• Title/Summary/Keyword: 오염부지조사

Search Result 81, Processing Time 0.03 seconds

Borehole Disposal Concept: A Proposed Option for Disposal of Spent Sealed Radioactive Sources in Tanzania (보어홀 처분 개념: 탄자니아의 폐밀봉선원 처분을 위한 제안)

  • Salehe, Mikidadi;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.11 no.4
    • /
    • pp.293-301
    • /
    • 2013
  • Borehole Disposal Concept (BDC) was initiated by the South African Nuclear Energy Corporation (NECSA) with the view to improve the radioactive waste management practices in Africa. At a time when geological disposal of radioactive waste is being considered, the need to protect ground water from possible radioactive contamination and the investigation of radionuclides migration through soil and rocks of zone of aeration into ground water has becomes very imperative. This is why the Borehole Disposal Concept (BDC) is being suggested to address the problem. The concept involves the conditioning and emplacement of disused sealed radioactive sources in an engineered facility of a relatively narrow diameter borehole (260 mm). Tanzania is operating a Radioactive Waste Management Facility where a number of spent sealed radioactive sources with long and short half lives are stored. The activity of spent sealed radioactive sources range from (1E-6 to 8.8E+3 Ci). However, the long term disposal solution is still a problem. This study therefore proposing the country to adopt the BDC, since the repository requires limited land area and has a low probability of human intrusion due to the small footprint of the borehole.

Case history of electrical resistivity survey at the river for bridge design (장대교량 기초 설계를 위한 수륙혼합 전기비저항탐사 사례)

  • Chung Ho-Joon;Kim Jung-Ho;Kwon Hyoung-Seok;Ahn Hee-Yoon;Kim Ki-Seog
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2002.09a
    • /
    • pp.126-138
    • /
    • 2002
  • Designing the bridge with wider span is the present-day trends. Therefore, constructing the foundation on the suitable ground is one of the important factor for the safety of bridge. But, getting a subsurface information under the river is not easy problem. This paper shows results of electrical resistivity survey at the river. Electrical resistivity survey have revealed geoelectrical structure successfully. The result is well matched with boring and can provide useful information on the geological structure such as fault fracture zone for suitable location of foundation. It is expected that application of electrical resistivity survey at the river will be helpful in preventing modification of design due to unexpected ground condition during the construction, or water contamination and increment of costs accompanied with ground reinforcement.

  • PDF

Construction of a Preliminary Conceptual Site Model Based on a Site Investigation Report for Area of Concerns about Groundwater Contamination (지하수 오염우려지역 실태조사 보고서 기반의 사전 부지개념모델 구축)

  • Kim, Juhee;Bae, Min Seo;Kwon, Man Jae;Jo, Ho Young;Lee, Soonjae
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.spc
    • /
    • pp.64-74
    • /
    • 2022
  • The conceptual site model (CSM) is used as a key tool to support decision making in risk based management of contaminated sites. In this work, CSM was applied in Jeonju Industrial Complex where site investigation for groundwater contamination was conducted. Site background information including facility types, physical conditions, contaminants spill history, receptor exposure, and ecological information were collected and cross-checked with tabulated checklist necessary for CSM application. The CSM for contaminants migration utilized DNAPL transport model and narrative CSMs were constructed for source to receptor pathway, ecological exposure route, and contaminants fate and transport in the form of a diagram or flowchart. The component and uncertainty of preliminary CSM were reviewed using the data gap analysis while taking into account the purpose of the survey and the site management stage at the time of the survey. Through this approach, the potential utility of CSM was demonstrated in the site management process, such as assessing site conditions and planning follow-up survey work.

Case studies related to the installation of tunnel ventilation towers (터널 환기탑 국내·외 설치사례연구)

  • Park, Jun Kyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.3
    • /
    • pp.293-304
    • /
    • 2022
  • Recently, the frequency of installation of ventilation towers is increasing due to the planning and construction of underground roads and long tunnel. In this study, implications and points for improvement were considered through investigation and analysis of the installation standards related to ventilation towers in tunnels and analysis of ventilation tower installation cases in domestic and overseas tunnel case study. As a result of this study, when selecting the location and height of the ventilation tower, it is recommended to determine the final ventilation tower type through a consultation process with residents, considering the environmental impact caused by the emission of pollutants, the harmonious arrangement with the surrounding landscape, and the efficient use of the above-ground site nearby ventilation tower. In addition, from the design stage, it is judged that a detailed review of reducing the height of the ventilation tower through air quality simulation is necessary for natural harmony with the surrounding topography and to prevent civil complaints.

Oceanographic Conditions in Relation to Laver Production in Kwangyang Bay, Korea (광양만의 김 생산과 양식장환경과의 관계에 대하여)

  • HONG Jae-Sang;SONG Choon Bok;KIM Nam-Gil;KIM Jong Man;HUH Hyung Tack
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.20 no.3
    • /
    • pp.237-247
    • /
    • 1987
  • The present study deals with the physico-chemical and meteorological conditions in Porphyra-cultivation ground to determine the relationship between laver production and its environmental factors in Kwangyang Bay from January to April in 1986. As a result, major environmental factors which are thought to have a great influence upon the poor harvest during the cultivation period are as follows; 1) the excessive rainfall in the beginning of cultivation period 2) the accumulation of suspended matters on the thallus of laver 3) the decrease of current velocity and the stagnation of the water in the cultivation ground.

  • PDF

Investigation on the Management of Livestock Wastes and VOCs Concentration of Farms in Daejeon Area (대전광역시 양축농가의 축분뇨 관리 실태 및 VOCs 농도 조사)

  • Lee, Bong-Duk;Lee, Soo-Kee;Oh, Hong-Rok;Heo, Jung-Min;Jung, Kie-Chul;Kim, Sung-Bok
    • Korean Journal of Agricultural Science
    • /
    • v.32 no.1
    • /
    • pp.43-51
    • /
    • 2005
  • This study was carried out to investigate the style of livestock house, concentration of malodorous substances of livestock feces and livestock houses in Daejeon area. Among the livestock houses investigated, as most of cow pens(94.5%) have sawdust or chaff on the bottom, there was no leakage of feces out of pen. Most pig pens adopted slury style, but some of them currently use buffering material on the bottom. It is thought that there will be no possible contamination leakage. When it comes to hen house, all the broiler house use litters on the bottom and all the layer house use scrapper. It is also thought that there will be no possible contamination leakage. 3 out of 12 deer pens used buffering material on the bottom, 10 places were maintained in a traditional method, and 7 places left possibility of contamination leakage considering whether the roof was installed or not. The contents of ammonia, amine and volatile fatty acid in fresh feces were lower compared to rotten feces, but the concentration of sulfur-containing matter - hydrogen sulfide, methylmercapthan and ethylmercapthan were higher compared to rotten feces. In the case of malodorous ingredient in livestock houses, only small amount of ammonia and hydrogen sulfide were detected in pig pen and hen house, and other ingredients were not detectable. And those who are engaged in animal husbandry reacted negatively to the use of feed additives for decreasing malodor. In conclusion, it is not worrisome that contamination can be leaked out of animal raising facilities. But if we take into consideration that the point of investigation time is wintry season, there should be more considerate attitude. And feed additives for decreasing malodor need establishing criteria in the manufacturing process.

  • PDF

A Study on the Effect of Improving Permeability by Injecting a Soil Remediation Agent in the In-situ Remediation Method Using Plasma Blasting, Pneumatic Fracturing, and Vacuum Suction Method (플라즈마 블라스팅, 공압파쇄, 진공추출이 활용된 지중 토양정화공법의 정화제 주입에 따른 투수성 개선 연구)

  • Geun-Chun Lee;Jae-Yong Song;Cha-Won Kang;Hyun-Shic Jang;Bo-An Jang;Yu-Chul Park
    • The Journal of Engineering Geology
    • /
    • v.33 no.3
    • /
    • pp.371-388
    • /
    • 2023
  • A stratum with a complex composition and a distributed low-permeability soil layer is difficult to remediate quickly because the soil remediation does not proceed easily. For efficient purification, the permeability should be improved and the soil remediation agent (H2O2) should be injected into the contaminated section to make sufficient contact with the TPH (Total petroleum hydrocarbons). This study analyzed a method for crack formation and effective delivery of the soil remediation agent based on pneumatic fracturing, plasma blasting, and vacuum suction (the PPV method) and compared its improvement effect relative to chemical oxidation. A demonstration test confirmed the effective delivery of the soil remediation agent to a site contaminated with TPH. The injection amount and injection time were monitored to calculate the delivery characteristics and the range of influence, and electrical resistivity surveying qualitatively confirmed changes in the underground environment. Permeability tests also evaluated and compared the permeability changes for each method. The amount of soil remediation agent injected was increased by about 4.74 to 7.48 times in the experimental group (PPV method) compared with the control group (chemical oxidation); the PPV method allowed injection rates per unit time (L/min) about 5.00 to 7.54 times quicker than the control method. Electrical resistivity measurements assessed that in the PPV method, the diffusion of H2O22 and other fluids to the surface soil layer reduced the low resistivity change ratio: the horizontal change ratio between the injection well and the extraction well decreased the resistivity by about 1.12 to 2.38 times. Quantitative evaluation of hydraulic conductivity at the end of the test found that the control group had 21.1% of the original hydraulic conductivity and the experimental group retained 81.3% of the initial value, close to the initial permeability coefficient. Calculated radii of influence based on the survey results showed that the results of the PPV method were improved by 220% on average compared with those of the control group.

A Study on the Improvement of Treatment Efficiency for Nitrogen and Phosphorus by Improved Sewage Treatment Process in Constructed Wetland by Natural Purification Method (자연정화공법에 의한 인공습지 하수처리장에서 하수처리 공정개선에 따른 질소 및 인의 처리효율 향상 방안)

  • Seo, Dong-Cheol;Park, Woo-Young;Lim, Jong-Sir;Park, Chan-Hoon;Lee, Hong-Jae;Kim, Hong-Chul;Lee, Sang-Won;Lee, Do-Jin;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.27 no.1
    • /
    • pp.27-34
    • /
    • 2008
  • To effectively treat the domestic sewage that was produced on a small-scale in farming and fishing village in order to encourage an ecologically friendly environment, a small-scale sewage treatment apparatus using natural purification methods that consisted of an aerobic and an anaerobic plots were constructed. The efficiency of sewage treatment according to the sewage loading was investigated to obtain the optimum sewage loading in small-scale sewage treatment apparatus. Removal rate of pollutants according to the sewage loading were in the order of $150\;Lm^{-2}day^{-1}{\fallingdotseq}300\;Lm^{-2}day^{-1}>600\;Lm^{-2}day^{-1}$. Therefore, the optimum sewage loading was 300 L m-2 day-1. Under the optimum sewage loading, removal rate of BOD, $COD_{Mn}$, turbidity, T-N and T-P were 99, 94, 99, 49 and 89%, respectively. However, to satisfy the water quality standard in effluent in small-sclae sewage treatment apparatus for domestic sewage treatment, the low removal efficiency of T-N and T-P must be improved. So to improve the removal rate of T-N and T-P, the efficiency of sewage treatment according to the improved sewage treatment process such as, re-treatment at aerobic plot, anaerobic condition of aerobic plot, changing the filter media sizes and the depths in anaerobic plot, and also addition of oyster shells to filter media at anaerobic plot were investigated. In case of 150 cm depth in anaerobic plot with filter medium A (effectivity particle size 1.50 mm) and addition of oyster shells to filter media at anaerobic plot, removal rate of T-N and T-P in both plots were increased by 10 and 3%, and 14 and 7% in comparison with 100 cm depth in anaerobic plot with filter medium B(effectivity particle size 0.95 mm), respectively. The optimum improved sewage treatment process in small-scale sewage treatment apparatus were 150 cm depth in anaerobic plot with filter medium A and addition of oyster shells to filter media at anaerobic plot.

Alternative Evaluation Model in the Development of Environment-friendly Residential Land (택지개발사업의 환경친화적 대안평가모형 구축)

  • Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.156-166
    • /
    • 2009
  • Residential land development projects are tending upwards recently. However, an indiscreet residential land development has tended to damage environment by destroying existing green lands and trees of target lands and generating many cut slopes with transformation of its topography. There are Prior Environmental Review(PER) for district designation and Environmental Impact Assessment(EIA) before approval on development plans. PER is implemented after developing a residential land development plan and EIA is implemented after completing a detail design. As the result, many of residential land development projects are passive to reduce potential environmental problems on the designated sites. Object of this study is to construct an evaluation system on alternatives in the early step of site designation for implementing residential land development projects with environment-friendly and sustainable way. For this, alternative evaluation model is constructed by using Fuzzy Inference and Analytic Hierarchy Process(AHP) method based on Environmental Evaluation Factors of residential land development project, which are proposed in the precedent research. If a decision maker evaluates environment damage by ten-point method, the point is transformed Environmental Performance(EP) by Fuzzy Inference, and then, applying weight that is already calculated by AHP method, Total Environmental Performance(TEP) is calculated. After all, an alternative with the highest TEP is selected as the best one. Using this evaluation system, more than two alternatives of residential land development project site, which can hold location appropriateness in the early under undecided land use plan, can be evaluated quantitatively. As environmental damages, which can be generated by implementing a residential land development project, can be detected in the early step, environmental damages can be removed or reduced at the source.

Removal Velocities of Pollutants under Different Wastewater Injection Methods in Constructed Wetlands for Treating Livestock Wastewater (인공습지 축산폐수처리장에서 주입방법에 따른 오염물질의 제거속도 평가)

  • Kim, Seong-Heon;Seo, Dong-Cheol;Park, Jong-Hwan;Lee, Choong-Heon;Lee, Seong-Tea;Jeong, Tae-Uk;Kim, Hong-Chul;Ha, Yeong-Rae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.272-279
    • /
    • 2012
  • In order to effectively treat livestock wastewater in constructed wetlands by natural purification method, removal velocities of pollutants under different injection methods in constructed wetlands were investigated. The removal velocities of chemical oxygen demand (COD), suspended solid (SS), T-N and T-P by continuous injection method were slightly rapid than those by intermittent injection method in full-scale livestock wastewater treatment plant. The removal velocity (K; $day^{-1}$) of COD by continuous injection method was $0.38\;d^{-1}$ for $1^{st}$ bed, $0.13\;d^{-1}$ for $2^{nd}$ bed, $0.17\;d^{-1}$ for $3^{rd}$ bed, $0.05\;d^{-1}$ for $4^{th}$ bed and $0.17\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of COD in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.210\;d^{-1}$, $0.086\;d^{-1}$, $0.222\;d^{-1}$, $0.053\;d^{-1}$ and $0.137\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of SS by continuous injection method was $0.750\;d^{-1}$ for $1^{st}$ bed, $0.108\;d^{-1}$ for $2^{nd}$ bed, $0.120\;d^{-1}$ for $3^{rd}$ bed, $0.086\;d^{-1}$ for $4^{th}$ bed and $0.292\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of SS in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.485\;d^{-1}$, $0.056\;d^{-1}$, $0.174\;d^{-1}$, $0.081\;d^{-1}$ and $0.227\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of T-N by continuous injection method was $0.361\;d^{-1}$ for $1^{st}$ bed, $0.121\;d^{-1}$ for $2^{nd}$ bed, $109\;d^{-1}$ for $3^{rd}$ bed, $0.047\;d^{-1}$ for $4^{th}$ bed and $0.155\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of T-N in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.235\;d^{-1}$, $0.071\;d^{-1}$, $0.171\;d^{-1}$, $0.058\;d^{-1}$ and $0.126\;d^{-1}$, respectively. The removal velocity (K; $day^{-1}$) of T-P by continuous injection method was $0.803\;d^{-1}$ for $1^{st}$ bed, $0.084\;d^{-1}$ for $2^{nd}$ bed, $0.076\;d^{-1}$ for $3^{rd}$ bed, $0.118\;d^{-1}$ for $4^{th}$ bed and $0.301\;d^{-1}$ for $5^{th}$ bed. The removal velocities (K; $day^{-1}$) of T-P in $1^{st}$, $2^{nd}$, $3^{rd}$, $4^{th}$ and $5^{th}$ beds by intermittent injection method were $0.572\;d^{-1}$, $0.049\;d^{-1}$, $0.090\;d^{-1}$, $0.112\;d^{-1}$ and $0.222\;d^{-1}$, respectively.