A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

Comparative Studies on Heating and Cooling Loads' of a Building Varied by Annual Weather Data (연도별 기상데이터를 활용한 건물의 냉.난방부하 특성 비교)

  • Lee, Ji-Hoon;Hwang, Kwang-Il
    • Journal of Navigation and Port Research
    • /
    • v.35 no.3
    • /
    • pp.265-270
    • /
    • 2011
  • The purpose of this study is to compare and analyze the differences of a building's heating and cooling loads depending on the weather variation. Followings are the results. The temperature, humidity and wind speeds of standard year are bigger than those of 2006~2009. The 2006~2009's total horizontal solar irradiance is greater than that of standard year, and the direct solar irradiance of standard year is bigger in winter and vice versa in summer. As results of simulation on heating and cooling loads, it is difficult to find out the bilateral influences between maximum thermal loads and annual's. The equivalent-time operating ratio(EOR) is defined on this study to estimate the differences between year and year, and the EOR of standard year shows low value comparing to 2006~2009 years'.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.