• Title/Summary/Keyword: 유지관리비용모델

Search Result 229, Processing Time 0.022 seconds

A Study on the Formalization of Maintenance Management Systems and the Cost Predictive Model (유지보수 관리 체계의 정형화 및 비용 예측 모델에 관한 연구)

  • Ryu, Seong-Yeol;Baek, In-Seop;Kim, Ha-Jin
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.4
    • /
    • pp.846-854
    • /
    • 1996
  • In this paper, we propose a solution to the software maintenance problem that is a primary factor of software crisis. We surveyed and analyzed the current software maintenance problems through questionnaires and interviews. As a result, we defined the software maintenance management life cycle and established a fundamental strategies to solve the software maintenance problems efficiently. We also designed a software maintenance management support systems to construct an automated software maintenance management tool. Furthermore, tp improve the formalization and reliability of the software maintenance management procedure, we defined acost predictive model using a fixed-single parameter based on comprehensive program size for the source code and delivered effort(person/month). We elaborated the model by considering an experience level of maintainer, a skill- level defined by the manager, and a reliability level required by the model of maintenance management.

  • PDF

A Study on the SPA Modeling and Defect Relation Analysis for SPI (SPI를 위한 SPA의 모델링 및 결함 연관성 분석에 관한 연구)

  • 박정환;이은서;장윤정;이경환
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.10d
    • /
    • pp.4-6
    • /
    • 2002
  • 최근 소프트웨어 산업에서는 개발 기간의 지연, 비용 증대와 같은 위험관리를 하기 위한 방법으로, SPI 전략이 활발히 진행되고 있다. 사실표준인 CMM이나 국제표준인 SPICE 등이 SPI의 참조적인 모델로 사용된다. 그러나 이들 모델은 특정환경을 가진 소프트웨어 개발 조직에 대한 품질 개선을 위해서 필요한 구체적인 개선 절차와 방법을 기술하고있지 않다. 특히 SPI를 위해서 SPA가 선행되는 경우가 많은데, 효율적인 SPA를 위해서는 심사절차에 대한 정형화가 필요하며 이를 통하여 심사의 일관성을 유지할 수가 있다. 본 논문에서는 심사의 정형화를 위해 SPA의 각 단계들을 UML을 사용하여 표현하고, 모델의 신뢰성을 ISO/IEC 9126의 6가지 품질 특성의 테두리 안에서 검증하고자 한다. 또한 결함들(Defect)간에 연관성을 분석하여, SPA의 등급평가 절차에서 사용되도록 제안한다.

  • PDF

A Study on Asset Valuation Method for Bridge Asset management (교량 자산관리를 위한 가치평가방법 및 체계수립에 관한 연구)

  • Lee, Min-Jae;Park, Kyung-Hoon;Park, Cheol-Woo;Sun, Jong-Wan;Lee, Dong-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.35-44
    • /
    • 2010
  • For efficient maintenance management of bridges, an establishment of asset management system is necessary which helps prediction of maintenance cost and strategic allocation of budget in consideration of top priority. The main purpose of this study is to suggest asset valuation method, which is practical in conformity with domestic situations, through researches on asset valuation method of bridges. This study has researched asset valuation method of bridge, which is appropriate for domestic situations by finding out advantages and disadvantages through investigating domestic and foreign application examples of asset valuation method for bridge facilities. In this study, asset valuation method by historical cost and replacement cost were suggested and a valuation model for bridges was established. In addition, two suggested valuation methods were applied to actual bridges which is used in Korea. As the result, it was analyzed that bridge asset valuation method in consideration of historical cost is desirable for the accounting purpose. And, it was analyzed that valuation method utilizing depreciated replacement cost(DRC), which could consider various factors, is desirable for the maintenance decision supporting purpose.

Effectiveness Evaluation of Demand Forecasting Based Inventory Management Model for SME Manufacturing Factory (중소기업 제조공장의 수요예측 기반 재고관리 모델의 효용성 평가)

  • Kim, Jeong-A;Jeong, Jongpil;Lee, Tae-hyun;Bae, Sangmin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.18 no.2
    • /
    • pp.197-207
    • /
    • 2018
  • SMEs manufacturing Factory, which are small-scale production systems of various types, mass-produce and sell products in order to meet customer needs. This means that the company has an excessive amount of material supply to reduce the loss due to lack of inventory and high inventory maintenance cost. And the products that fail to respond to the demand are piled up in the management warehouse, which is the reality that the storage cost is incurred. To overcome this problem, this paper uses ARIMA model, a time series analysis technique, to predict demand in terms of seasonal factors. In this way, demand forecasting model based on economic order quantity model was developed to prevent stock shortage risk. Simulation is carried out to evaluate the effectiveness of the development model and to demonstrate the effectiveness of the development model as applied to SMEs in the future.

A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment (BIM을 이용한 공동주택 장기수선비용 예측모델 제시)

  • Song, A-Reum;Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF

Operaton Cost Model for Feed Production (배합사료 공장의 작동비용 모델)

  • Park, Kyung Kyoo;Chung, Do Sup;Charles, Deyoe
    • Journal of Biosystems Engineering
    • /
    • v.10 no.1
    • /
    • pp.69-75
    • /
    • 1985
  • For the purpose of estimating the operating cost for feed production, energy consumption, labor requirement, maintenance cost, and supplies and miscellaneous costs are analyzed and developed as mathematical models. Mathematical model for energy usage Consists of electrical energy, boiler fuel energy and vehicle fuel energy. The mathematil model for electrical energy usage for the swine and poultry feed mill and the complete pelleted feed mill are developed, based on the general model mill and the computer program for its design developed in Kansas State University (Park, 1982). Also, the boiler fuel energy consumption model and the vehicle fuel energy consumption model are developed by analyzing the boiler system and the vehicle operation in the warehouse. In order to develop a mathematical model for labor requirement, the data that Vosloh (1968, 1976) constructed for labor requirement in his model mill are used by assuming that his model mill is similar to this model, in terms of labor assignment standards. Maintenance and repair costs are obtained by assuming to be 5.5% of the total capital investment cost. Also, supplies and miscellaneous costs are estimated by using Vosloh's report and it is approximately 0.87 dollars per ton based on daily production.

  • PDF

A Study on the Maintenance Expenses of the Public Rental Rousing (공공임대주택 수선비 지출 실태에 관한 연구)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.171-180
    • /
    • 2005
  • Public rental housing is constructed, owned, and managed by the public sector. The public institution for the public rental housing controls the whole building life cycle from the construction to the demolition. The construction company for the house built for sale is strongly interested in the cost for the initial investment, while the public institution is more focused on the maintenance cost for the preservation of the buildings Nevertheless, the maintenance cost of the public rental housing has been only managed as the accounting factor without the systemic research and analysis on the actual condition. This paper shows how expenses are related to the degree of obsolescence and presents the differences of the maintenance costs by the housing area and expenditure trends (vs time) of the maintenance costs, through analyzing time series data of public rental housing maintenance cost. Further, this paper helps understanding the causes of the differences of the maintenance costs by housing areas and characteristics of the expenditure trends. After all, this paper contributes to the improvement of the reliability and the practicality for the Life Cycle Cost modeling and the maintenance cost estimating.

Failure Rate of Solar Monitoring System Hardware using Relex (Relex 를 이용한 태양광 모니터링 시스템 하드웨어 고장률 연구)

  • An, Hyun-sik;Park, Ji-hoon;Kim, Young-chul
    • Journal of Platform Technology
    • /
    • v.6 no.3
    • /
    • pp.47-54
    • /
    • 2018
  • Predictive analysis in the hardware industry can be performed at an appropriate point in time to prevent failure of production facilities and reduce management costs. This helps to perform more efficient and scientific maintenance through automation of failure analysis. Among them, predictive management aims to prevent the occurrence of anomalous state by identifying and improving the abnormal state based on the gathering, analysis, and scientific data management of facilities using information technology and constructing prediction model do. In this study, we made a fault tree through the Relex tool and analyzed the error code of the hardware to study the safety.

The Maintenance Process Model using BPMN Method in Public Rental Housing (BPMN 방식을 이용한 공공임대주택 유지관리 업무 프로세스 모델)

  • Park, Kyung-Mo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.743-751
    • /
    • 2016
  • It is critical to effectively change the measures of prevention from the breakdown maintenance proceeding an apartment housing maintenance task scope. It is necessary that systematization be performed for a series of tasks, such as facility inspection, diagnosis and replacement. In addition, it is preceded by establishing a standardization for maintenance work scope. Therefore, this study examined the problems related to public rental housing maintenance work scope to manage it more systematically. In addition, the study suggests a work process section for facility repairs, long term replacement and general maintenance using one on one interviews with experts to classify the occupants, management office and head office. This study's standard work system is expected to provide fairness and transparency in addition to improving the productivity in public rental housing maintenance via an efficiency promotion plan. In addition, it is used as the basic reference for developing a system of public rental housing maintenance costs and diagnosis actions. Finally, it is necessary to create improvements that provide a more objective work system standardization throughout the analysis of the productivity data according to the work flow and the review of the occupants, management office and head office in the future applications of the pilot site.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.