• Title/Summary/Keyword: 운용비용

Search Result 880, Processing Time 0.025 seconds

A Study on the Development of Life Cycle Cost Database in Building (건축물의 LCC Database 구축에 관한 연구)

  • Jeon Chan-Min;Woo Kyung-Hun;Kim Joong-Hun;Kim Kyung-UP;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.537-540
    • /
    • 2003
  • The importance of LCC analysis has been enlarged. Also, it would be necessary to computerize LCC analysis for accurate and logical analysis of LCC. In other papers, they showed LCC analysis model but the study of database development which could be applied in LCC analysis have been undeveloped. As a result, the final goal of this study is to develope LCC database. And this progress is devided 4 steps as design, construction, maintenance and disposal and derived the detailed cost item in the progresses. Futhermore, it would be possible to develope cost DB, fluent DB, general DB, building section DB, material DB and to propose database which would be applied in accurate and logical analysis of LCC.

  • PDF

Estimation of CO2 Emission and Emission Cost Function of Thermal Power Plants and Application to 5-Bus Sample Power System (화력발전소의 CO2 배출량 및 배출비용 함수산정과 5모선 전력계통 적용사례)

  • Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.4
    • /
    • pp.13-18
    • /
    • 2008
  • The global warming due to greenhouse gases is now the hottest issue all over the world. The world has been under $CO_2$ war since the Kyoto Protocol was opened for signature on December 11, 1997 in Kyoto, Japan. The Kyoto Protocol now covers more than 164 countries globally as of July 2006. Countries that ratify this protocol commit to reduce their $CO_2$ emissions, or engage in emissions trading. Korea is also expected to obey the Protocol starting in 2013, which will give a serious shock especially to the electric power industry. The power plants burning the fossil fuel produce more than 20 percent of national total $CO_2$ emission. This paper resents the calculation of the amount and cost of $CO_2$ emission w.r.t. generator MW output and its application to power system operation. The $CO_2$ emission function is derived using the input-output coefficients of the thermal power plants. The optimal power system operation considering $CO_2$ emission and its cost is demonstrated on a five-bus sample power system.

The study on fairness issues in mobile telecommunication service charges (이동통신서비스요금의 적정성에 관한 연구)

  • Shin, Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.9
    • /
    • pp.1975-1985
    • /
    • 2013
  • Telecommunication costs have been increasing successively in Korean households. Even though there are a lot of issues related to the high charges of mobile telecommunication services, plausible solutions have not been provided yet. 99% of Koreans use mobile phones and it is the highest in the world, but charges are relatively high. This situation may be brought by the government policy that supports 'three companies system.' Even the least efficient company might sustain by a tacit bottom price policy and the government did not introduce MVNO into the market. The government can make mobile phone charge system consider cost only in a proper manner and constrain marketing costs to the rational level. And it can reduce mobile charges and rights of consumers must be respected by restraining too much complicated rates system. Fairness of mobile phone charges could be achieved by mobile phone market structure improvement through active introduction of MVNOs and reduction of excessive marketing costs. If proper market structure and policy management are secured, 30% cut of charges could be achieved. And mobile service bills may be made more acceptable if charge is based on a measured rate system according to the amount of data usage.

A Study on High-level FSA for Korean-flagged General Cargo Ships (국적일반화물선 초기안전성평가(High-level FSA) 연구(2))

  • Lee, Jong-Kap;Na, Seong;Kim, Hong-Tae;Park, Jae-Hong
    • Journal of Navigation and Port Research
    • /
    • v.35 no.1
    • /
    • pp.23-30
    • /
    • 2011
  • This study was carried out in order to verity the usefulness of FSA(Formal Safety Assessment) methods as a tool to conduct a safety assessment of general cargo ships flying the Korean flag, and to provide useful information on 'the Safety of General Cargo Ships' for IMO committee's discussion on the matter at a future session. In the previous paper, "A Study on High-level FSA for Korean-flagged General Cargo Ships(1)", the concepts of the FSA methodology and its five steps were described and the results of Hazard Identification(Step 1) and Risk Analysis(Step 2) from the FSA study for the Korean-flagged general cargo ships were discussed. Subsequent to the Steps 1 & 2, the identification of Risk Control Options(RCOs-Step 3) for eliminating or reducing either the frequency or the severity of the risks identified and their Cost-Benefit Assessment(CBA-Step 4) were undertaken. In this paper, the results of the Steps 3 & 4 are discussed, and some recommendations are made.

GUI Development for Conceptual Design Tool of Mid-to-Small Earth Observation Satellite (중·소형 지구관측위성의 개념설계 도구를 위한 GUI 개발)

  • Park, Kiyun;Kim, Hong-Rae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.9
    • /
    • pp.787-798
    • /
    • 2015
  • The emergence of mid-to-small satellites has created a need for rapid development with a relatively low cost. However, the development of mid-to-small satellites requires considerable time and cost in early phase, in particular, during the development of mission and system requirements through iterations of conceptual design and mission design. In this research, Spacecraft Conceptual Design Tool(SCDT) which is based on Graphical User Interface(GUI) was developed to reduce the time and cost for early phase development. Furthermore, GUI-based software can make the input values to be editable easily and show users design results in various way. In this paper, the development results of MATLAB GUI-based SCDT are introduced.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Search-Oriented Deployment Strategies using GIS for Wireless Sensor Networks (무선센서 네트워크 성능 향상을 위한 지리정보시스템 기반 탐색 지향적 센서배치 기법)

  • Kim, June-Kyoung;O, Nam-Geol;Kim, Jae-Joon;Lee, Young-Moo;Kim, Hoon;Jung, Bang-Chul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.10B
    • /
    • pp.973-980
    • /
    • 2009
  • Many studies which have been done for efficient installation and management of wireless sensor networks (WSN) include energy savings, key managements and sensor deployments. Sensor deployment problem is one of the most important and fundamental issues among them in that the topic is directly related with the system cost and performance. In this paper, we suggest a sensor deployment scheme that reduces the system cost of WSN while satisfying the fundamental system requirements of connectivity between sensor nodes and sensing coverage. Using graphical information system(GIS) which contains region-dependent information related with connectivity condition, the initial positions of sensors in the procedure simulated annealing (SA) are determined. The GIS information helps in reducing system cost reduction not only at the initial deployment of SA but also at the final deployment of SA which is shown by computer simulations.

Development of USN system for structural health monitoring of cable-stayed bridge (사장교의 구조 건전성 모니터링을 위한 USN 시스템 구축)

  • Jo, Byung-Wan;Kim, Heoun;Park, Jung-Hoon;Yoon, Kwang-Won;Park, Cheol;Song, Sung-Keun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.445-448
    • /
    • 2011
  • 최근 재료 및 시공 기술의 지속적 발전으로 인하여, 사장교, 현수교 등 장대교량의 건설이 증가하고 있다. 이러한 장대교량들은 사회적 및 경제적인 중요성이 매우 크므로 교량 완공 후 유지관리 및 구조적 건전성을 모니터링하기 위하여 교량 각 주요 구조부재에 다양한 센서를 설치함으로써 교량모니터링시스템을 구축하여 외부하중에 의한 교량구조물의 거동을 감지, 수집, 분석하여 교량의 건전성을 파악하기 위하여 장대교량의 공용성과 안전성 확보에 많은 연구가 진행 되고 있으며 현재 국내외 다수의 장대교량들에는 다양한 센서로 이루어진 구조 건전성 모니터링 시스템이 설치, 운용되고 있다. 실제로 서해대교, 광안대교, 홍콩 TsingMa Bridge, 미국 Bill Emerson Memorial Bridge와 같은 실제 교량에도 적용된 바 있다. 하지만, 이상의 구조 건전성 모니터링 시스템 기술이 널리 활용되는 데는 여러 가지 장애물이 있는데, 그 중에서 가장 큰 것이 시스템을 구축하는 데 과다한 비용이 소요된다는 점이다. 예로 홍콩의 Tsing Ma 대교의 경우 350개의 센서를 설치하는데 약 8백만불이 넘는 금액이 들었으며(Farrar 등, 2004), Celeby(2002)의 보고에 의하면 각 센서의 채널 당 케이블의 설치 비용으로 약 5000불의 비용이 소모되고 있다. 이에 본 연구에서는 이러한 불편함을 극복하기 위하여 무선 센서를 개발하고, 이를 한강 상 교량 중 올림픽대교에 적용, 사장교의 구조 건전성을 저비용 및 높은 편의성으로 모니터링 하기 위한 테스트베드를 구축하여 무선 계측 시스템의 정확성 및 적용성을 확인하였다.

  • PDF

Design of Diigence/Indolence System using a Smart Phone (스마트폰을 이용한 근태관리시스템의 설계)

  • Jo, Hyun Joon;Lee, Dong Gi;Kim, Min Gyu;Park, Jin Soo;Kim, Dong Hyun;Ban, Chae Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.307-309
    • /
    • 2013
  • Diligence/Indolence records are the basic data at a human resource management and the essential data for measure salaries of employees. However, since the D/I systems using RFIDs or biometric sensors require hish costs to build and operate the D/I systems, it is difficult for to small business or self-employed business to use them. In this paper, we propose the Diligence/Indolence system to use the location identification of a smart phon. To locate the position of an employee, the WiFi signal of a smart phone and the wireless access point are exploited. Because the pre-owned hardware resources are used and initial building costs are low, it is easy for small business to use the proposed D/I system with low cost.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF