Introduction of the M(i,j,k)BCP and Risk Assessment of Underground Limestone Mine (재난관리체계(M(i,j,k)BCP) 제안과 석회석광산의 리스크 평가)

  • Lee, Seong Min;Kim, Sun-Myung;Lee, Yeon Hee
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.383-392
    • /
    • 2012
  • This study introduces $M_{(i,j,k)}BCP$ (Mining Business Continuity Planning) which is the smart management system of mine disasters to achieve the safe and eco-friendly mining. Where, 'i' is mine kinds, 'j' is mining processes, and 'k' is risks at process respectively. By specifically setting 'i=1=limestone mine', this study also suggests that $M_{(i,j,k)}BCP$ is the smart management system of limestone mine. Mining risks used in this study were obtained from professional survey and literature review. This study classified these risks by five different mining processes and reduced risk numbers approximately 60 to 26. And they were all allocated into $M_{(i,j,k)}BCP$ and assessed. To do assess risks, this study used four risk indexes which are probability, casualty, facility loss, and discontinuity respectively. By the results of the assessment of risks, results could be four specific groups based on their causes and impacts. In addition, one of the results showed that the most possible risks at limestone mine was the roof-fall and rock-fall in digging process. This result means that $M_{(1,2,1)}BCP$ should be established as a first priority at limestone mine.

Development of integrated disaster mapping method (II) : disaster mapping with risk analysis (통합 재해지도 작성 기법 개발(II) : 리스크 분석을 적용한 재해지도 작성)

  • Park, Jun Hyung;Kim, Byunghyun
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.1
    • /
    • pp.85-97
    • /
    • 2022
  • In this study, a method for an integrated flood risk mapping was proposed that simultaneously considers the flood inundation map indicating the degree of risk and the disaster vulnerability index. This method creates a new disaster map that can be used in actual situations by providing various and specific information on a single map. In order to consider the human, social and economic factors in the disaster map, the study area was divided into exposure, vulnerability, responsiveness, and recovery factors. Then, 7 indicators for each factor were extracted using the GIS tool. The data extracted by each indicator was classified into grades 1 to 5, and the data was selected as a disaster vulnerability index and used for integrated risk mapping by factor. The risk map for each factor, which overlaps the flood inundatoin map and the disaster vulnerability index factor, was used to establish an evacuation plan by considering regional conditions including population, assets, and buildings. In addition, an integrated risk analysis method that considers risks while converting to a single vulnerability through standardization of the disaster vulnerability index was proposed. This is expected to contribute to the establishment of preparedness, response and recovery plans for providing detailed and diverse information that simultaneously considers the flood risk including social, humanistic, and economic factors.

Construction Workers' Occupational Risk of On-Site Travelling Activities (건설공사 근로자의 현장내 이동작업시 발생하는 재해위험도)

  • Yi Kyoo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.120-127
    • /
    • 2005
  • This study examines the occurrence of accidents when workers were travelling on construction sites and the differences in risk involved in each occupation. An analysis of 750 fatal accident reports found that in 138 cases, the fatality occurred when the workers were travelling on site. The 138 cases were then divided according to occupation and were then examined to determine how the workers in each occupation had been affected by various hazardous situations. There were significant differences in accident occurrence between the occupations and in the various hazardous situations. The results imply that the cultural aspect of each occupation leads to a substantial difference in the possibility of fatal injuries or death and that such differences in risk should be taken into account when planning the workers' movements on site. The findings of this study aim to help workers to understand the risks entailed when travelling on site and also to assist managers in the planning of workers, movements on construction sites.

건강장해요인으로서 일회용 식품포장용기의 리스크 평가

  • 김주홍;임현교
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.572-574
    • /
    • 2003
  • 현대사회의 소비자는 극도의 편리성을 추구하는 경향이 있다. 식품업계에서는 이를 충족시키기 위하여 다양한 형태의 인스턴트 식품을 개발하고 있으며, 이에 따라 식품의 포장용기도 매우 다양해지고, 일회용 식품포장용기의 사용도 급증하고 있다. 일회용 식품포장용기는 그 재질에 따라서 유해물질이 용출되거나 갖가지 형태로 소비자의 건강을 위협하고 있다.(중략)

  • PDF

A Study on BIM based Process Risk Management Model (BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Choi, Myung-Seok;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2010
  • Recently a construction industry introduces information technology that brings about many advantages in the early planning phase, design phase and construction phase. Nevertheless a BIM has a many benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis.

  • PDF

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

Application of Risk-Informed Methods to In-Service Piping Inspection in Framatome Type Nuclear Power Plants (프라마톰형 원전의 배관 가동중검사에 리스크 정보를 활용한 기법 적용)

  • Kim, Jin-Hoi;Lee, Jeong-Seok;Yun, Eun-Sub
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.34 no.4
    • /
    • pp.311-317
    • /
    • 2014
  • The Pressurized water reactor owners group (PWROG) developed and applied a risk-informed in-service inspection (RI-ISI) program, as an alternative to the existing ASME Section XI' sampling inspection method. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significance (HSS) locations where failure mechanisms are likely to be present. Additionally, the RI-ISI program can reduce nondestructive evaluation (NDE) exams, man-rem exposure for inspectors, and inspection time, among other benefits. The RI-ISI method of in-service piping inspection was applied to 3 units (KSNPs: Korea standard nuclear power plants) and is being deployed to the other units. In this paper, the results of RI-ISI for a Framatome type (France CPI) nuclear power plant are presented. It was concluded that application of RI-ISI to the plant could enhance and maintain plant safety, as well as provide the benefits of greater reliability.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Suggestion of a Check List to Prevent Fall Incidents Through Case Analysis of Electric Shutters in Buildings (건축물 전동셔터 사례 분석을 통한 추락방지 체크리스트 제안)

  • Jung, Young-Min;Bang, Hong-Soon;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.259-268
    • /
    • 2022
  • Electric shutters for buildings are being developed in Korea and abroad on a regular basis and can be used in different types of buildings such as company buildings and fire stations, etc. However, the fall risk factors induced by a variety of functions of building electric shutters require safety control. We reviewed the technological trends and legal standards in Korea and abroad, analyzed incident cases, and identified fall risk factors requiring control. We inspected all the building electric shutters in Korea based on the fall risk factors. As a result, we identified 91 noncompliance cases, in 69 percent of all 132 locations. In this study, backed by the inspection results, we suggest a check list to prevent the fall of building electric shutters to ensure safety and conduct verification using a focus group interview.

A Study on the Evacuation Safety Design laws based on the Fire Risk (화재리스크에 기초한 피난안전설계법에 관한 연구)

  • Huh, Ye-rim;Kim, Hye-Won;Lee, Byeong-Heun;Jin, Seung-Hyeon;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.51-52
    • /
    • 2019
  • Currently in domestic, it is difficult to the evacuation in fire due to the building is higher. Therefore it is necessary to evacuation safety design of building. To conduct the evacuation fire design of building, it should be done the Evacuation Safety Verification. But it is not sufficient the Study about Evacuation Safety Verification in currently domestic. Therefore in this study, we conducted the evacuation safety verification using people who they can't the evacuation themselves. The method of verification, we suggest the comparative that people who they can't the evacuation themselves and available safety evacuation time. Available safety evacuation time is determined by determined method from disaster statistics of casualties or equivalence with current standard requirement. it is doing to objectively judge of evacuation safety design validity in building.

  • PDF