• Title/Summary/Keyword: 여굴

Search Result 50, Processing Time 0.019 seconds

Effects of free surface using waterjet cutting for rock blasting excavation (워터젯 자유면을 이용한 암반발파 굴착공법의 효과)

  • Oh, Tae-Min;Cho, Gye-Chun;Ji, In-Taeg
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.49-57
    • /
    • 2013
  • The conventional blasting method generates serious blasting vibration and underbreak/overbreak in spite of its high efficiency for rock excavation. To overcome these disadvantages, this paper introduces an alternative excavation method that combines the conventional blasting process with the free surface on the perimeter of the tunnel face using waterjet cutting technology. This proposed excavation method has advantages of (1) reducing vibration and noise level; (2) minimizing underbreak and overbreak; and (3) maximizing excavation efficiency. To verify the effects of the proposed excavation method, field tests were performed with a smooth blasting method at the same excavation conditions. Test results show that the vibration is reduced by up to 55% and little underbreak/overbreak is generated compared with the smooth blasting method. In addition, the excavation efficiency of the proposed method is greater than that of the smooth blasting method. The proposed blasting method with a free surface using waterjet cutting can be applied to urban excavation construction as well as to underground structure construction.

A Study on the Thermal Crack Control of Tunnel Lining Concrete due to the Overbreak (과다 여굴에 따른 터널 라이닝콘크리트의 온도균열 제어 연구)

  • 장동일;채원규;조광현;김광일;손영현
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.215-220
    • /
    • 1998
  • 터널공사에서는 지산의 강도에 따라 선정된 굴착공법을 이용하여 굴착 된 단면에는 굴삭된 터널의 안전과 시공상 능률을 증진시키고, 장기간에 걸친 터널의 사용에 대한 충분한 신뢰성을 갖추기 위하여 지지공$\cdot$라이닝콘크리트 등이 설치된다. (중략)

  • PDF

Review of the Application of Artificial Intelligence in Blasting Area (발파 분야에서의 인공지능 활용 현황)

  • Kim, Minju;Ismail, L.A.;Kwon, Sangki
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.44-64
    • /
    • 2021
  • With the upcoming 4th industrial revolution era, the applications of artificial intelligence(AI) and big data in engineering are increasing. In the field of blasting, there have been various reported cases of the application of AI. In this paper, AI techniques, such as artificial neural network, fuzzy logic, generic algorithm, swarm intelligence, and support vector machine, which are widely applied in blasting area, are introduced, The studies about the application of AI for the prediction of ground vibration, rock fragmentation, fly rock, air overpressure, and back break are surveyed and summarized. It is for providing starting points for the discussion of active application of AI on effective and safe blasting design, enhancing blasting performance, and minimizing the environmental impact due to blasting.

Tunnel Stability Assessment Considering Rock Damage from Blasting Near to Excavation Line (굴착선 주변공 발파의 암반손상을 고려한 터널 안정성 검토)

  • 이인모;윤현진;이형주;이상돈;박봉기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.4
    • /
    • pp.167-178
    • /
    • 2003
  • Damage and overbreak of the remaining rock induced by blasting can not be avoided during tunnel construction which may result in either short-term or long-term tunnel instability. Therefore, in this paper, a methodology to take into account the effect of blast-induced damage in tunnel stability assessment is proposed. Dynamic numerical analysis was executed to evaluate damage and overbreak of the remaining rock for the most common blasting pattern in road tunnel. Rock damage was quantified by utilizing the damage variable factor which is adopted proposed in continuum damage mechanics. The damaged rock stiffness and the damaged failure criteria are used to consider the effect of rock damage in tunnel stability analysis. The damaged geological strength index of the damaged rock was newly proposed from the relationship between deformation modulus and geological strength index. Also the Hoek-Brown failure criteria of the damaged rock was obtained using the damaged geological strength index. Analysing the tunnel stability with the consideration of the blast-induced damage of remaining rock, it was found that the extend of plastic zone and deformation increased compared to the undamaged rock. Therefore the short-term or long-term tunnel stability will be threatened when the rock damage from blasting is ignored in the tunnel stability analysis.

A Study on Assessment of Advance and Overbreak in Underground Excavation Utilizing 3D Scanner (3D 스캐너를 이용한 지하공동의 굴진장 및 여굴 평가 기초연구)

  • Noh, You-Song;Kim, Jung-Kyu;Ko, Young-Hun;Kim, Seong-Jun;Chung, So-Keul;Yang, Hyung-Sik
    • Explosives and Blasting
    • /
    • v.33 no.4
    • /
    • pp.1-6
    • /
    • 2015
  • Abstract This study is to efficiently calculate and evaluate the elements of advance, overbreak and underbreak on the mine under the production using the 3D laser scanner. For this purpose, a 3D laser scanner was sued to acquire the point-cloud which records the space coordinates and modelling of the underground tunnel using the 3D modeling program. When each element was observed through the study result, the advance on the center cut was 2.6m in average while the total advance was 2.4m. If the drilling length of 3.8m is based, the advance rate was evaluated to be 67% in average in the center cut section with the total average of 64%. In addition, when the volume of overbreak was measured based on the design cross section, the average overbreak volume was found to be $4.5m^3$ on left wall, $4.5m^3$ on right wall, and $5m^3$ on roof with the total volume of $14m^3$. When the overbreak volume is measured based on the look-out cross section, it was $3m^3$ on roof with the total volume of $8.4m^3$. The rate of overbreak volume against the average excavation volume was 8% based on the design cross section and 5% based on the look-out cross section.

The Study on the Development of Automated Program for Tunnel Blasting (터널발파 패턴설계 자동화 프로그램의 개발에 관한 연구)

  • 김광염;최영민;이정인
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.51-54
    • /
    • 1999
  • 현재 국내에서 시공되고 있는 터널 발파 패턴의 경우 현장암반조건과 발파조건 등 발파에 영향을 미치는 제반 여건을 정량적으로 고려한 컴퓨터에 의한 자동설계가 이루어지지 않고 있다. 그러므로 경험적이고 정성적인 방법에 의하여 터널 발파 설계가 이루어짐으로써 발파설계와 시공이 불일치하고 여굴 및 주변 손상권의 확대로 인한 터널 보강에도 영향을 미치는 등 문제점이 있다. 또한 최근에 들어와서 터널 발파 공사가 인가 근처에서 이루어 질 경우 발파진동에 의한 민원을 야기하고 있어 이를 고려한 안전 발파 설계가 절실히 요구되고 있다. (중략)

  • PDF

Comparison of the GPR response of the cavity behind the tunnel lining before and after the backfill grouting (터널 콘크리트 라이닝 배면공동 뒷채움 전후의 GPR 반응)

  • Moon, Yoon-Sup;Ha, Hee-Sang;Ko, Kwang-Beom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.191-194
    • /
    • 2008
  • The cavity behind the tunnel lining, caused by overbrake, might be cause a severe instability during tunnel construction. So backfill grouting is essentially required. GPR(Ground penetrating Radar) is widely used to identify the position and size of the cavity and to verify the effect of the backfill grouting. In this study, GPR survey with 450 MHz antenna was implied to access the effect of the backfill grouting before and after the work to the crown part of ○○ tunnel in Seoul respectively. The result of GPR survey conducted before the backfill, was revealed that cavities behind the lining were existed in the areas of 8 spans. Finally, from the GPR survey implied after backfilling, it was turned out that backfill grouting was successfully carried out. Also, GPR survey was ascertained the better contact between lining and rock base at arrangement of bar span.

  • PDF

The Development of Survey System for Efficiency Improvement of Tunnel Work (터널공사의 효용성 향상을 위한 측량시스템 개발)

  • Park Ha-Dong;Im Hon-Ryang;Jung Sung-Heuk;Choi Seok-Keun
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.125-130
    • /
    • 2006
  • 본 연구는 터널공사현장을 대상으로 기존의 터널 측량 방법에서의 문제점을 분석하여 오차요인과 경비절감 문제등을 해결할 수 있는 측량시스템을 개발하여 기존방법과 본 연구방법을 적용하여 측량 및 시공하였을 경우를 비교 분석함으로써 공정관리의 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book을 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 종래의 터널 측량시 오차발생을 최소화하고, 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공풀질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

Effect of the Drilling & Blasting Conditions on the Range of Overbreak in Tunel Excavation (터널굴착시 천공 및 발파조건이 여굴의 크기에 미치는 영향)

  • Kim, Gyung-Hun;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.24 no.B
    • /
    • pp.3-17
    • /
    • 2004
  • Overbreak, underbreak and range of disturbed rock zone (DRZ) are the most important factors in evaluating the results of tunnel blasting. These factors, which depend on the discontinuities in rock mass, the blasting patterns and drilling conditions, have been studied. The range of DRZ can be estimated by relationships between vibration velocity and associated tensile stress. A new computerized rocket jumbo drill has been adopted to reduce overbreak based on the analysis of drilling accuracy. In-situ blasting tests were also performed by varying initiating systems. Overbreak can be reduce from 34.5cm to 20cm. The range of DRZ is 0.2m with stoping holes and 0.4m with wall holes respectively. In addition, some methods to reduce DRZ have been presented in this study.

  • PDF