, the road condition has deteriorated dramatically by fatigue cracking, thermal cracking and weather impact. On the other hand, the budgets for highway maintenance have shrunk dramatically. In this study, an effective pavement management and maintenance process was developed to extend the pavement serviceability and pavement life to overcome the rack of budgets.

A Study on the Definition of the Educational Facility Maintenance (교육시설물 유지관리 업무규명에 관한 연구)

  • Shon Woo-Kyung;Kim Jang-Young;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.567-570
    • /
    • 2002
  • our country school construction from 1990 year middle the facility expension for the improvement or education environment and the maintenance expense of various conservative construction for old education facilities is increasing. It accomplishes the each subject wild for business which maintains the training facility enterprise to be, the minute paragraph of information and deficient standard of information. It brings about the duplication investment a waste of the revenue source which is limited. Occurrence information which it follows consequently in business process and requirement must clear. We the maintenance phase of the education facilities understand, problem point and obstacle VIP analysis it leads it presents it does analyze. The improvement process model which leads a hereafter function for obstacle VIP extraction and information model construction must be accomplished.

  • PDF

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF