• Title/Summary/Keyword: 예산소요

Search Result 220, Processing Time 0.02 seconds

Budget Estimation Problem for Capacity Enhancement based on Various Performance Criteria (다중 평가지표에 기반한 도로용량 증대 소요예산 추정)

  • Kim, Ju-Young;Lee, Sang-Min;Cho, Chong-Suk
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.5
    • /
    • pp.175-184
    • /
    • 2008
  • Uncertainties are unavoidable in engineering applications. In this paper we propose an alpha reliable multi-variable network design problem under demand uncertainty. In order to decide the optimal capacity enhancement, three performance measures based on 3E(Efficiency, Equity, and Environmental) are considered. The objective is to minimize the total budget required to satisfy alpha reliability constraint of total travel time, equity ratio, and total emission, while considering the route choice behavior of network users. The problem is formulated as the chance-constrained model for application of alpha confidence level and solved as a lexicographic optimization problem to consider the multi-variable. A simulation-based genetic algorithm procedure is developed to solve this complex network design problem(NDP). A simple numerical example ispresented to illustrate the features of the proposed NDP model.

'94년 국방비와 국방예산 정채 방향

  • Gang, Myeong-Gil
    • Defense and Technology
    • /
    • no.1 s.179
    • /
    • pp.14-21
    • /
    • 1994
  • 국회에서의 국방예산안 심의과정에서는 예년에 비교할 수 없을 정도로 심층깊은 논의가 이루어졌을 뿐만 아니라 율곡예산에 대해서도 세부적인 질의와 검토가 이어짐으로써, 향후에는 예산소요에 대한 명확한 근거와 논리가 뒷받침되지 않고는 적정수준의 국방비 획득이 결코 용이하지 않을 것임을 예고하였다.

  • PDF

2000년 문제 대책 예산수립 방법

  • Lee, Gang-Sin
    • 정보화사회
    • /
    • s.115
    • /
    • pp.17-19
    • /
    • 1997
  • 2000년문제에 대한 해결에 있어서 가장 우선적으로 이루어져야 할것이 예산에 대한 산정을 어떻게 할 것인가이다. 이 연도문제 해결을 위해 시급한 예산을 확보해야 하고, 문제해결관련 지침이 전무하다는 점이고 국내실정에 맞는 연도변환 소요비용의 산출방법이 필요하기 때문이다.

  • PDF

Study on validating proper System Requirements by using Cost Estimations Methodology (비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구)

  • Choi, Sung Kyu;Choi, Eun Ha
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.97-105
    • /
    • 2013
  • It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.

정보통신 표준화정책 방향

  • Sin, Yong-Seop
    • 정보화사회
    • /
    • s.125
    • /
    • pp.20-24
    • /
    • 1998
  • 정보통신부가 '97년에는 TTA로 표준화 추진체계를 일원화하였다면 '98년에는 이를 바탕으로 표준화 예산을 양적으로 대폭 확대하여 내실있는 표준화를 추진할 방침이다. 신규 연구개발 확대와 기존 연구개발 과제를 대폭 지원할 계획이며 표준화의 중요성을 고려하여 예산을 매년 2배씩 증액하였고 따라서 정보통신 표준화에 추진되는 소요예산은 총 23개과제 260억원이다.

  • PDF

Method for determining the optimal number of concurrent spare parts under available budget constraint (예산제약 하에서의 동시조달수리부속의 적정소요 산출)

  • 김영호;전치혁
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.321-328
    • /
    • 2000
  • 본 연구는 새로운 장비체계 도입 시 초기 일정기간 동안 장비의 목표가용도 유지를 위해 필요한 동시조달수리부속(Concurrent Spare Parts)와 적정소요 산출에 관한 해법을 제시한다. 새로운 장비체계 도입 시 함께 보급되는 예비수리부속은 장비체계 운용에 중요한 역할을 한다. 따라서 장비체계가 주어진 임무를 수행하는 동시에 정상상태를 유지하기 위한 적정수준의 예비부속 확보가 필요하며 최소의 비용으로 장비의 가동률을 극대화 할 수 있도록 하여야 한다. 본 연구에서는 부품의 고장특성 및 수리능력을 고려한 고장분포함수를 바탕으로 각 부속별 중요도를 만족시키는 초기 수리부속 소요 결정모형과 해 산정기법을 제시하며 가용예산 제약에 따른 소요조정을 통해 최적의 예비부속 재고수준을 결정한다.

  • PDF

축소형 연소기 노즐유동

  • Park, Tae-Seon
    • Journal of the KSME
    • /
    • v.56 no.9
    • /
    • pp.44-48
    • /
    • 2016
  • 실제 크기의 로켓엔진은 수많은 예산이 소요되기 때문에 새롭게 설계된 엔진에 대하여 비행모델의 제작 및 실험연구는 예산과 위험성 때문에 매우 제한적으로 시행된다. 따라서 비행모델의 설계를 확정하기 위한 개발단계에서는 실제 크기의 로켓엔진의 특성을 나타낼 수 있는 소형 액체로켓을 제작하여 시험평가를 수행하게 된다. 이 글에서는 이러한 축소형 연소기 관련 연구동향을 알아보고자 한다.

  • PDF

무기체계 시험평가체계 개선 방안

  • Choe, Seok-Choel;Lee, Chung-Hun
    • Defense and Technology
    • /
    • no.3 s.253
    • /
    • pp.18-29
    • /
    • 2000
  • 무기체계 시험평가의 중요성은 국방예산의 효율성 및 무기체계의 신뢰성 제고 측면에서 아무리 강조하여도 지나침이 없을 것이다. 국방예산 획득여건의 악화는 획득비용의 절감과 이에 따른 경제적인 시험평가를 요구하고 있어 현재의 시험평가 방법을 보다 더 효율적.경제적인 방법으로 전환하여 현재의 국방예산 감소추세에 대응하며 시험평가에 소요되는 시간 및 비용을 절감하고 시험평가의 신뢰성을 제고하는 시험평가체계 개선 방안의 모색이 절실히 요구되고 있다.

  • PDF