• Title/Summary/Keyword: 용수공급계획

Search Result 283, Processing Time 0.029 seconds

A Study on Greenhouse Farmers' Willingness to Pay of Agricultural Water Supply through Pipeline (관수로 농업용수 공급에 대한 시설재배 농가의 비용 지불의사 연구)

  • Lim, Cheong-Ryong;Park, Seong-gyeong;Chung, Won-ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.2
    • /
    • pp.109-114
    • /
    • 2018
  • In this study, we estimate the greenhouse farmers' willingness to pay of agricultural water supply through pipeline. First, in the questionnaire design, orthogonal design and block design were used to enhance the ease of survey. Second, the theoretical model was constructed through the setting of the probability utility function, and the parameters were estimated by using the conditional logit model. Third, all of the estimation coefficients were statistically significant at the 1% significance level. The results of analysis are summarized as follows. First, the probability of selection is increased when maintenance is carried out by Korea Rural Community Corporation or local government. Second, the probability of selection is increased when agricultural water supply through pipeline is higher than the current level. Third, if the Korea Rural Community Corporation carries out maintenance management, the marginal willingness to pay is 44 won per ton. And if the local government carries out maintenance management, the marginal willingness to pay is 25 won per ton. Fourth, according to the quality level of agricultural water supply, the marginal willingness to pay is 101 won, 114 won and 120 won per ton, respectively. This study can be used as a basic data on the cost setting for agricultural water supply through pipeline.

Assessment of the Water Circulation Plan for Water Quality Improvement of the West Nakdong River (서낙동강 수질개선을 위한 물순환 방안 분석)

  • Lee, Sanguk;Hur, Young Teck;Kim, Youngsung;Kang, Bo-Seung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.459-459
    • /
    • 2018
  • 서낙동강은 당초 낙동강 본류였으나 1934년 김해평야 일원의 농업용수 공급을 위하여 건설된 대저수문과 녹산수문의 완공 이후 현재의 상태로 유지되고 있다. 서낙동강은 대저수문을 통한 유입과 녹산수문, 녹산배수펌프장을 통한 방류가 시행되고 있으며, 이러한 운영은 외해 조위조건에 따라 간헐적으로 운영되고 있어서, 수체의 정체로 인한 오염도가 높은 실정이다. 또한, 서낙동강 유역은 에코델타시티 등 다양한 개발계획이 수립됨에 따라 수질관리를 위한 여건도 변화할 것으로 예상되며, 이러한 개발에 따른 다양한 수질개선에 대한 사회적 요구가 증대됨에 따라 이를 위한 물순환 개선과 유역에서의 오염부하 저감 등 다양한 수질개선 대책이 필요하다. 본 연구에서는 그간 서낙동강을 대상으로 시행되었던 연구결과와 현재 시행중인 물순환에 대한 효과를 검토하고, 이를 정량화하기 위한 2차원 수리 수질모형(CE-QUAL-W2)을 구축 활용하여 현행 물순환 방안의 운영 효과를 분석하고자 하였다. 당초 환경영향평가시 제시되었던 대저수문과 맥도수문을 통한 유입과 맥도배수펌프장을 통한 유출로 서낙동강, 평강천, 맥도강의 수질을 개선하고자 했던 물순환 계획은 여러 가지 여건으로 인해 시행되지 못하고 있으며, 현재는 매주 강서구청에서 맥도배수펌프장을 이용하여 평강천과 맥도강의 수위를 저하시킨 이후 서낙동강의 하천수를 유입시키는 형태로 물순환을 시행하고 있다. 이러한 현행 물순환 방안에 대한 분석을 위하여 서낙동강, 평강천, 맥도강 구간에 대하여 2차원 수리 수질모형(CE-QUAL-W2)을 이용하여 모의한 결과 현재의 물순환 방법으로는 물순환 유량이 증가하더라도 수질개선에 한계가 있는 것으로 나타났다. 이는 서낙동강에 낙동강 하천수가 대저수문을 통하여 유입된 이후 장기간 체류함에 따라 유역에서의 오염물질 유입의 영향이 크게 나타나며, 이에 따라 평강천과 맥도강에 유입되는 경우 수질개선이 제한적인 것으로 판단된다. 추가적으로 현재 서낙동강 대비 상대적으로 수질이 양호한 낙동강 본류의 하천수를 신규 수문 등의 시설물을 통하여 유입시키는 조건에 대한 분석 결과 현행 물순환 대비 효과가 크며 당초 예상했던 환경영향평가시 목표수질을 달성할 수 있을 것으로 판단보다 상세한 분석과 검토가 필요할 것으로 판단된다.

  • PDF

A Study on the Improvement of Price Structure of Multi-regional Water Supply System in Korea (국내 광역상수도 요금제도의 개선 방향에 관한 연구)

  • Kim, Yeon-Bae;Heo, Eun-Nyeong;Kim, Tae-Yu;Kim, Wan-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.537-545
    • /
    • 1999
  • This study examines three counterplans for the improvement in price structure of Korean multi-regional water supply system. First, price differentiation between industrial and residential water uses is analyzed using several pricing methods. It has been estimated that the industrial water price by the Ramsey pricing method is needed to be two to two and half times higher than the price of residential water to achieve maximum social welfare. Second, peak-load pricing is then studied to seek for the effectiveness of seasonal differentiation in water price. It has been found that consideration of dam facilities and their functions is the key factor for the effectiveness of the seasonal differentiation in water price. Finally, the discussion about the introduction of contract pricing system to the multi regional water supply system to achieve optimal investment plan for the future water demand is presented. We has found that the introduction of contract pricing system will greatly increase the efficiency in future investment plan of the multi-regional water supply system.

  • PDF

Quantifying Uncertainty for the Water Balance Analysis (물수지 분석을 위한 불확실성 정량화)

  • Lee, Seung-Uk;Kim, Young-Oh;Lee, Dong-Ryul
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.4 s.153
    • /
    • pp.281-292
    • /
    • 2005
  • The water balance analysis for the long-term water resources plan is a simple calculation that compares water demands with possible water supplies. For a watershed being considered the reports on the performance of the water balance analysis, however, have shown inconsistent results and thus have not earned credibility due to the uncertainty of the data acquired and models used. In this research, uncertainties in the water scarcity estimate were assessed through probability representation based on the Monte Carlo simulation using Latin Hypercube Sampling (LHS). The natural flow, municipal demand, industrial demand, agricultural demand, and return flow rate were selected as representative input variables for the water balance analysis, and their distributions were set based on the linear regression and the entropy theory. The statistical properties of the output variable samples were analyzed in comparison with a deterministic estimate of the water scarcity of an existing study. Application of LHS to three sub-basins of the Geum river basin showed the deterministic estimate could be overestimated or underestimated. The sensitivity analysis as well as the uncertainty analysis found that the return flow rate of the agricultural water is the most uncertain but is rarely sensitive to the output of the water balance analysis.

An Analysis of the down stream impact of dam Characteristics of Dam Using Indicators of Hydrologic Alterations (수문변화지표법을 이용한 댐 특성요소별 하류하천에 미치는 영향분석)

  • Kang, Ki-Ho;Park, Bong-Jin;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1948-1952
    • /
    • 2008
  • 본 연구에서는 수문변화 지표법을 적용하여 광동댐 등 12개 용수 전용댐의 연 최소 최대유량 크기와 지속기간, 고 저맥파 빈도와 주기, 수문곡선 변화 비율과 빈도, 유량변화정도 등을 분석하여 댐이 하류하천에 미치는 영향을 수치로 제시 하였다. 광동댐 등 12개 댐의 월 유량변화를 산정한 결과, 갈수기에 해당하는 10월부터 다음해 6월까지 8개월간의 댐건설전 월평균 방류량은 $0.64\;m^3/sec{\sim}3.05\;m^3/sec$이었으나, 댐건설후 월평균 방류량은 $0.33\;m^3/sec{\sim}2.99\;m^3/sec$$-69.7%{\sim}167.8%$의 분포를 나타내고 있으며, 12월과 1월을 제외하면 댐건설 이후 오히려 $6.8%{\sim}69.7%$가 감소하였다. 우기철인 7월부터 9월까지 3개월간은 댐건설전 월평균 방류량이 $6.82\;m^3/sec{\sim}7.67\;m^3/sec$이었으나, 댐건설후 월평균 방류량은 $4.12\;m^3/sec{\sim}4.35\;m^3/sec$$51.0%{\sim}55.1%$가 감소하여 저수지 공용량을 이용한 저류효과가 다소 있었던 것으로 분석되었다. 연 최소 최대유량 크기와 지속기간 분석결과 1일, 3일, 7일, 30일, 90일 최소유량은 광동댐 등 10개 댐이 댐건설 전후 모두 $0.0\;m^3/sec$로 증감이 없었으며, 달방댐의 경우 30일 최소유량이 $0.026\;m^3/sec$에서 $0.000\;m^3/sec$로 99.11%가 감소하였다. 영천댐의 경우도 30일 최소유량이 $0.101\;m^3/sec$에서 $0.067\;m^3/sec$로 33.73%가 감소 하였으며, 90일 최소유량의 경우 달방댐은 $0.067\;m^3/sec$에서 $0.031\;m^3/sec$로 53.48%가 영천댐은 $0.219\;m^3/sec$에서 $0.150\;m^3/sec$로 31.29%가 감소하였다. 12개 용수 전용댐중 유지용수공급이 계획되어 있는 영천댐과 달방댐을 제외하고는 댐하류 방류량이 없이 건천화 되었다는 사실을 알 수 있다. 고 저맥파의 빈도와 주기 분석결과 댐건설 이후 수문곡선이 25% 이하로 떨어지는 저맥파는 $72.99%{\sim}98.52%$가 감소하였으며, 저맥파의 기간은 $-80.0%{\sim}4,423.3%$까지 분포하여 상당히 증가하였다. 수문곡선이 75%를 초과하는 고맥파의 발생 횟수는 댐건설 이후 $34.28%{\sim}91.67%$가 감소하였으며, 고맥파의 기간은 $-64.31%{\sim}135.62%$로 증가 또는 감소하였다.

  • PDF

Study on Potential Water Resources of Andong-Imha Dam by Diversion Tunnel (안동-임하 연결도수로 설치에 따른 가용 수자원량에 관한 연구)

  • Choo, Yeon Moon;Jee, Hong Kee;Kwon, Ki Dae;Kim, Chul Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1126-1139
    • /
    • 2014
  • World is experiencing abnormal weather caused by urbanization and industrialization increasing greenhouse gas and one of these phenomenon domestically happening is flood and drought. The increase of green-house gases is due to urbanization and industrialization acceleration which are causing abnormal climate changes such as the El Nino and a La Nina phenomenon. It is expected that there will be many difficulties in water management, especially considering the topography and seasonal circumstances in Korea. Unlike in the past, a variety of water conservation initiatives have been undertaken like the river-management flow and water capacity expansion projects. To meet the increasing demand for water resources, new environmentally-friendly small and medium-sized dams have been built. Therefore, the development of a new paradigm for water resources management is essential. This study shows that additional security is needed for potential water resources through diversion tunnels and is very important to consider for future water supplies and situations. Using RCP 6.0 and RCP 8.5 in representative concentration pathway climate change scenario, specific hydrologic data of study basin was produced to analyze past observed basin rainfall tendency which showed both scenario 5%~9% range increase in rainfall. Through sensitivity analysis using objective function, population in highest goodness was 1000 and cross rate was 80%. In conclusion, it is expected that the results from this study will help to make long-term and stable water supply plans by using the potential water resource evaluation model which was applied in this study.

Development and Assessment of Hedging Rule for Han River Reservoir System Operation against Severe Drought (한강수계 저수지군의 갈수대응 운영을 위한 Hedging Rule의 개발과 적용성 평가)

  • Kim, Jeong Yup;Park, Myung Ky;Lee, Gi Ha;Jung, Kwan Sue
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.891-906
    • /
    • 2014
  • This study suggests the hedging rule of MIP (Mixed Integer Programing) in counting the risk evaluation criteria of the objective function and constraints in order to provide the optimum operating rule in reservoir system as constraining water shortage as much as possible which may happen in the downstream control point of water supply in the aspect of water system management. The proposed model is applied to the Han-river reservoir system for two testing periods (Case I: Jan. 1993~Dec. 1997, Case II: Jan. 1999~Dec. 2003). The model based on the hedging rule with trigger volume, estimated in this study shows that in Case I, the monthly minimum discharge was $310.6{\times}10^6m^3$ in the single operation, $56.3{\times}10^6m^3$ in the joint operation, and $317.5{\times}10^6m^3$ in the hedging rule and also, in Case II, the monthly minimum discharge was found to be $204.2{\times}10^6m^3$ in the single operation, $111.2{\times}10^6m^3$ in the joint operation, and $243.7{\times}10^6m^3$ in the hedging rule. In conclusion, the hedging rule, proposed in this study can decrease vulnerability while guarantees reliability and resiliency.

Status and plan of 'Operation rule improvement and ecological restoration plan of Nakdong estuary' ('낙동강하굿둑 운영개선 및 생태복원 방안 연구 용역' 추진현황 및 계획)

  • Noh, Hee Kyung;Ryu, Hyung Kwan;Ryu, Jong Hyun;Kim, Hwa Young;Chun, Ja Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.21-22
    • /
    • 2020
  • 낙동강 하굿둑(이하 하굿둑)은 1987년 부산 사하구와 강서구 사이에 건설되어 하류 지역의 바닷물 유입을 막아 부산, 울산, 경남 등에 안정적으로 생활·농업·공업 등의 분야에 용수를 공급하는 역할을 해왔다. 현재, 하굿둑의 수문은 낙동강 상류로부터 하류로 흘러내려오는 민물(담수)을 방류하기 위해서만 하굿둑 수문을 개방하고 있다. 하구는 하천의 담수와 바다의 염수가 서로 만나는 구역으로 바닷물과 염수의 밀도차에 의한 혼합으로 자연상태의 하구에서는 담수와 염수가 섞이는 기수역이 형성되며, 이러한 특성으로 하구 인근의 지역에서는 일반적인 하천 및 해양, 연안과는 분명히 구별되는 생태계가 조성된다. 하굿둑 건설이후 바닷물(해수)과 민물(담수)이 만나는 낙동강 어귀에 기수생태계가 사라지면서 바닷물이 유입될 수 있도록 하여 생태계를 복원해야 한다는 필요성이 제기되어 왔으며, 하굿둑이 지역에 기여해온 사실은 분명하나 하굿둑으로 인해 생태계 단절이 발생하고 기수생태계가 파괴되었기 때문에 이를 해결하기 위해서는 하굿둑을 개방하여 과거 기수생태계를 복원해야 한다는 목소리가 높아지고 있다. 이에 따라 정부에서는 하굿둑의 기수생태계 복원을 위해서 관계기관 합동으로 의사결정을 하고 효율적인 개방 방안을 모색하는 실무협의회를 구성하여 운영 중이고, 실무협의회 논의를 통해 5개 주요 관계기관(환경부, 국토부, 해양수산부, 부산광역시, K-water) 공동으로 "낙동강하굿둑 운영개선 및 생태복원 방안 연구용역"을 추진 중이다. 2018년 1단계 용역이 완료되었으며, 2019년부터 2단계 연구용역을 추진 중이고 하굿둑 개방의 수준별로 각종 영향을 검토한 후 대책을 마련하여 기수생태계 복원 방안을 수립하는데 그 목적이 있다. 2단계 연구용역에서는 과학적이고 합리적인 기수생태계 복원방안 마련을 위해서 실제로 해수를 유입시키는 3차례의 실증실험 및 수리모형실험 등을 추진한다. 기존 연구들에서도 수문개방에 따른 해수유입 영향에 대해 모델링을 통해서 분석했지만 이는 검증이 이루어지지 않은 결과로 이번 용역에서는 실제 해수를 유입시키고 염분의 침투 및 각종 수생태 영향을 모니터링 한 후 그 결과를 반영하여 모델링을 고도화하고 있다. 최종적으로 고도화된 모델링 결과를 기반으로 기수생태계 조성 방안별로 염분, 수질, 수생태, 침퇴적 등 각종 분야에 대한 정확한 영향을 분석하고 이에 대한 대책을 포함하여 최종적으로 바람직한 기수생태계 복원 방안을 제시할 계획이다. 기수생태계 복원 방안이 계획에만 그치지 않고 실행으로 연결시키기 위해서 필요성에 대한 이해를 바탕으로 공감대를 형성해 나아가고 있으며 지역주민, 전문가, 관계기관 등 민(民)·관(官)·학(學) 다양한 의견을 수렴하여 하구지역내 수량-수질-수생태를 종합적으로 고려하여 복원 방안을 마련 후 사회적인 합의를 추진하여 확정할 예정이며, 하구의 안정적인 관리를 위해 AI 등 4차 산업혁명기술을 적극 적용하는 스마트한 하구물관리(Smart Estuary Watershed Management)"를 활용한 "하구통합물관리" (Estuary Integrated Watershed Management) 등 과학적인 관리를 추진할 계획이다.

  • PDF

Optimal Water Allocation by Dynamic Programming (동적계획법에 의한 물 배분)

  • 이순탁;이진우
    • Water for future
    • /
    • v.18 no.2
    • /
    • pp.163-174
    • /
    • 1985
  • This study aims at the development of a technique for the optimal water allocation by applying Dynamic Programming Model for the effective usage and rational allocation of water resources, in case of which limited water resources in river basin should be used in several stages. In analytical procedure the possible allocable area was firstly zoned into the four areas: Pohang area ($C_1$), Yeungcheon area ($C_2$), Gyeungsan area ($C_3$), Daegu area ($C_4$), which are located between the Yeongcheon dam and the confluence of the lower Kumho river and the main course of the Nakdong river. Secondly, a return function was determined on the basis of the correlation between the GRP in each area and the amount of water used to it. A DP Model, finally, was applied to the allocation of the water resources according to both their usage and the areas. As a result, the fact has been found that when allocating by the area, $C_1$ could be possibly supplied only with the water resources avaiable from the Yeungchon dam, and the maximum units supplied to $C_1$ should be 240 units ($1unit=10^3㎥$ per day), beyond which we ought to develop an alternative water resources. Also, the return from the allocation by the usage exceeded the one from it by the area. At the same time it was more profitable to limit the water supply to $C_1$ into 217 units. In the allocation by the area 240 units and 80 units, if only the water resources available from the Yeungcheon dam used, and 360 units and 80 units if the Doil dam used additionally, could be supplied to $C_1$ and the lower region respectively. In the allocation by the usage 103 units for industrial water with 33 units for both domestic and commercial water and 183 units, if only the water resources available from the Yeungcheon dam used, and 103 units with 33 units and 304 units, if the Doil dam taken into consideration additionally, could be supplied to $C_1$ and the lower region respectively. Therefore, much more water could be allocated to the region of lower Kumho river if the method of water allocation by the usage.

  • PDF

Assessment of water supply reliability under climate stress scenarios (기후 스트레스 시나리오에 따른 국내 다목적댐 이수안전도 평가)

  • Jo, Jihyeon;Woo, Dong Kook
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.6
    • /
    • pp.409-419
    • /
    • 2024
  • Climate change is already impacting sustainable water resource management. The influence of climate change on water supply from reservoirs has been generally assessed using climate change scenarios generated based on global climate models. However, inherent uncertainties exist due to the limitations of estimating climate change by assuming IPCC carbon emission scenarios. The decision scaling approach was applied to mitigate these issues in this study focusing on four reservoir watersheds: Chungju, Yongdam, Hapcheon, and Seomjingang reservoirs. The reservoir water supply reliablity was analyzed by combining the rainfall-runoff model (IHACRES) and the reservoir operation model based on HEC-ResSim. Water supply reliability analysis was aimed at ensuring the stable operation of dams, and its results ccould be utilized to develop either structural or non-structural water supply plans. Therefore, in this study, we aimed to assess potential risks that might arise during the operation of reserviors under various climate conditions. Using observed precipitation and temperature from 1995 to 2014, 49 climate stress scenarios were developed (7 precipitation scenarios based on quantiles and 7 temperature scenarios ranging from 0℃ to 6℃ at 1℃ intervals). Our study demonstrated that despite an increase in flood season precipitation leading to an increase in reservoir discharge, it had a greater impact on sustainable water management compared to the increase in non-flood season precipitation. Furthermore, in scenarios combining rainfall and temperature, the reliability of reservoir water supply showed greater variations than the sum of individual reliability changes in rainfall and temperature scenarios. This difference was attributed to the opposing effects of decreased and increased precipitation, each causing limitations in water and energy-limited evapotranspiration. These results were expected to enhance the efficiency of reservoir operation.