Our government will make a plan regulating the cooling limit temperature of the summer season to 26 degree and the heating limit temperature of the winter season to 20 degree for energy saving. Where, the key point of this politic pursuit can be the charge system on heating and cooling cost. We have suggested new cost allocation methodology as a worth evaluation method in the precedent study, and preformed the worth evaluation and cost allocation on four kind of warm air produced from a heating system as an example. In this study, we applied the suggested method to four kind of cooling air as an example, and preformed the worth evaluation and cost allocation on each cooling air. As a result, similarly to the precedent study, the more energy a customer saved, the more heating unit cost decreased, and the more energy a customer consumed, the more heating unit cost increased. From this analysis, we hope that the suggested methodology can offer a theoretical basis to the politic pursuit of government, and induce the spontaneous energy saving of consumers.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.23-30
/
2001
The Financial Cost in construction industry today is tend to increasing the burden of business management on account of lowered profit due to the mege-competition and decreasing investment of construction, multi-interfacing. system in it's attribute and various unreasonable governeing enactments. It is becoming the most important aspects for the management of construction business on how to preserve the profit from the various risks. The ultimate aims of this study is to pursue the contractual equity between the parties by establishing the fundamentals of framework for the compensation of Financial Charges through the review of the precedent studies and analysis of inquiries. As a result of the study, improvable measures for any practical inequality and/or institutional defects of current public contract system in recovering the Financial Cost incurred to Contractor are delivered as below; (1) $\lceil$Working Rules for Construction Industry Accounting Standards$\rfloor$ shall be amended and supplemented so as the incurred interest to be recognized as an operative cost by live return over the collection period. (2) The long-term phase contract system of which is enforcing contractor to bear the certain losses shall be diminished and/or abolished gradually. (3) The unreasonable legislations on compensation for financial cost in contract conditions shall be improved in response to practical circumstances. (4) The use of Critical-Path Method for Time Management shall be activated together with EVMS. (5) Independent application of Contract Enactments for construction industry shall be adopted.
The Journal of Korean Institute of Communications and Information Sciences
/
v.31
no.12B
/
pp.1099-1111
/
2006
As W-CDMA R5(HSDPA) service became recently commercialized in Korea, there is increasing demand for new pricing methodology for the 3G mobile interconnection at the earliest possible time. However, it is hard to find any case of systematic study on it. In this paper, a synthetic investigation into the three aspects of new mobile telecommunication service - technology, market, and regulation - is conducted to verify the validity of new interconnection pricing methodology. As the findings of this research indicate, given the several technological limits of 3G, speed of mobile telecommunication industry evolution, the problem of verifying ex-ante regulations' validity, and the cases of some foreign countries, it is suggested that immediate revision of interconnection policy is not sensible and that the revision is more desirable to be postponed until the maturity of the 3G market or the adoption of All-IP network.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.444-447
/
2006
Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.
Content services on the Internet is getting attention as a new business model, selling digital content in real-time on the web. However, most of these content-based business is based on advertisement model rather than direct-payment-based business model. One of the difficulty in setting up charge-based content service is that the pricing paradigm of digital content is different from traditional pricing of products or services. The objective of this study is to empirically derive the feasible price response functions for these content services. Based on conjoint analysis of popular attributes of digital content, several price response function models were fitted against the conjoint data, using online movie viewers' preferences for different attributes of the service. Fitted function models were linear, multiplicative, exponential, attraction, and Gutenberg models. attraction model was found to be well-fit with the data for several specific combinations of attributes. Implications for pricing strategy is discussed at the end.
Korean Journal of Construction Engineering and Management
/
v.24
no.4
/
pp.25-34
/
2023
The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.5
/
pp.1969-1980
/
2013
The Traffic congestion is caused by the increasing traffic demand. Thus, economic losses have been increasing every year. To solve these problems, car sharing and rental car systems that are equipped with IT technologies emerge. Car sharing has many advantages-the alleviation of the traffic congestion, the saving of maintenance cost for cars, the reduction of car possessiveness, the solution for the hassle of car ownership, for business and personal duty, and the improvement of connectivity between public transportations-. The goal of the car sharing is to achieve low-carbon and eco-friendly transportation. In this study, we review papers related to the car sharing system and the cost system of traffic systems. We estimate the optimal cost of the cloud traffic system that is one of the car sharing services. We suggest a methodology to estimate operational cost and use cost through the analysis of cost system between similar traffic means. The range of the maximum and minimum cost was determined through the comparison and analysis of similar traffic means. Expected demand and the cost that people are willing to pay were estimated through optimized value pricing. The minimum cost per hour that was compared to the cost of rental car was estimated at 5,333 won and the maximum cost per hour that was compared to taxi cost was estimated at 17,700 won. The cost for users was estimated at 6,930 won. The cost of 50% demands was estimated at 6,550won. Future studies should analyze service hours of users, weather, demand pattern and trend and consider them into the cost estimation.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.401-404
/
2002
To manage a construction project efficiently, it is essential to ensure the practical usage in construction management. The purpose of this study is to develop a practical model, which will increase the efficiency of management. The followings are the method of this study: (1) Establishing a breakdown structure based on integration of CBS and WBS which is well acquainted (2) Developing and systemizing managerial standards and processes on such activities as calculating and marking progress rates & schedule, summarizing cost by activities level, making out project analysis reports. This study shall contribute to raising the efficiency in construction management after being verified in a pilot project and being developed into construction management system.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
1994.04a
/
pp.70-75
/
1994
소음진동은 최근 사회적 인식이 변함에 따라 환경관련 민원 중에서 가장 많은 건수의 민원이 발생되는 요소로서 제저업체, 건설업체등의 기업 뿐만 아니라 국토개발, 도시개발을 담당하는 정부 기관 등에서 각종 업무를 수행하는데 중요한 고려대상이 되고 있다. 소음진동이 충분히 저감되지 않은 가전제품은 소비자들에게 외면당하고 민원이 발생된 건설 공사현장에서의 피해 보상금은 기업이 원가부담으로 작용되며 그 사업주체가 정부일 경우는 행정업무 처리에 지장을 초래하게 된다. 소음진동 문제를 해결하는데 가장 우선적으로 필요한 요소는 소음진동 허용기준을 적절히 산정하는 것이다. 소음진동은 발생원인이 매우 다양하며 소음진동에 노출되는 사람(혹은 건축물, 정밀기계 등)의 상대적인 위치(사회 문화적인)에 따라 피해 정도가 다르기 때문에 각국의 정부나 각종 사회단체, 기업은 독특한 국민성, 지역성, 사회개발 정도 등에 따라 적절한 허용기준을 제시하고 있다. 소음진동 문제를 해결해야 할 담당자들은 이러한 모든 여건을 고려하여 현재 상황에서 가장 적절한 허용기준을 설정하고 소음진동 저감 대책을 수립하여야 한다. 본 연구에서는 설계자나 공장관리자, 건설 현장의 관리자들이 소음진동 문제에 직면 했을 때 신속히 적절한 허용기준을 산정한 후 소음진동 대책을 수립할 수 있도록 국내의 주요 소음진동 허용기준을 수립하여 데이타베이스화 하고 이를 PC통신으로 이용가능하게 하는 NVC-DS(Noise and Vibration Criteria-Database System)을 개발하였다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.65-72
/
2001
With the recent rising project complexities and competitive environments in the construction projects, a risk management is recognized as more important management tool than the others. However, as most risk management techniques applied to the construction projects are centered around their initial phases and risk analyses, they are not developed into general project management technique such as time management, cost management and quality management, etc., that are usually applied in the process of construction. Thus, this paper proposes a response process to construction project risks based on the risk threshold and its calculation methodology applying a concept of VaR to establish risk management as general management technique in the construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.