• Title/Summary/Keyword: 역별 수요

Search Result 16, Processing Time 0.02 seconds

Development of an Algorithm for Estimating Subway Platform Congestion Using Public Transportation Card Data (대중교통카드 자료를 활용한 도시철도 승강장 혼잡도 추정 알고리즘 개발)

  • Lee, Ho;Choi, Jin-Kyung
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.270-277
    • /
    • 2015
  • In some sections of the Seoul Metropolitan Subway, severe congestion can be observed during rush hours and on specific days. The subway operators have been conducting regular surveys to measure the level of congestion on trains: the results are then used to make plans for congestion reduction. However, the survey has so far focused just on train' congestion and has been unable to determine non-recurring congestion due to special events. This study develops an algorithm to estimate the platform congestion rate by time using individual public transportation card data. The algorithm is evaluated by comparison of the estimated congestion rate and the ground truth data that are actually observed at non-transfer subway stations on Seoul subway line 2. The error rates are within ${pm}2%$ and the performance of the algorithm is fairly good. However, varying walking times from gates to platforms, which are applied to both non-peak periods and peak time periods, are needed to improve the algorithm.

A Study on the Response Plan by Station Area Cluster through Time Series Analysis of Urban Rail Riders Before and After COVID-19 (COVID-19 전후 도시철도 승차인원 시계열 군집분석을 통한 역세권 군집별 대응방안 고찰)

  • Li, Cheng Xi;Jung, Hun Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.3
    • /
    • pp.363-370
    • /
    • 2023
  • Due to the spread of COVID-19, the use of public transportation such as urban railroads has changed significantly since the beginning of 2020. Therefore, in this study, daily time series data for each urban railway station were collected for three years before COVID-19 and after the spread of COVID-19, and the similarity of time series analysis was evaluated through DTW (Dynamic Time Warping) distance method to derive regression centers for each cluster, and the effect of various external events such as COVID-19 on changes in the number of users was diagnosed as a time series impact detection function. In addition, the characteristics of use by cluster of urban railway stations were analyzed, and the change in passenger volume due to external shocks was identified. The purpose was to review measures for the maintenance and recovery of usage in the event of re-proliferation of COVID-19.

Comparative Analysis of Estimation of Demand for Urban Railway Stations and Forecast of Transportation Facilities Size Prediction (도시철도역 이용수요 추정 및 이동편의시설 규모 예측 비교 분석)

  • Kim, Hwang Bae;Lee, Sang Hwa;Bae, Choon Bong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.877-886
    • /
    • 2019
  • The size of the subway entrance should be calculated according to the user's demand, but Korea has the same size for each entrance by applying a uniform value. Recently, the installation of mobile convenience facilities such as escalators, elevators, etc. is mandated by the traffic weakness promotion law, but it is inconvenient to use the existing stations because it is mainly arranged in the place where it can be installed regardless of user demand. This study aims to establish a model for estimating the size of mobile convenience facilities by predicting the use demand of each station entrance so that the location and size of mobile facilities can be reflected in the design or construction of the station. To this end, a multiple regression model was established to forecast daily demand by utilizing the demand for getting on and off by station and the building association area for each purpose around the railway station. The actual data of Dongdaemun and Jonggak Stations were used to verify the estimated model. In addition, the escalator installation scale was compared / analyzed by doorway using domestic and overseas escalator equations. As a result, it was more accurate to estimate the usage demand for a single station. Also, Jonggak Station has an up and down escalator installed at exit 1, but it was analyzed that it is appropriate to install at exit 4. This study is an advanced form of the essay model for estimating the users of the entrance and exit users of urban railway stations published in 2018. In addition, it seems to be the basis of the current escalator installation criteria.

Modeling the Distribution Demand Estimation for Urban Rail Transit (퍼지제어를 이용한 도시철도 분포수요 예측모형 구축)

  • Kim, Dae-Ung;Park, Cheol-Gu;Choe, Han-Gyu
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.2
    • /
    • pp.25-36
    • /
    • 2005
  • In this study, we suggested a new approach method forecasting distribution demand of urban rail transit usign fuzzy control, with intend to reflect irregularity and various functional relationship between trip length and distribution demand. To establish fuzzy control model and test this model, the actual trip volume(production, attraction and distribution volume) and trip length (space distance between a departure and arrival station) of Daegu subway line 1 were used. Firstly, usign these data we established a fuzzy control model, nd the estimation accuracy of the model was examined and compared with that of generalized gravity model. The results showed that the fuzzy control model was superior to gravity model in accuracy of estimation. Therefore, wwe found that fuzzy control was able to be applied as a effective method to predict the distribution demand of urban rail transit. Finally, to increase the estimation precision of the model, we expect studies that define membership functions and set up fuzzy rules organized with neural networks.

A Study of the Proper Sizing of a Subway Station Waiting Area (도시철도 대기공간의 적정규모 산정에 관한 연구)

  • Kim, Jonghwang;Baek, Sungjoon;Nam, Doohee
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.262-269
    • /
    • 2016
  • Subway station scales are determined by peak predictions. In this study, the purpose behind the installation of a subway is public transportation convenience and public interest, but economic validity is also important. By proving that the scale of the station is excessive with regard to the target station size for Seoul subway Line 5-8, a reasonable plan. can be sought. According to station installation standards, the area of the station under investigation here is out of the service levels by six stages (A~F), and it must be four or more levels (D). The Actual level for the B level is a two-step design. The Actual ratio for over- Peak predictions is only 17.8% on average. The results of measurements of the excess area and determination of the excessive costs were analyzed by subdividing the area and by calculating it based on the B level, finding that it is possible to provide benefits for customers only in the current design, with an area ratio of 16.3%. Given the weight, it was estimated that current conditions can meet the needs of only 18.6% of the current area. Simplifying the scale calculation method of the station, it is convenient, safe, and advantageous to move citizens only if the scale can be streamlined. Then, with a reduced initial investment, maintenance costs during the operation can be reduced.

A Study on Inaccuracy in Urban Railway Ridership Estimation (도시철도 교통량 추정의 오차발생 요인 연구)

  • Kim, Kang-Soo;Kim, Ki Min
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.6
    • /
    • pp.589-599
    • /
    • 2014
  • This paper analyzes the forecasting errors of traffic volumes by comparing forecasted volumes for the opening year with the observed ones in the years after the urban railway construction in the metropolitan areas. The result shows that the average inaccuracy of traffic volumes for each station was estimated at around 7.27. Based on the confirmed factors of demand estimation errors, this study seeks for an alternative method to reduce estimation errors in feasibility studies. It is noted that there is a tendency that the inaccuracy varies by regions and the longer construction period or the shorter station spacing is, the overestimation increases. If urban railway projects are proceeded as planed, therefore, the level of the inaccuracy for traffic volume forecast will be decreased. In addition, thanks to the theoretical progress, recent estimation results show higher accuracy than before. In that sense, when we introduce the new railway line, it is necessary to make an accurate and realistic demand forecast based on actual outcomes and tendency of the previous estimation. The limitation of our study is that we only cover the errors of the initial period, the opening year and deal with the exogenous variables. Further research including other variables which might be considered to cause overestimation or errors would be needed for increasing the estimation accuracy of traffic volumes.