• Title/Summary/Keyword: 예산계획법

Search Result 79, Processing Time 0.035 seconds

A Study on Korea Comics Industry Policy (한국의 만화산업 발전 정책에 관한 연구)

  • Kim, Byong-Soo;Yoon, Ki-Heon
    • Cartoon and Animation Studies
    • /
    • s.12
    • /
    • pp.1-12
    • /
    • 2007
  • The long-term stagnation in the country involving missing it is starting from the late 1990s accumulated on the common vision. The government has, since 2002, cartoon comics industry nurture long-term industrial development of five-year plan, 346.7. During that period of unprecedented material support to the government's sweeping received. Upcoming in 2008 is the second long-term development plan will be effective. The temperature inside and outside the government, however, various tax and go to feel quite differently. The first plan is merely a period of enforced projects listed are only fit for Panathinaikos has endorsed this general trend, yirugo diagnosis. But fundamentally, the exact diagnosis is necessary for the long-term stagnation. Children's Learning Results cartoon wepmanhwawa not thrive households. Comics readers about the consumption pattern is changing. Therefore, long-term plan for the development of cartoon industry only a few government budget plan is not the government write 73 gala, companies and the private sector are coming together to plan and worry that the plan should be a comprehensive and bevels. In addition, through the selection and concentration to increase efficiency. You will probably need to strengthen the capabilities of our private organizations, it is a priority. Furthermore, the government's financial and policy support for the lobbying power also lead to an increase in betting. It features a think tank to study the policy framework for the establishment and promotion assume the ultimate proposal includes a cartoon film cozy confines of the legislation that parallels activities in the various proposals.

  • PDF

GIS Based Distributed Flood Damage Assessment (GIS기반의 분포형 홍수피해산정 기법)

  • Yi, Choong Sung;Choi, Seung An;Shim, Myung Pil;Kim, Hung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3B
    • /
    • pp.301-310
    • /
    • 2006
  • Typically, we needs enormous national budget for the flood control project and so the project usually has big influence on the national economy. Therefore, the reliable estimation of flood damage is the key issue for the economic analysis of the flood control project. This study aims to provide a GIS based technique for distributed flood damage estimation. We consider two aspects of engineering and economic sides, which are the inundation analysis and MD-FDA (Multi-Dimensional Flood Damage Analysis), for the flood damage assessment. We propose the analysis framework and data processing using GIS for assessing flood damages. The proposed methodology is applied to the flood control channel project for flood disaster prevention in Mokgamcheon/Dorimcheon streams and this study presents the detailed GIS database and the assessment results of flood damages. This study may have the worth in improving practical usability of MD-FDA and also providing research direction for combining economic side with the engineering aspect. Also this distributed technique will help decision-making in evaluating the feasibility of flood damage reduction programs for structural and nonstructural measures.

Development of Integrated drone measurement system for Flood discharge measurement (홍수기 유량측정을 위한 통합 드론측정시스템 개발)

  • Tae Hee Lee;Jong Wan Kang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.82-82
    • /
    • 2023
  • 홍수기 하천에서 유량측정은 예산, 인력, 안전 및 측정 시 편의성 등의 이유로 측정에 제한이 많다. 특히, 태풍 등으로 인한 호우사상 발생 시 위와 같은 문제로 홍수량 측정에 어려움이 따른다. 이러한 문제점을 개선하기 위해 Lee et al.(2021)은 드론과 전자파표면유속계의 기능을 융합한 DSVM(Dron and Surface Veloctity Meter using doppler radar) 측정방법을 개발하였다. 전자파표면유속계 측정의 제한 요소인 진동을 감소시키기 위해 댐퍼플레이트를 개발하였고 금강의 지류인 봉황천에 현장 적용을 통해 DSVM 측정방법의 실용성을 확인하였다. 기존 연구에서 DSVM 방법은 드론의 각 측선 이동을 위한 조종과 전자파표면유속계 측정의 제어를 측정자가 수행하였는데 본 연구에서는 통합 드론측정시스템(IDMS, Integrated Drone Measurement System) 개발을 통해 측정자의 조종 의존도를 줄임과 동시에 안전하고 정확한 유량측정을 위해 노력하였다. 기존 댐퍼플레이트의 상하 진동 흡수 기능뿐만 아니라 전자파표면유속계의 흔들림 현상 등 자세 제어 기능을 보완하기 3축 모터를 적용한 방수짐벌을 개발하여 측정 정확도를 향상시켰다. 미션컴퓨터 개발로 측정지점의 측정 임무정보를 DB화하여 각 측선별 헤딩, 고도, 이동 등 자동항법 기능과 기체의 안정화 이후 전자파표면유속계를 자동으로 제어하여 측정을 실시하는 기능을 구현하였다. 또한 통합 GCS(Ground Control System)를 통해 비행 및 측정에 대한 모든 정보를 확인하고 컨트롤 할 수 있게 하였다. 2022년 금산군(제원대교), 무주군(취수장), 경주시(서천교) 지점에서 홍수기 유량측정에 도입하여 중간단면적법, 지표유속법을 적용하여 통합드론측정시스템의 실용성을 검증 완료하였다. 2023년 현장에 18대의 통합 드론측정시스템을 도입하여 홍수기 유량측정에 활용할 계획이다.

  • PDF

A Study on Improvement on National Legislation for Sustainable Progress of Space Development Project (우주개발사업의 지속발전을 위한 국내입법의 개선방향에 관한 연구)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.25 no.1
    • /
    • pp.97-158
    • /
    • 2010
  • The purpose of this paper is to research on the contents and improvement of national legislations relating to space development in Korea to make the sustainable progress of space development project in Korea. Korea has launched its first satellite KITST-1 in 1992. The National Space Committee has established "The Space Development Promotion Basic Plan" in 2007. The plan addressed the development of total 13 satellites by 2010 and the space launch vehicle by 2020, and the launch of moon exploration spaceship by 2021. Korea has built the space center at Oinarodo, Goheng Province in June 2009. In Korea the first small launch vehicle KSLV-1 was launched at the Naro Space Center in August 2009, and its second launch was made in June 2010. The United Nations has adopted five treaties relating to the development of outer space as follows : The Outer Space Treaty of 1967, the Rescue and Return Agreement of 1968, the Liability Convention of 1972, the Registration Convention of 1974, and the Moon Treaty of 1979. All five treaties has come into force. Korea has ratified the Outer Space Treaty, the Rescue and Return Agreement, the Liability Convention and the Registration Convention excepting the Moon Treaty. Most of development countries have enacted the national legislation relating to the development of our space as follows : The National Aeronautic and Space Act of 1958 and the Commercial Space Act of 1998 in the United States, Outer Space Act of 1986 in England, Establishment Act of National Space Center of 1961 in France, Canadian Space Agency Act of 1990 in Canada, Space Basic Act of 2008 in Japan, and Law on Space Activity of 1993 in Russia. There are currently three national legislations relating to space development in Korea as follows : Aerospace Industry Development Promotion Act of 1987, Outer Space Development Promotion Act of 2005, Outer Space Damage Compensation Act of 2008. The Ministry of Knowledge Economy of Korea has announced the Full Amendment Draft of Aerospace Industry Development Promotion Act in December 2009, and it's main contents are as follows : (1) Changing the title of Act into Aerospace Industry Promotion Act, (2) Newly regulating the definition of air flight test place, etc., (3) Establishment of aerospace industry basic plan, establishment of aerospace industry committee, (4) Project for promoting aerospace industry, (5) Exploration development, international joint development, (6) Cooperative research development, (7) Mutual benefit project, (8) Project for furthering basis of aerospace industry, (9) Activating cluster of aerospace industry, (10) Designation of air flight test place, etc., (11) Abolishing the designation and assistance of specific enterprise, (12) Abolishing the inspection of performance and quality. The Outer Space Development Promotion Act should be revised with regard to the following matters : (1) Overlapping problem in legal system between the Outer Space Development Promotion Act and the Aerospace industry Development promotion Act, (2) Distribution and adjustment problem of the national research development budget for space development between National Space Committee and National Science Technology Committee, (3) Consideration and preservation of environment in space development, (4) Taking the legal action and maintaining the legal system for policy and regulation relating to space development. The Outer Space Damage Compensation Act should be revised with regard to the following matters : (1) Definition of space damage and indirect damage, (2) Currency unit of limit of compensation liability, (3) Joint liability and compensation claim right of launching person of space object, (4) Establishment of Space Damage Compensation Council. In Korea, it will be possible to make a space tourism in 2013, and it is planned to introduce and operate a manned spaceship in 2013. Therefore, it is necessary to develop the policy relating to the promotion of commercial space transportation industry. Also it is necessary to make the proper maintenance of the current Aviation Law and space development-related laws and regulations for the promotion of space transportation industry in Korea.

  • PDF

An Analysis of the Government Officer's Understanding on Landscape Law and Institutions (경관제도에 대한 경관담당 공무원 인식조사)

  • Joo, Shin-Ha
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.3
    • /
    • pp.54-65
    • /
    • 2017
  • The purpose of this study is to investigate the perception of landscape law and institutions and to provide basic data for improvement of landscape systems. Specifically, we analyzed the importance and achievement of various landscape systems, and examined the understanding and perception of government officers in landscape plan, landscape project, landscape agreement, landscape reviews and landscape committees, landscape ordinance, and landscape administration. The main results of the study are summarized as follows. 1. Overall, the landscape administration system was highly interested, and it was also positive about the utility of the landscape law and the landscape charter. As a result of analysis of the IPA, the landscape plan and the landscape policy plan need to be intensively improved. 2. The landscape plan is mostly used for the purpose of responding to the scenery review or complaint request, but about 10.8% of respondents said that they did not refer it at all, so it is urgent to make the contents of the landscape plan real and improve the performance. Although many officers thought that less than 18 months would be quite enough for landscape plans, but it is necessary to change this duration issue. 3. In order to improve landscape projects and landscape agreements, it seems that budget securing, experts, and promotional organizations should be improved first. 4. It is urgently necessary to enhance the understanding about overall landscape law and systems of landscape review committee in order to supplement the landscape review and the landscape committee. 5. Administrative support such as personnel recruitment is required for landscape ordinance and landscape administration, and it is also found that many officers also have a great burden in making subjective judgment as the person in charge. There could be a positive bias in the results of the study, because the survey was conducted only for public officials who participated in the education. But the result will be helpful to look at the overall tendency of the landscape system. I hope that it will help improve the landscape system in the future much more realistic.

Deduction and Verification of Optimal Factors for Stent Structure and Mechanical Reaction Using Finite Element Analysis (스텐트의 구조 및 기계적인 반응에 대한 최적인자 도출과 유한요소해석법을 통한 검증)

  • Jeon, Dong-Min;Jung, Won-Gyun;Kim, Han-Ki;Kim, Sang-Ho;Shin, Il-Gyun;Jang, Hong-Seok;Suh, Tae-Suk
    • Progress in Medical Physics
    • /
    • v.21 no.2
    • /
    • pp.201-208
    • /
    • 2010
  • Recently, along with technology development of endoscopic equipment, a stent has been developed for the convenience of operation, shortening of recovery times, and reduction of patient's pain. To this end, optimal factors are simulated for the stent structure and mechanical reaction and verified using finite element analysis. In order to compare to present commercialized product such as Zilver (Cook, Bloomington, Indiana, USA) and S.M.A.R.T (Cordis, Bridgewater Towsnhip, New Jersey, USA), mechanical impact factors were determined through Taguchi factor analysis, and flexibility and expandability of all the products including ours were tested using finite element analysis. Also, important factors were sought that fulfill the optimal condition using central composition method of response surface analysis, and optimal design were carried out based on the important factors. From the centra composition method of Response surface analysis, it is found that importat factors for flexibility is stent thickness (T) and unit area (W) and those for expandability is stent thickness (T). In results, important factors for optimum condition are 0.17 mm for stent thickness (T) and $0.09\;mm^2$ for unit area (W). Determined and verified by finite element analysis in out research institute, a stent was manufactured and tested with the results of better flexibility and expandability in optimal condition compared to other products. Recently, As Finite element analysis stent mechanical property assessment for research much proceed. But time and reduce expenses research rarely stent of optimum coditions. In this research, Important factor as mechanical impact factor stent Taguchi factor analysis arrangement to find flexibility with expansibility as Finite element analysis. Also, Using to Center composition method of Response surface method appropriate optimized condition searching for important factor, these considering had design optimized. Production stent time and reduce expenses was able to do the more coincide with optimum conditions. These kind of things as application plan industry of stent development period of time and reduce expenses etc. be of help to many economic development.

정보통신연구개발사업의 우선순위 설정과 적정자원 배분 - 다기준의사결정(MCDA) 방법의 적용사례 -

  • 황용수;장진규
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 1999.05a
    • /
    • pp.539-563
    • /
    • 1999
  • 이 논문은 정보통신정책 목표와의 연관성 속에서 정보통신연구개발사업의 우선순위를 설정함과 아울러 비용효과성에 바탕을 둔 적정 자원배분 도출하는데 주안점을 두고 있다. 복합적인 목표를 가진 연구개발사업에 대해 사업부문별 그리고 기술분야별로 객관적이면서도 설득력있는 자원배분지침을 마련하기 위하여 본 연구는 다기준의사결정(MCDA: Multi-criteria Decision Analysis) 방법을 채택하고 있다. 이 방법론에서는 사업의 목표와 우선순위 판단기준 및 사업대안이 계층적으로 연계된 분석구조를 설계하여 사업대안의 우선순위를 먼저 설정하고, 여기에 정수계획법(Integer Programming)을 결합하여 사업의 목표와 연계된 비용-편익 관계(Cost-benefit relationship)를 최적화하는 바탕 위에서 사업대안별 자원배분 시나리오를 제시하게 된다. 이러한 절차로 사업부문별 및 기술분야별로 각각 도출된 8개의 자원배분 시나리오는 자원배분 경향치의 안정성(Stability) 분석과 자금지원의 과부족에 대한 현실적 적합성(Relevance) 분석을 거쳐 최종적으로 하나의 적정 자원배분방안으로 수렴되도록 하였다. 우선순위 설정에 기초가 되는 사업대안의 편익에 대한 자료는 전문가의 정성적 판단을 통해 수집되었는데, 이를 위해 정보통신기술 부문에서 활동 중인 중견 이상의 총 58명의 산학연 전문가를 대상으로 한 조사를 실시하였다. 먼저, 기초기반ㆍ전략기술개발사업, 연구ㆍ기술인력양성사업, 산업응용기술개발사업, 기술기반조성사업 등 4대 사업부문에 대해서는 (ⅰ) 정보통신 기술능력의 축적, (ⅱ) 정보통신산업의 경쟁력 강화, (ⅲ) 정보통신기반의 기술고도화, (ⅳ) 정보화를 위한 기술역량의 제고 등 주요 사업의 편익을 나타내는 4개 기준으로 우선 순위를 판단하였고, 정보통신망기술, 전파 및 RF 기술, 정보처리기술, 반도체 소자/설계 기술 등 13개 기술분야에 대해서는 (ⅰ) 공공정책적 임무에 대한 기여, (ⅱ) 기술자립기반의 확충, (ⅲ) 기술발전성과 기술적 파급효과, (ⅳ) 기술적 산물의 시장잠재력 등 기술분야 연구개발을 통한 편익을 나타내는 4개 기준으로 우선순위를 판단하였다. 우선순위는 사업대안에 대한 가중치로 표시되었고, 적정 자원배분방안은 추정된 총예산 규모에 따라 지원수준에 대한 일정한 제약조건 하에서 비용-편익 관계에 따른 자원의 최적 할당량으로 제시되었다. 본 연구는 총예산 규모의 가변성, 사업 및 기술분야 대안의 분류체계에 대한 공감대 부족, 사업목표의 상호연관성과 우선순위 판단기준의 부분적 중첩성 등 여러 제약요인이 있어 도출된 구체적인 수치보다는 방향성에 더 큰 의미를 부여하는 것이 바람직하다. 그러나, 이러한 연구의 한계에도 불구하고 도출된 우선순위와 적정 자원배분방안은 문제해결의 실행타당성을 감안하여 비교적 객관적이고 균형있는 결과로 판단된다.

  • PDF

Forest Environment Degradation and Rehabilitation of Copper Mine Area in Ashio, Japan (일본 아시오(足尾) 銅鑛山地域의 삼림황폐와 삼림환경 복구사업에 관한 분석)

    • Korean Journal of Environment and Ecology
    • /
    • v.15 no.3
    • /
    • pp.276-285
    • /
    • 2001
  • This report surveyed degradation of forest environment and rehabilitation in Ashio of Japan. Since 1880, a large scale forestry in this area has been destroyed by sooty smoke, and the local government invested heavily to rehabilitate the damaged forestry and denuded mountains. These degradations are due to complex operations, such as sulfurous acid gas from copper refinery, forest fires, steep slope and disadvantageous climate. The rehabilitation works on degraded forestry(2,399ha) were undertaken by tree planting fur three years from 1897. However, forest degradation and disasters were continued, and the total damaged areas were about 2,400~3,000ha in 1956. A Manual labor method, a Helicopter method and also Combination of manual labor and helicopter method had been adopted to rehabilitation works from 1945 to 1996, while 828.19ha of the degraded mountains was rehabilitated. Total investment for those projects was 80 billion yen. A debris control dam, a soil arresting structure, a vegetation-block, a vegetation sack measures and tree planting have implemented significantly fur the method of rehabilitation. An objective of manual labor works is a complete rehabilitation on each place through 3 stage working. The revived green areas accounted fur 49% of the total, and the entire afforest areas are less than 10%. In coming 25 years, an amount of 21.3 billion yen will be invested to rehabilitate 564ha of degraded mountain lands. However, it is impossible to estimate that how long it will take until the whole degraded mountain lands are completely rehabilitated. Rehabilitation works in Ashio may be applicable to environmental restoration and revegetation in the abandoned coal-mine lands of Korea.

  • PDF

A study about Expert's Opinions for Establishing the Korean Disaster Prevention Village (한국형 방재마을 구축을 위한 전문가 의식조사 연구)

  • Lee, Ji-Hyang;Shin, Ki-Beom;Shin, Ho-Joon;Back, Min-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.113-113
    • /
    • 2011
  • 방재마을만들기는 지역방재개념을 도입하여 마을단위에서 자치단체와 주민들의 참여를 통해 지역자율 방재의식을 고취시키고, 마을에 조성되어 있는 환경적 영향을 고려하여 재해로 인한 취약요인을 조사하고 취약요인이 유사/인접되어 있는 마을을 대상으로 취약요인을 종합적으로 검토한 재해예방사업의 추진이 필요하다. 방재시범마을만들기 구축사업의 계획범위는 동/리 행정구역 단위로 실질적인 생활권 단위로, 생활권 단위에서의 방재관련 사업의 패키지화를 통하여 지역의 자주적 방재역량이 향상되도록 하는 사업으로 현재 방재시범마을은 조성/운영중에 있다. 이에 본 논문에서는 지역방재 실무 담당자, 대학교수, 연구원 등 전문가를 대상으로 의식조사를 실시하여 현 실태조사를 토대로 한국형 방재마을 구축 방안에 대해 도출하고자 한다. 전문가 설문결과 현 지역의 방재대책은 전반적으로 미미하며, 구조적인 부분과 비구조적인 부분 모두 보강되어야함을 알 수 있었다. 그 중에서도 지역주민의 방재에 대한 관심부분은 상당히 부족하다는 것을 알 수 있었다. 방재마을이라는 사업의 이미지는 대부분의 응답자가 재해위험지구의 정비사업 혹은 지역단위의 종합적 방재대책이라는 의견이 다수였으며, 방재마을 전반에 대한 의견으로는 지자체의 추진의지, 방재마을관련 법 제도 정비, 사업예산의 지속적인 확보, 방재마을 홍보 및 주민참여 등의 중요성을 강조하는 의견이 있었다. 이러한 설문결과를 바탕으로 지자체의 추진의지가 어느 정도냐에 따라 사업의 형태를 갖추고 성공할 수 있으며, 지속적으로 사업이 추진될 수 있는 방안 및 사업의 안정적 확보방안이 중요하다는 결론을 도출할 수 있다. 한국형 방재마을 조성을 위해서는 주민참여가 바탕이 되어야 하며, 이를 위해 방재마을 사업을 시민들의 풀뿌리 방재활동과 연계하여 추진하는 것도 요구된다.

  • PDF

A Study on prioroty estimation of GIS cost Using Analystic Hierarchy Process(AHP) (계층분석법을 이용한 GIS 사업추진시 분야별 비용 중요도 우선 순위 평가에 관한 연구)

  • Heo, Yong;Kim, Jung-Ok;Yang, Sung-Chul;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.3 s.21
    • /
    • pp.99-105
    • /
    • 2002
  • In 1995 of May, the Ministry of Construction and Transportation (NOCT) developed the First Nation-wide Master Plan of GIS. It is set up in response to an increasing and various demands on spatial informations. Until now, a set of diverse projects related to spatial information have been proposed and executed. However, cost-benefit analysis of investment and decision making for alternatives have not been carried out appropriately because scientific evaluations for obtaining efficiency and economical validity of investment have been deficient. Optimum decision making for projects based on itemized priority order using effect or cost of proposed alternative plan is a fundamental expedient for demonstration of propriety of projects and enhancement of efficiency of investment. From such understanding, this paper applied the analytic hierarchy process (AHP) technique to the cost required to construct a GIS so that analyze the weight of each cost factor.

  • PDF