1 |
Park, W. S., Lee, C. H., and Shim, M. P., "Feasibility Assessment for Small Hydro Power Sitesin Korea", KSCE, Vol.17, No. II-3, 1997.
|
2 |
Park, W. S., Lee, C. H, "The Study of Performance Prediction Methods for Small Hydro Power Sites", KWRA, 2003.
|
3 |
Kim, K. H., et al., "Determination of the Optimal Installation Capacity of Small Hydro Power through the use of Economic Analysis", KWRA, Vol.40, No.12, 2007.
|
4 |
Park, W. S., Lee, C. H, "Hydrologic Performance Characteristics Variation of Small Scale Hydro Power Plant with Variation of Inflow", KWRA, Vol.43, No.4, 2010
과학기술학회마을
DOI
ScienceOn
|
5 |
Park, W. S., Lee, C. H., "Analysis of Performance Characteristics for Small ScaleHydro Power Plantwith Long Term Inflow Condition Change", KSNRE, Vol.5, No.4, 2009.
|
6 |
WAMIS: Water Management Information System
|
7 |
Kang, Y. H. et al., "The Establishment of New and Renewable Energy Resource Map & Utilization System", KIER, 2011
|