• Title/Summary/Keyword: 연간 에너지생산량

Search Result 64, Processing Time 0.025 seconds

Evaluation Study of LCOE for 8 MW Offshore Floating Wind Turbine in Ulsan Region (울산 앞바다 8 MW급 부유식 해상풍력터빈의 LCOE 연구 )

  • Dong Hoon Lee;Hee Chang Lim
    • Journal of Wind Energy
    • /
    • v.14 no.1
    • /
    • pp.5-13
    • /
    • 2023
  • The commercialization has been of great importance to the clean energy research sector for investing the wind farm development, but it would be difficult to reach a social consensus on the need to expand the economic feasibility of renewable energy due to the lack of reliable and continuous information on levelized cost of Energy (LCOE). Regarding this fact, this paper presents the evaluation of LCOE, focusing on Ulsan offshore region targeting to build the first floating offshore wind farm. Energy production is estimated by the meteorology data combined with the Leanwind Project power curve of an exemplar wind turbine. This work aims to analyze the costs of the Capex depending on site-specific variables. The cost of final LCOE was estimated by using Monte-Carlo method, and it became an average range 297,090 KRW/MWh, a minimum of 251,080 KRW/MWh, and a maximum of 341,910 KRW/MWh. In the year 2021, the SMP (system marginal price) and 4.5 REC (renewable energy certificate) can be paid if 1 MWh of electricity is generated by renewable energy. Considering current SMP and REC price, the floating platform industry, which can earn around 502,000 KRW/MWh, can be finally estimated highly competitive in the Korean market.

Analysis of Wind Energy Potential on the West Coast of South Korea Using Public Data from the Korea Meteorological Administration (기상청 공공데이터를 활용한 대한민국 서해안 일대의 바람자원 분석)

  • Sangkyun Kang;Sung-Ho Yu;Sina Hadadi;Dae-Won Seo;Jungkeun Oh;Jang-Ho Lee
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.14-24
    • /
    • 2023
  • The significance of renewable energy has been on the rise, as evidenced by the 3020 renewable energy plan and the 2050 carbon neutrality strategy, which seek to advance a low-carbon economy by implementing a power supply strategy centered around renewable energy sources. This study examines the wind resources on the west coast of South Korea and confirms the potential for wind power generation in the area. Wind speed data was collected from 22 automatic weather system stations and four light house automatic weather system stations provided by the Korea Meteorological Administration to evaluate potential sites for wind farms. Weibull distribution was used to analyze the wind data and calculate wind power density. Annual energy production and capacity factors were estimated for 15-20 MW-class large wind turbines through the height correction of observed wind speeds. These findings offer valuable information for selecting wind power generation sites, predicting economic feasibility, and determining optimal equipment capacity for future wind power generation sites in the region.

Optimal Design of PM Wind Generator Based on Genetic Algorithm Combined with Mesh Adaptive Direct Search (MADS를 결합한 GA 기반의 풍력발전기 최적설계)

  • Ahn, Young-Jun;Park, Ji-Seong;Lee, Chel-Gyun;Kim, Jong-Wook;Kim, Yong-Jae;Jung, Sang-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.615_616
    • /
    • 2009
  • 유한요소해석(Finite Element Analysis)을 통한 풍력발전기 최적설계시, 해석 특성상 발생하는 막대한 소요시간의 개선이 필요하다. 본 논문에서는 연간 에너지 생산량(Annual Energy Production : AEP)의 최대화를 목표로 GA(Genetic Algorithm)와 MADS(Mesh Adaptive Direct Search)를 결합한 혼합 알고리즘을 이용하여 최적설계를 수행하였다. 또한, 혼합 알고리즘과 병렬분산 유전알고리즘을 이용한 최적설계의 해석 소요시간을 비교 및 검토하였다.

  • PDF

Power performance Testing of Small Wind Turbine Generator System (소형 풍력발전시스템의 출력성능검사)

  • Kim, Hyeon-Ki;Kim, Byeong-Min;Yoo, Neung-Soo
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.123-128
    • /
    • 2011
  • In this study, procedures, a power performance testing system of Wind Turbine System Research Center of Kangwon National University is introduced. Test prodedures and results are presented on a stand-alone vertical-axis 200W wind turbine manufactured by Geum-Poong Energy Inc.. Power performance test is performed according to IEC standard. The test results are compared with the power performance standard. Also, the effects of normalization and disturbed sectors are considered.

  • PDF

Analysis of Small Hydropower Resource Characteristics for Nakdong River System (낙동강수계의 소수력자원 특성 분석)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.6
    • /
    • pp.68-75
    • /
    • 2012
  • Small hydropower is one of the many types of new and renewable energy, which is planning to develop, as the country is abundant in endowed resources. In order to fully utilize small hydropower resources, there is a need for greater precision in quantifying small hydropower resources and establish an environment in which energy sources can be discovered using the small hydropower resource management system. This study has given greater precision to calculate annual electricity generation and capacity of small hydropower plants of Nakdong river system by inquiring into average annual rainfall, basin area and runoff coefficient, which is anticipated to promote small hydropower resources utilization. Small hydropower resource management system was also established by additionally providing base information on quantified small hydropower resources and analysis function and small hydropower generator status, rivers, basin, rainfall gauging station, water level gauging station etc.. Small hydropower resource management system can be used gather basic information for positive applications of small hydropower energy nationwide.

A Study on the Performance Prediction Technique for Small Hydro Power Plants (소수력발전소의 성능예측 기법)

  • Park, Wan-Soon;Lee, Chul-Hyung
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.14 no.1
    • /
    • pp.61-68
    • /
    • 2003
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction technique for small hydro power(SHP) Plants and its application. The flow duration curve can be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction technique has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique, Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated, It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

Primary Production and Nutrients Distribution in 22-year-old Pinus koraiensis and Quercus mongolica Stands in Kwangju District (경기도 광주지방 22년생 잣나무 및 신갈나무림의 물질생산량과 무기영양물분포)

  • Lee, Kyong-Jae;Park, In-Hyeop
    • Journal of Korea Foresty Energy
    • /
    • v.7 no.1
    • /
    • pp.11-21
    • /
    • 1987
  • To estimate the biomass, net production and nutrient distribution of Pinus Koraiensis and Quercus mongolica stand, experimental plots located in Kwangju of Kyonggi-do were selected. Ten sample trees selected account of DBH distribution were felled and the diagram of oven-dry weight distrubution of leaves, branches and stems for each 1m segment was constructed. The logarithmic regression equations between dry weight of each component and the variable of $(DBH)^2$ H obtained. The standing crops were estimated to be as much as 152.07 and 156.02 tons of dry matter per hectare in P. koraiensis and Q. mongolica stand respectively. The net production was estimated as 24.66 and 20.35t/ha$\cdot$yr and the net assimilation rate was 1.90 and 3.42kg/kg$\cdot$yr in same order. Particulary large proportions of nitrogen. calcium and magnesium were found in soil of P. koraiensis stand, phosphours and potassium in overstory of it. At Q. mongolica stand, large proportions of nitrogen. phosphorus. potassium and magnesium were found in soil and calcium in overstory. The amounts of litter fall was 4.013t/ha$\cdot$8 months in P. koraiensis stand and 3.490t/ha$\cdot$8 months in Q. mongolica stand.

  • PDF

Optimization Process Models of Gas Combined Cycle CHP Using Renewable Energy Hybrid System in Industrial Complex (산업단지 내 CHP Hybrid System 최적화 모델에 관한 연구)

  • Oh, Kwang Min;Kim, Lae Hyun
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.65-79
    • /
    • 2019
  • The study attempted to estimate the optimal facility capacity by combining renewable energy sources that can be connected with gas CHP in industrial complexes. In particular, we reviewed industrial complexes subject to energy use plan from 2013 to 2016. Although the regional designation was excluded, Sejong industrial complex, which has a fuel usage of 38 thousand TOE annually and a high heat density of $92.6Gcal/km^2{\cdot}h$, was selected for research. And we analyzed the optimal operation model of CHP Hybrid System linking fuel cell and photovoltaic power generation using HOMER Pro, a renewable energy hybrid system economic analysis program. In addition, in order to improve the reliability of the research by analyzing not only the heat demand but also the heat demand patterns for the dominant sectors in the thermal energy, the main supply energy source of CHP, the economic benefits were added to compare the relative benefits. As a result, the total indirect heat demand of Sejong industrial complex under construction was 378,282 Gcal per year, of which paper industry accounted for 77.7%, which is 293,754 Gcal per year. For the entire industrial complex indirect heat demand, a single CHP has an optimal capacity of 30,000 kW. In this case, CHP shares 275,707 Gcal and 72.8% of heat production, while peak load boiler PLB shares 103,240 Gcal and 27.2%. In the CHP, fuel cell, and photovoltaic combinations, the optimum capacity is 30,000 kW, 5,000 kW, and 1,980 kW, respectively. At this time, CHP shared 275,940 Gcal, 72.8%, fuel cell 12,390 Gcal, 3.3%, and PLB 90,620 Gcal, 23.9%. The CHP capacity was not reduced because an uneconomical alternative was found that required excessive operation of the PLB for insufficient heat production resulting from the CHP capacity reduction. On the other hand, in terms of indirect heat demand for the paper industry, which is the dominant industry, the optimal capacity of CHP, fuel cell, and photovoltaic combination is 25,000 kW, 5,000 kW, and 2,000 kW. The heat production was analyzed to be CHP 225,053 Gcal, 76.5%, fuel cell 11,215 Gcal, 3.8%, PLB 58,012 Gcal, 19.7%. However, the economic analysis results of the current electricity market and gas market confirm that the return on investment is impossible. However, we confirmed that the CHP Hybrid System, which combines CHP, fuel cell, and solar power, can improve management conditions of about KRW 9.3 billion annually for a single CHP system.

An Accuracy Estimation of AEP Based on Geographic Characteristics and Atmospheric Variations in Northern East Region of Jeju Island (제주 북동부 지역의 지형과 대기변수에 따른 AEP계산의 정확성에 대한 연구)

  • Ko, Jung-Woo;Lee, Byung-Gul
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.3
    • /
    • pp.295-303
    • /
    • 2012
  • Clarify wind energy productivity depends on three factors: the wind probability density function(PDF), the turbine's power curve, and the air density. The wind PDF gives the probability that a variable will take on the wind speed value. Wind shear refers to the change in wind speed with height above ground. The wind speed tends to increase with the height above ground. also, Wind PDF refers to the change with height above ground. Wind analysts typically use the Weibull distribution to characterize the breadth of the distribution of wind speeds. The Weibull distribution has the two-parameter: the scale factor c and the shape factor k. We can use a linear least squares algorithm(or Ln-least method) and moment method to fit a Weibull distribution to measured wind speed data which data was located same site and different height. In this study, find that the scale factor is related to the average wind speed than the shape factor. and also different types of terrain are characterized by different the scale factor slop with height above ground. The gross turbine power output (before accounting for losses) was caculated the power curve whose corresponding air density is closest to the air density. and air desity was choose two way. one is the pressure of the International Standard Atmosphere up to an elevation, the other is the measured air pressure and temperature to calculate the air density. and then each power output was compared.

A Study on the Validity of Rural Type Low Carbon Green Village Through Case Analysis (사례분석을 통한 농촌형 저탄소 녹색마을 타당성 검토)

  • Do, In-Hwan;Hwang, Eun-Jin;Hong, Soo-Youl;Phae, Chae-Gun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.12
    • /
    • pp.913-921
    • /
    • 2011
  • This study examined the overall feasibility of low carbon green village formed in rural area. The check method is analyzing its environmental and economic feasibility and energy self-reliance. The biomass of the villages was set as 28 ton/day of livestock feces and 2 ton/day of cut fruit tree branches which make up the total of 30 ton/day. The facility consisted of a bio gasfication facility using wet (livestock feces) biomass and combined heat power generator, composting facility and wood boiler using dry (cut fruit tree branches) biomass. When operating the system, 540,540 kWh/yr of electricity and 1,762 Gcal/yr of heat energy was produced. The region's electricity energy and heat energy self-reliance rate will be 100%. The economic feasibility was found as a loss of 140 million won where the facility installation cost is 5.04 billion won, operation cost is 485.09 million won and profit is 337.12 million won. There will be a loss of about 2.2 billion won in 15 years but in the environmental analysis, it was found that crude replacement effect is about 178 million won, greenhouse gas reduction effect is about 92 million won making up the total environmental benefit of 270 million won. This means, there will be a yearly profit of about 130 million won. In terms of its environmental and economic feasibility and energy self-reliance, this project seemed to be a feasible project in overall even if it manages to get help from the government or local government.