• Title/Summary/Keyword: 연계시험기

Search Result 153, Processing Time 0.031 seconds

Turbopump+Gas generator Open-loop coupled test (터보펌프+가스발생기 개회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.125-128
    • /
    • 2008
  • As a interstage of the 30tonf level LOx/kerosene liquid rocket engine development, turbopump-gas generator open-loop coupled tests are performed. Test schematic and test results of open-loop coupled tests are presented. In engine system operation environment simulating combustion chamber by flow control orifice, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator open-loop coupled Test Plant are confirmed The results of open-loop coupled test were used for the preparation on turbopump+gas generator closed-loop test.

  • PDF

Study on Turbopump-Gas Generator Open-Loop Coupled Test (터보펌프-가스발생기 개회로 연계시험 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.5
    • /
    • pp.563-568
    • /
    • 2010
  • Turbopump-gas generator open-loop coupled tests are performed during the development of a 30tonf-LOx/Kerosene rocket engine. In the turbopump-gas generator open-loop tests, the propellants to gas generator are supplied from the outlets of turbopump, while the gas exhausted from the gas generator is vented out to the atmosphere, instead of being used to turbine driving. This paper presents the objectives, procedure, and results of the open-loop coupled test, in addition to a schematic representation of the test apparatus and the operating conditions for the test facility system and control system. The results of turbopump-gas generator open-loop coupled test confirm chill-down procedure, startup characteristics, nominal operability and smooth shutdown of the open-loop coupled Test Plant in test conditions simulating engine system operation environment.

Turbopump+Gas generator Startup Simulation Cold Flow Test (터보펌프+가스발생기 연계시험기 시동모사 수류시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.19-25
    • /
    • 2009
  • This paper includes test results of 30tonf-level TP+GG startup simulation cold flow test using liquid oxygen and kerosene. Test objectives, coupled test plant configuration, test condition, test procedure of performed tests, and test results are presented.

  • PDF

Study on Turbopump and Gas Generator Coupled Tests (터보펌프+가스발생기 연계시험 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.155-158
    • /
    • 2007
  • As a secondary stage of the liquid rocket engine development test, turbopump-gas generator powerpack tests are being performed. The schematics of the test hardware and the test facility for the TP+GG coupled test are presented. The results of a preliminary test results for the verification of the propellant supply system of the test facility are also presented. Based on the preliminary tests results, the verification of the propellants supply systems of the facility system was performed.

  • PDF

Turbopump+Gas generator Closed-loop coupled test (터보펌프+가스발생기 폐회로 연계시험)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.129-132
    • /
    • 2008
  • For the development of the 30tonf level LOx/kerosene liquid rocket engine, turbopump-gas generator closed-loop coupled tests are performed. To simulate engine operation conditions, combustion chamber was substituted by flow control orifices. In simulated engine system operation environment, chill-down procedure, startup characteristics, nominal operability of turbopump+gas generator coupled Test Plant are confirmed. Turbopump and gas generator are confirmed to operate well in simulated engine environment. The control system for regulating power and mixture ratio of Test Plant are also successfully confirmed.

  • PDF

Study on the Characteristics of Turbopump+Gas generator Closed-loop coupled test (터보펌프+가스발생기 폐회로 연계시험 특성 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.38-41
    • /
    • 2009
  • For the technology development of LOx/kerosene liquid rocket engine, turbopump-gas generator closed-loop coupled tests using 30tonf main engine components such as turbopump and gas generator except combustion chamber are performed. In the engine system operation environment, simulating combustion chamber by flow control units, the chill-down procedure, startup characteristics, nominal operability and smooth shutdown of turbopump+gas generator closed-loop coupled Test Plant are successfully confirmed. The serviceability of the turbopump and gas generator are evaluated. The feed-back control system for the turbopump rotational speed and gas generator mixture ratio are also verified. The results of closed-loop coupled test will be used as the technology development for the liquid rocket engine.

  • PDF

Design of Turbopump+Gas Generator Coupled Test (터보펌프+가스발생기 연계시험 설계)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheol-Woong;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.196-200
    • /
    • 2006
  • This paper describes the current development status of the major subsystems, turbopump and gas generator, for a turbopump-fed liquid oxygen-kerosene rocket engine system. As a secondary stage of the liquid rocket engine development test, turbopump-gas generator powerpack tests are planned. The schematics of the test hardware and the test facility for the TP+GG coupled test are presented. The results of a preliminary analysis for operating regimes of the TP+GG coupled test are also presented.

  • PDF

A Test Design and Configuration for Turbopump and Gas Generator Coupled Test (터보펌프 가스발생기 연계시험에서의 시험영역 설정과 설비 설계)

  • Nam, Chang-Ho;Kim, Cheul-Woong;Kim, Seung-Han;Park, Soon-Young
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.107-110
    • /
    • 2008
  • The test range for turbopump and gas generator coupled test was determined considering the engine system test area which cover the qualification and development. Based on the test range, we determined the required loss coefficient for the throttle valves and lines.

  • PDF

Analysis for Operation Point Change in Mode Transition at the Turbopump-Gas Generator Coupled Test (터보펌프-가스발생기 연계시험의 모드 변환 중간 작동점 분석)

  • Nam, Chang-Ho;Kim, Seung-Han;Park, Soon-Young;Kim, Cheul-Woong
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.13 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • The characteristics at the intermediate operation point of the turbopump-gas generator(TP-GG) coupled test were investigated by analytical method. The pump outlet pressure, gas generator mixture ratio, gas generator pressure, and temperature were examined considering risk minimization of test. The engine system shows different behavior from the TP-GG coupled test at the intermediate operation point since the combustion pressure feeds back to the flow rate in the lines. The advanced valve changes in the combustor line helps less risky mode transition.

Human System Interface Design for the Governor Test Equipment (조속기 시험기의 인간-기계 연계 설계)

  • 허태영
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.289-293
    • /
    • 1999
  • 디지털 기술을 기반으로 한 조속기 제어시스템의 제어 알고리즘에 대한 적합성과 하드웨어의 신뢰성 시험을 위한 다이나믹 테스트 베드를 구축하기 위해 증기 터빈 및 발전기의 특성을 그대로 모사하는 시뮬레이터 및 하드웨어를 개발하였으며, 개발된 시뮬레이터를 사용자(시험자)가 그 기능들을 적절하고 편리하게 사용할 수 있도록 인간공학의 원칙을 반영하여 설계하였다. 이를 위해 시뮬레이터가 가져야 하는 기능들을 시험 절차의 분석을 통해 도출하고 그 기능들을 사용 목적에 따라 적절하게 그룹핑하였으며, 가장 빈번하게 사용하는 Mimic Display의 경우 사용자가 항상 확인 가능하도록 주 화면에 구성한 인간-기계 연계 설계에 대해 소개하고자 한다.

  • PDF