• Title/Summary/Keyword: 예정가격

Search Result 123, Processing Time 0.036 seconds

Estimating Construction Cost for Small-Sized Apartment Unit (소형공동주택의 적정건축비 추정방안 연구)

  • Lee, Yoo-Seob;Kang, Tae-Kyung;Cho, Hun-Hee;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.94-104
    • /
    • 2006
  • The changed Korean government law associated with the public apartment housing supply, so called the $^{\circ}{\AE}$Apartment Sales Price $Cap^{\circ}{\phi}$, requires new system for estimating construction cost in order to set appropriate price. A model apartment project was carefully designed and its construction cost were analyzed in many different ways. Based on the analyses outcomes, 1,028,000 Won/m2 (excluding cost for underground parking lot) is the most appropriate Price Cap for a smaller than $85{\beta}{\geq}$ apartment unit. Further, it was revealed that the price have to be adjusted reflecting such factors as underground size; structural system; external complex quality; and consumer preferences. Findings from this study will enable the Korean government to realize faster and better application of the related laws. The methodology for obtaining appropriate apartment construction cost will also benefit for future researchers.

School Dieticians' Perception of Seafood Ingredient Pricing in School Food-Service in Seoul (학교급식 수산물 가격 결정에 대한 서울 지역 학교영양(교)사의 인식)

  • Cha, Myeong Hwa;Seo, Sang Rok;Moon, Min Ji;Yang, Ji Hye;Sung, Bo Mi;Jung, Hyun Suk;Ryu, Kyung
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.43 no.11
    • /
    • pp.1766-1773
    • /
    • 2014
  • The purpose of this research was to scrutinize dieticians' perspective of seafood ingredients prices in school food-service. Suppliers' contract status, seafood ingredient usage and satisfaction, expectations regarding prices of seafood ingredients, and willingness to pay when HACCP is taken into account were studied. Through random sampling, the survey was conducted on 231 dieticians in 11 different educational districts and 12 elementary, six middle, and three high schools. Ultimately, 142 survey responses were taken into account. Data analysis was performed using SPSS v15.0 by descriptive analysis, ${\chi}^2$-test, and t-test. For contracts regarding seafood ingredients, competitive contracts composed 79.7%. Exactly 42.1% responded that contracts were breached, and 60.1% testified that product returns were due to excessive glazing of ingredients. The satisfaction rate of 'hygiene & sanitation of product' was the highest, whereas 'price of product' was the lowest. For 'recontracting intention', 'informal purchasing' showed higher rates compared to 'competitive bidding'. Reflecting upon the six main price factors, 'designation and maintenance of HACCP', 'price of raw seafood ingredients', 'processing costs', 'margin', 'logistic costs', and 'cost of standardizing seafood ingredients', dieticians' perceived 'impact on the anticipated price' on total cost was lower than present counterparts. This implicates that 'impact on the present price' of the six price factors is too excessive, suggesting that many dieticians are unsatisfied with the current prices of seafood ingredients. Furthermore, 52.8% of dieticians stated that the maximum additional payment of HACCP seafood ingredients should be less than 5%. Consequently, this research serves as basic information for reasonable pricing of seafood ingredients and contributes to increased seafood usage by school food-services.

The Monte Carlo Simulation and Algorithm on the Relationship Interest Rate Models for the Pricing of Bond Options (채권 옵션의 가격결정을 위한 이자율 모형의 관계에 대한 알고리즘과 몬테 카르로 시뮬레이션)

  • Lee, Gwangyeon;Park, Kisoeb
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.3
    • /
    • pp.49-56
    • /
    • 2019
  • In this paper, we deal with two pricing of bond options using the relationship between the forward rate model and the Libor rate model. First, we derive a formula for obtaining discounted bond prices using the restrictive condition of the Ritchken and Sankarasubramanian (RS), and then use the volatility function relationship of the forward rate and the Libor rate models to find the analytic solution (AS) of bond options pricing. Second, the price of the bond options is calculated by simulating several scenarios from the presented condition using Monte Carlo Simulation (MCS). Comparing the results of the implementation of the above two pricing methods, the relative error (RE) is obtained, which means the ratio of AS and MCS. From the results, we can confirm that the RE is around 3.9%, which means that the price of the bond options can be predicted very accurately using the MCS as well as AS.

A study on effects and improvements following the amendment of Feed-In Tariff (발전차액 지원제도 변경 이후 영향 및 개선방향에 대한 연구)

  • Jeon, Byung-Kyu;Kim, Bum-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.83-86
    • /
    • 2008
  • 정부는 2006년 8월 기존의 발전차액 지원제도를 개정하여 발전차액 기준가격 지원대상 확대, 적용기간의 15년 단일화, 수력, 바이오에너지는 고정요금과 변동요금 중에서 선택할 수 있는 선택권 부여, 기술발전에 따라 태양광, 풍력, 연료전지는2-3년간의 유예기간 이후 매년 감소율을 적용하여 기준가격을 낮추는 등 많은 제도개선 내용을 반영하였다. 2006년 10월부터 개정된 발전차액 지원제도가 시행된 이후 태양광, 풍력의 신규진입이 대폭 증가하였고 수력, LFG, 바이오가스는 대부분 변동요금을 신청하였으며 2007년 집행된 신재생에너지 발전차액 기반기금의 55% 이상이 태양광발전에 지급되는 편중현상의 영향이 나타났다. 따라서 변동요금 설계시보다 SMP 평균이 22원 이상 높아져 변동요금의 재설계, 태양광 발전의 기반기금규모가 55% 이상을 점유하고 있으며 향후 더욱 심화될 예정이므로 특정전원의 기반기금 점유비중 제한 및 최근 수년간 준공된 신재생에너지의 운영실적을 분석하고 법적요건을 상세히 검토하여 투자비, 운영비, 이용률등을 재조정하여 기준가격을 합리적으로 개정하여 제2의 신재생에너지 도약기를 마련해야 할 것이다.

  • PDF

Analysis on Price Driver of Spread and Different Patterns of EUA and sCER (탄소배출권 EUA와 sCER의 가격 차이 패턴 및 스프레드(Spread) 결정 요인 분석)

  • Park, Soonchul;Cho, Yongsung
    • Environmental and Resource Economics Review
    • /
    • v.22 no.4
    • /
    • pp.759-784
    • /
    • 2013
  • Participants can use the allowances and offsets for implementing the compliance in the Emissions Trading Scheme(ETS). There are alternative commodities which are different prices it gives the opportunities to reduce the compliance costs and get the arbitrage. This study analyzes the price driver of spread which is the difference between EUA and sCER using AR-GARCH model, EUA and CER during the Phase 2 in EU ETS. The results show that there are common elements which impacts the EUA and sCER and also different elements between them. EUA and sCER get the effects from energy price and economic criteria such as coal price and financial crisis as common elements. However them get the effects from electric price, policy criteria such as restricted CERs and difference price between EUA and ERU price as different elements. The results shows that spread will be widen if energy price increase, especially oil and electric price give more impacts the spreads. This study has the means that it explains the reason why the spreads will broaden sharply in 2012. And it also suggests the price driver of spread during the whole period of Phase 2. In addition, this study shows that political aspects maybe become the main criteria of price change with structural elements shch as energy price in Korea ETS which starts in 2015.

Cost Estimating System in KT (KT 시설공사비 산정 -실적공사비 방식을 중심으로)

  • Han Kyu-Jeong;Lee Chul-Kun;Mun Byeong-Jig;Lee Woo-Jung
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.373-375
    • /
    • 2003
  • 통신사업자들은 다양한 정보서비스를 제공하기 위한 노력과 통신품질 향상을 위한 시도를 다양하게 진행하고 있으며, 우수한 품질의 서비스를 저렴하게 공급하기 위한 노력도 시도하고 있다. 본 고에서는 KT가 경영 합리화와 내부 원가절감을 위한 여러 가지 노력 중에서 투자시설 공사와 관련하여 공사원가 계산방법의 개선을 위해 새로 도입한 다양한 방법들을 살펴본다. 특히 교환시설분야에서 적용 중인 실적공사비에 의한 예정가격 산정방법을 중심으로 개념과 적용사례 분석을 하기로 한다.

  • PDF

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

Safety Performance Evaluation of Blowers for 1kW Class Stationary Fuel Cell System (1kW급 건물용 연료전지시스템 블로워의 안전성능 평가)

  • Lee, Jungwoon;Kim, Younggyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.90.2-90.2
    • /
    • 2011
  • 세계 각 국에서는 선진국을 중심으로 기후변화와 치솟는 유가에 대응하기 위하여 다양한 에너지원의 확보를 위해 부단히 노력하고 있다. 특히, 신재생에너지원 중 에너지 지속성이 가장 우수한 연료전지의 경우 1kW급 건물용 연료전지시스템이 도시가스 인프라가 가장 우수한 한국 및 일본을 중심으로 상용화에 가장 근접해 있는 실정이다. 일본의 경우 가정용 연료전지시스템 '에너팜'의 일부 제품이 올해부터 200만엔대로 가격을 내려 보급되어질 예정이고, 아직은 경제성이 떨어지지만 연료전지 조기 상용화를 위해 시스템 가격저감을 통한 기술개발이 한창이다. 또한 700W급 고체산화물형 연료전지시스템을 세계에서 처음 시판 계획을 가지고 있다. 국내의 경우 2009년도부터 시작된 '그린홈 보급확대를 위한 건물용 연료전지 보조기기 가격저감 기술개발'연구를 통해 블로워, 밸브, 유량계 및 펌프 등의 보조기기의 단가를 낮추고자 기술개발에 박차를 가하고 있다. 이에 따른 연료전지 부품 가격저감 기술이 국내 건물용 연료전지 시장보급의 활력소가 되기를 기대한다. 본 연구에서는 건물용 연료전지의 보조기기인 블로워의 가격저감을 위한 연구의 일환으로 블로워의 안전성능 평가를 통한 보조기기의 가격저감 및 안전성을 확보하고자 한다. 1kW급 건물용 연료전지시스템의 여러 블로워 중 도시가스용 연료승압 블로워, 선택산화 공기 블로워, 버너 공기 블로워 및 캐소드 공기 블로워의 안전성능 평가를 수행하였고, 평가결과의 공유를 통하여 국내 블로워 제조사의 설계방향을 제시하고 연료전지시스템의 안전성을 확인하고자 한다. 특히, 내구성, 기밀, 가혹조건시험 및 소음, 진동, 습도, 온도와 같은 내주위환경시험 등의 평가결과 비교를 통하여, 연료전지 부품 인증기준을 재정립하여 연료전지 부품산업의 조기 활성화를 도모하고자 한다.

  • PDF

대기압 플라즈마를 이용한 탄소섬유 안정화 공정

  • Lee, Heon-Su;Kim, So-Yeong;Jo, Han-Ik;Lee, Seong-Ho
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.02a
    • /
    • pp.137-137
    • /
    • 2013
  • 지속 가능한 발전을 위해, 한정된 자원인 석유의 고갈을 막기 위해 석유를 수송에너지로 주로 사용하는 자동차에서 바이오 디젤이나 연료전지, 전기자동차 등 다양한 대안이 제시되고 있다. 그러나 식량 가격 상승, 낮은 안정성, 인프라 확충 등의 문제의 해결이 필요할 뿐만 아니라, 석유의 소비를 감소시키는 대신, 지구에서 소비할 수 있는 다른 형태의 에너지를 소모한다는 측면에서 근본적인 에너지 문제의 해결책의 모색이 필요하다. 19세기 후반, 백열전구의 필라멘트 용도로 사용되기 시작한 탄소 섬유는, 철에 비해 5배 가볍고 강도는 10배가 높으며 내열성이 뛰어난 소재로서, 복합소재의 형태로 제조되어 비행기, 우주선, 풍력 발전 블레이드 등 다양한 산업 분야에서 소재의 장점을 발휘하는 재료로 적용 분야가 확대되고 있다. 특히 비행기 분야에서는 최근 비행기 몸체 구조에 기존 알루미늄 합금을 탄소섬유복합재가 대체하고 있으며, 최근에는 부피 기준 50% 가량까지 탄소섬유 복합재를 사용하여 비행기를 제작하고 있다. 이에 따라 기존에 비해 20% 가량 연료 소모가 감소하여, 비행기 한 대 당 연간 2,700톤의 이산화탄소 배출을 저감하고 있다. 이와 같이 탄소섬유 복합재를 다양한 분야에 적용함으로써, 에너지 문제에 대한 보다 근본적인 접근이 가능하다. 그러나 탄소섬유 복합소재는 금속 등 기존 재료에 비해 높은 가격으로 상용 자동차 등 에너지 소비량이 많은 분야에 널리 적용되는데 한계가 존재한다. 이와 같이 높은 탄소섬유의 가격은, 원가의 50% 가량을 차지하는 PAN 원사 가격과 나머지 반절에 해당하는 안정화/탄화 공정 비용에서 기인하는 것으로, 미국의 ORNL (Oak Ridge National Laboratory), 한국의 KIST 복합소재연구소 등에서는 원사, 안정화 공정, 탄화 공정 등 다양한 측면에서 탄소섬유 복합재의 가격을 절감할 수 있는 방안을 연구 중이다. 미국 ORNL에서는 마이크로웨이브 플라즈마를 이용하여 기존에 열을 이용해 수행하던 탄화 공정 비용을 크게 절감하고 있으며, KIST에서는 대기압 플라즈마를 이용하여 기존에 열을 이용해 2시간 가량이 소요되는 안정화 공정을, 대기압 플라즈마를 이용하여 30분여로 단축된 시간에 수행하는 공정을 개발 중이다. 본 발표에서는 탄소섬유 복합재의 개요와, 탄소섬유 가격 절감 방안으로서의 플라즈마에 대해 논의하며 대기압 플라즈마의 다양한 응용에 대해 소개할 예정이다.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.