• Title/Summary/Keyword: 유지관리비용모델

Search Result 226, Processing Time 0.035 seconds

Probabilistic Analysis of Repairing Cost Considering Random Variables of Durability Design Parameters for Chloride Attack (염해-내구성 설계 변수에 변동성에 따른 확률론적 보수비용 산정 분석)

  • Lee, Han-Seung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.32-39
    • /
    • 2018
  • Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.

Development of Web-based Facility Management System by utilizing Information in Construction Phase (시공단계 정보 활용을 통한 웹 기반 유지관리 시스템 개발)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.99-106
    • /
    • 2004
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility, Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from an asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

Cost-benefits Based Resource Management Scheduling Model using Hierarchical Load Balancing Policy in Cloud Computing Environment (클라우드 컴퓨팅 환경에서 계층형 부하 분산정책을 이용한 비용이익 기반 자원관리 스케줄링 모델)

  • Jo, Dong-Wook;Kim, Jae-Kwon;Kim, Tae-Young;Oh, Hyun-Chang;Lee, Suk-Woo;Lee, Jong-Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • 클라우드 환경을 구성하는 자원을 능동적으로 사용 하기 위해서는 부하분산 정책이 필요하며 효율적으로 작업을 할당하고 공유할 수 있는 자원 관리 스케줄링이 필요하다. 또한 자원의 경제성을 유념하여 클라우드 서비스 제공자의 이익 창출과 자원 활용도의 개선을 실현해야하고 서비스 사용자의 만족도를 향상시켜야 한다. 본 논문에서는 계층형 부하분산 정책을 이용한 비용이익 기반 자원관리 스케줄링 모델(Cost-benefits Based Resource Management Scheduling Model using Hierarchical Load Balancing Policy)을 제안한다. 제안하는 모델은 계층형 부하분산 정책을 적용하여 자원을 통합, 관리함으로서 개선된 유지보수성을 제공하며, 서비스 제공자의 비용이익을 고려하여 각 자원들마다의 자원협상 메커니즘과 비용이익을 우선으로 하는 가격 결정 알고리즘을 제공하여 합리적인 자원 할당이 가능하다.

A Study on Maintenance Cost Model for Establishing a Strategies of Port Facility Maintenance (항만시설 유지관리 전략수립을 위한 비용모델연구)

  • Park, Miyun;Lee, Jeonghun;Park, Sangwoo;Lim, Jonggwon
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.2
    • /
    • pp.276-290
    • /
    • 2020
  • Purpose: The construction history of domestic port facilities has been more than 100 years, and until recently, modern facilities have been continuously built and expanded. However, it is not easy to keep the required performance conditions at the time of initial construction due to changes in the marine environment and increase in volume. In particular, in the case of harbor structures that have a long service life, safety performance and function management are becoming very important due to the increase in the size of ships, the increasing frequency of use, and the increase in the scale of natural disasters. Method: Therefore, this study investigates the state change by structural type of port facilities and analyzes the rehabilitation activities and the history that contribute to the performance improvement and life extension activities. Result: Through this, we distinguished between performance improvement cost (CAPEX) and repair maintenance activity (OPEX) that can be used to establish port facility maintenance strategy, and suggested cost model that can be used to establish maintenance strategy. Conclusion: These studies are expected to contribute greatly to mid- to long-term investment decisions.

The Model to Generate Optimum Maintenance Scenario for Steel Bridges considering Life-Cycle Cost and Performance (강교량의 최적 유지관리 시나리오 선정 모델)

  • Park, Kyung Hoon;Lee, Sang Yoon;Kim, Jung Ho;Cho, Hyo Nam;Kong, Jung Sik
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.677-686
    • /
    • 2006
  • In this paper, a more practical and realistic method is proposed to establish the lifetime optimum maintenance strategies of the deteriorating bridges considering the life-cycle performance as well as life-cycle cost. The genetic algorithm is applied to generate the set of maintenance scenarios that is the multi-objective combinatorial optimization problem related to lifetime performance and cost as separate objective functions, and the technique to select optimum tradeoff maintenance scenario is presented. Optimum maintenance scenarios could be generated not only at the individual member level but also at the system level of the bridge. Through the analytical results of applying the proposed methodology to the existing bridge, it is expected that the methodology will be effectively used to determine the optimum maintenance strategy for introducing a real preventive maintenance system and overcoming the limits of existing maintenance methods.

Basic Study for Development of Risk Based Bridge Maintenance Priority Decision Model (위험도기반 교량 유지관리 우선순위 선정 모델 개발을 위한 기초연구)

  • Kim, Dongiin;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.108-116
    • /
    • 2017
  • It is expected that the maintenance cost of domestic bridges will increase considerably due to the increase of bridge service time. In response to this situation, the government and relevant ministries are focusing on developing ways to efficiently allocate limited budgets and to rationally select maintenance bridge. In this study, to develop a risk - based bridge maintenance priority decision model, 14 common risk factors causing damage to bridges were extracted and AHP analysis was performed to select 5 important factors. Based on the existing literature review and expert consultation, we derive the evaluation criteria and the impact weights of the selected factors, and based on this, I presented risk based bridge maintenance priority model. Using this model in combination with existing maintenance priority methods will lead to more reasonable bridge maintenance priorities.

A Study on the Definition of the Educational Facility Maintenance (교육시설물 유지관리 업무규명에 관한 연구)

  • Shon Woo-Kyung;Kim Jang-Young;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.567-570
    • /
    • 2002
  • our country school construction from 1990 year middle the facility expension for the improvement or education environment and the maintenance expense of various conservative construction for old education facilities is increasing. It accomplishes the each subject wild for business which maintains the training facility enterprise to be, the minute paragraph of information and deficient standard of information. It brings about the duplication investment a waste of the revenue source which is limited. Occurrence information which it follows consequently in business process and requirement must clear. We the maintenance phase of the education facilities understand, problem point and obstacle VIP analysis it leads it presents it does analyze. The improvement process model which leads a hereafter function for obstacle VIP extraction and information model construction must be accomplished.

  • PDF

Design of SOC Asset Management Information System (공공시설물 자산관리 정보시스템 설계 방안 연구)

  • Nah, hei-sook;Choi, won-sik;Seo, myoung-bae;Lim, jong-tae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2011.05a
    • /
    • pp.489-490
    • /
    • 2011
  • 사회기반 시설물들의 노후화로 유지보수 비용이 급격하게 증가하고 있는 선진국뿐만 아니라 국내에서도 시설물을 체계적으로 관리하여 안전사고를 예방하고 유지관리 예산을 절감하고자 하는 관심이 날로 증대하고 있다. 해외의 뉴질랜드, 호주, 캐나다, 미국, 영국 등의 나라에서는 공공시설물 유지관리에 자산개념을 도입하여 관련 법과 제도를 정비하고 대웅적 유지관리방식보다 자산의 가치 중심의 예방적 유지관리로 전환하여 일정 부분 성과를 내고 있다. 국내에서도 시설물을 체계적으로 관리하여 안전사고를 예방하고 유지관리 예산을 절감하고자 하는 관심이 날로 증대하고 있다. 이에 IIMM의 자산관리 업무절차 모델과 국내에서 제시된 KTAM-40을 비교하여 공공시설물 자산관리 정보시스템의 설계방안을 제시하고자 한다.

  • PDF

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.